Entry  Thursday, February 18, 2016, 15:42, Laura Lambert, UC2, 41077-1, LP-SIS, In progress, Conditioning UCx#15 
 Thursday, February 18, 2016, 15:34
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - same method
    Reply  Friday, February 26, 2016, 10:27, John Wong, UC2, 41077-1, LP-SIS, In progress, Conditioning UCx#15 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, February 18, 2016, 15:34
       Reply  Monday, February 29, 2016, 16:16, Laura Lambert, UC2, 41077-1, LP-SIS, Done, Conditioning UCx#15 UCx_15.jpg


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Thursday, December 10, 2015, 10:59, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, 1stepUCx project - round2 image.jpeg
 Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C discs cast onto graphite.
34 discs = 4.10g
Entry  Friday, December 04, 2015, 15:06, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, 1stepUCx project - round1 
 Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet in the fume hood and let dry.
Initial UO2 powder used = 25.11g (Inventory R-00835A, UO2 + bottle = 243.44g before use)
Entry  Thursday, October 15, 2015, 16:05, John Wong, UC2, 41077-5, LP-SIS, In progress, Conditioning UCx#14 
Thursday, October 15, 2015, 15:52
Target container previously sintered with TaC in Evap#2 - Target current at 440A, temp measured at 1900C.  A few tests on the temp measured
were done (see Evap#2 elog #251 & 252).  
    Reply  Monday, October 26, 2015, 16:20, Laura Lambert, UC2, 41077-5, LP-SIS, Done, Conditioning UCx#14 


    
        
            John Wong wrote:
        
        
            
            Thursday, October 15, 2015, 15:52
Entry  Monday, September 14, 2015, 15:31, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_09 poor_backing_pump.PNGcurrent_pressure_plot.PNG
 Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic mass = 61.31g
The green was rolled up and wrapped in a piece of graphite sheet.
Entry  Saturday, August 29, 2015, 16:12, Anders Mjos, , , , Problems, Restarting vacuum after power outage 
Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10: Starting turbo
Saturday, August 29, 2015, 16:12: Turbo running. IG1 at 2.4E-4 T
Entry  Wednesday, August 19, 2015, 11:44, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_08 8x
 Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug 11, 2015. The slurry was cast on a piece of glass coated with WD40
on Aug 12, 2015.
Entry  Thursday, July 30, 2015, 17:19, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2_flk_07 IMG_20150714_145857963.jpg
 Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared on July 13, 2015.  See screen shot for more info. 
The material is loaded into a target boat and wrapped with 3 layers of Ta-heat shield. 
    Reply  Tuesday, August 11, 2015, 10:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2_flk_07 


    
        
            John Wong wrote:
        
        
            
             Thursday, July 30, 2015, 17:10
Entry  Tuesday, June 30, 2015, 13:31, Laura Lambert, UC2, 40860-1, LP-IG-LIS, In progress, Conditioning UCx #13 
 Tuesday, June 30, 2015, 13:28
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
    Reply  Thursday, July 02, 2015, 13:01, John Wong, UC2, 40860-1, LP-IG-LIS, In progress, Conditioning UCx #13 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, June 30, 2015, 13:28
       Reply  Friday, July 03, 2015, 13:45, Laura Lambert, UC2, 40860-1, LP-IG-LIS, In progress, Conditioning UCx #13 evap1_trip_off_july_3rd.JPG


    
        
            John Wong wrote:
        
        
            
            
            
          Reply  Wednesday, July 08, 2015, 10:52, John Wong, UC2, 40860-1, LP-IG-LIS, Done, Conditioning UCx #13 Screen_Shot_2015-07-09_at_5.20.37_PM.pngpressure_current_plot.PNG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Monday, May 11, 2015, 11:49, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_06 IMG_20150508_143957199_HDR.jpgstriptool.JPGstriptool-zoom.JPG
 Monday, May 11, 2015, 11:45
UO2/C green was prepared May 6, 2015. The slurry was cast on a piece of glass coated with WD40
on May 7, 2015.
Entry  Tuesday, April 21, 2015, 11:28, Laura Lambert, , , , Maintenance, Ion Gauge replaced March 23rd 2015 
 
Entry  Friday, March 20, 2015, 15:21, Laura Lambert, UC2, 41177-2, LP-SIS, Done, Conditioning UCx #12 
Friday, March 20, 2015, 15:17 
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
Entry  Monday, March 09, 2015, 16:58, Laura Lambert, Empty, , TARGET BOAT, Maintenance, Testing new software 
 Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program, experienced some issues; therefore, switched to same software as EVAP2.
Testing new software.
Entry  Monday, January 26, 2015, 11:28, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_05 flk5.jpgstriptool.JPG
 Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.
The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture]
Entry  Friday, January 23, 2015, 15:02, Laura Lambert, , , , Maintenance, water supply turned back on to EVAP1 and fume hoods 
 Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1 and fume hoods

 
Entry  Thursday, December 11, 2014, 10:17, Laura Lambert, , , , Maintenance, water supply shut off for lab closure over holidays 
 Thursday, December 11, 2014, 10:16
water valve shut off for lab closure over the holidays.

 
Entry  Friday, October 17, 2014, 11:55, Laura Lambert, UC2, 40282-5, LP-SIS, In progress, Conditioning UCx #11 
 Friday, October 17, 2014, 11:47
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
    Reply  Monday, October 20, 2014, 16:22, John Wong, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 power_bump.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Friday, October 17, 2014, 11:47
       Reply  Monday, November 10, 2014, 13:50, Laura Lambert, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, September 23, 2014, 15:00, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_04 
 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014.
    Reply  Friday, October 10, 2014, 14:00, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_04 archiver_TGHT&VAC.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, September 23, 2014, 14:54
Entry  Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03 carbonization.JPG
 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
Entry  Thursday, August 14, 2014, 17:56, John Wong, ThO2, , LP-SIS, Done, Sintering ThO2#1 
 Thursday, August 14, 2014, 17:54
Target container consists of 240 discs of ThO2/Nb discs.  The container is not required to be wrapped with Ta-heat shields.  
One end cap is inserted on the left end (wrt to the ionizer pointing into the page).  