Entry  Tuesday, April 05, 2016, 11:12, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_11 UCxFlk_11.jpg
Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March 31, 2016.
The cast peeled off the glass nicely April 1, 2016 and finished drying over the weekend. [see
Entry  Tuesday, March 08, 2016, 11:19, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_10 UCxFlk_10.jpgUCxFlk_10(2).jpgUCxFlk_10(3).jpgUCxFlk_10-first_time_using_new_set_up.jpgUCxFlk_10_carbonization.jpg
 Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March 2, 2016.
This was the first time using the new rack built for holding multiple casts [see photo attached]
Entry  Monday, September 14, 2015, 15:31, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_09 poor_backing_pump.PNGcurrent_pressure_plot.PNG
 Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic mass = 61.31g
The green was rolled up and wrapped in a piece of graphite sheet.
Entry  Wednesday, August 19, 2015, 11:44, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_08 8x
 Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug 11, 2015. The slurry was cast on a piece of glass coated with WD40
on Aug 12, 2015.
Entry  Monday, May 11, 2015, 11:49, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_06 IMG_20150508_143957199_HDR.jpgstriptool.JPGstriptool-zoom.JPG
 Monday, May 11, 2015, 11:45
UO2/C green was prepared May 6, 2015. The slurry was cast on a piece of glass coated with WD40
on May 7, 2015.
Entry  Monday, January 26, 2015, 11:28, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_05 flk5.jpgstriptool.JPG
 Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.
The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture]
Entry  Tuesday, September 23, 2014, 15:00, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_04 
 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014.
    Reply  Friday, October 10, 2014, 14:00, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_04 archiver_TGHT&VAC.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, September 23, 2014, 14:54
Entry  Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03 carbonization.JPG
 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
Entry  Monday, March 24, 2014, 17:53, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_02 UC2_flakes_batch#09-03242014.PNG
 Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March 21 and let dry over the weekend.  The cast looks pretty good, and it was rolled up and wrapped in a
piece of graphite sheet. 
Entry  Wednesday, February 05, 2014, 14:29, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_01 UO2_cast1.jpgUO2_cast2.jpgUO2_target_boat.jpgpre_auto-ramp.JPG
 Wednesday, February 05, 2014, 14:13
1st attempt: 
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40.
    Reply  Friday, September 20, 2013, 13:49, John Wong, UO2/C, Target Boat #2, , Done, Processing UC2Flk_00 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, September 19, 2013, 15:35
Entry  Thursday, August 22, 2013, 18:00, John Wong, UO2/C, Target Boat #2, , Done, Processing UC2 flaskes (batch#06 - 08222013 UO2_C_cast.PNGUCx_flakes.PNG
Thursday, August 22, 2013, 17:31
1st attempt: 
UO2/C green was prepared on Aug 14, 2013 (wed).  The slurry was cast on a piece of glass coated with WD40.
    Reply  Friday, August 23, 2013, 16:11, John Wong, UO2/C, Target Boat #2, , Problems resolved, Processing UC2 flaskes (batch#06 - 08222013 


    
        
            John Wong wrote:
        
        
            
            Thursday, August 22, 2013, 17:31
    Reply  Tuesday, September 10, 2013, 12:20, Laura Lambert, UO2/C, Target Boat #2, , Done, Processing UC2 flaskes (batch#06 - 08222013 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, April 02, 2013, 17:46, John Wong, UO2/C, Target boat #2, , Done, Processing UC2 flakes for UCx#6 (batch#03 - 02042013) 
Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11, 2013.
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 896.16
Entry  Thursday, July 19, 2012, 17:14, John Wong, UO2/C, Target boat #2, , Done, Processing UC2 flakes for UCx#5 - (batch#02-13062012) TGHT_100A.pngUC2_flakes_0-520A.GIF
Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June 13, 2012. 
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 946.48g left)
Entry  Tuesday, June 25, 2013, 14:49, Laura Lambert, UO2/C, Target boat #2, , Done, Processing UC2 flakes (batch#05 - 18062013) 
 Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June 18, 2013 and let dry over the weekend.
UO2 powder used = 50.25g (Inventory R-00835A UO2 + bottle = 845.94g - before use)
    Reply  Tuesday, June 25, 2013, 16:28, John Wong, UO2/C, Target boat #2, , Done, Processing UC2 flakes (batch#05 - 18062013) 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, June 25, 2013, 14:35
Entry  Tuesday, July 02, 2013, 11:13, Peter Kunz , UO2/C, Target boat #2, , Done, Processing UC2 flakes (batch#05 - 18062013) UO2-C-01.png
 
1. stage - burning off organics complete
2. stage - carbonization began 1-8 am 2013/07/02