159
|
Thursday, October 02, 2014, 11:26 |
John Wong | Empty | | | Maintenance | Broken insulators | Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the |
|
158
|
Thursday, September 25, 2014, 17:35 |
John Wong | Endcaps | 40282-5 | TARGET BOAT | Done | Sintering Ta-coated endcaps (temp measured) | Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated
endcaps. The caps are stacked together. |
|
157
|
Tuesday, September 23, 2014, 18:32 |
John Wong | Empty | 40282-5 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating (with Temp measurement) |
|
|
156
|
Tuesday, September 23, 2014, 15:02 |
Laura Lambert | Empty | 40282-5 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Tuesday, September 23, 2014, 15:00
A new target boat [new design with
no end caps] was sprayed with TaC coating |
|
155
|
Thursday, September 11, 2014, 14:23 |
Laura Lambert | | 40282-3 | TARGET BOAT | Failed | Sintering TaC coated end caps | Thursday, September 11, 2014, 13:14
The target container end caps were
coated with TaC spray and let dry. |
|
154
|
Friday, August 08, 2014, 15:16 |
Laura Lambert | Ta | 38817-9 | HP-SIS | Done | Conditioning Ta target |
|
|
153
|
Thursday, August 07, 2014, 10:13 |
Laura Lambert | | | TARGET BOAT | Failed | Sintering TaC coated end caps |
|
|
152
|
Wednesday, August 06, 2014, 16:10 |
John Wong | Ta | 38817-9 | HP-SIS | In progress | Conditioning Ta target | Wednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs.
Total packed length 4.5cm |
|
151
|
Tuesday, August 05, 2014, 17:20 |
John Wong | | | TARGET BOAT | In progress | Sintering TaC coated end caps |
|
|
150
|
Tuesday, August 05, 2014, 13:13 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coated end caps | Tuesday, August 05, 2014, 12:02
The target container end caps were
coated with TaC spray and let dry. |
|
149
|
Tuesday, August 05, 2014, 12:01 |
Laura Lambert | | 40282-3 | LP-SIS | Done | ZrC #6 conditioning |
|
|
148
|
Friday, August 01, 2014, 13:27 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | Target was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
|
|
147
|
Friday, August 01, 2014, 11:47 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | The maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A |
|
146
|
Tuesday, July 29, 2014, 11:23 |
John Wong | | 40282-3 | LP-SIS | In progress | Sintering ZrC# 6 target |
|
|
145
|
Monday, July 28, 2014, 15:06 |
Laura Lambert | | 40282-3 | LP-SIS | In progress | Sintering ZrC# 6 target | Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite |
|
144
|
Monday, July 28, 2014, 10:52 |
Laura Lambert | Empty | 40282-3 | LP-SIS | Done | Sintering TaC coated target container |
|
|
143
|
Wednesday, July 23, 2014, 15:07 |
John Wong | Empty | 40282-3 | LP-SIS | In progress | Sintering TaC coated target container | Wednesday, July 23, 2014, 15:07
Target container is coated with TaC.
No Ta-heat shields are used. |
|
142
|
Tuesday, June 24, 2014, 23:57 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|
141
|
Monday, June 23, 2014, 09:47 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|
140
|
Friday, June 20, 2014, 16:22 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|