Monday, June 12, 2017, 15:07, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_17
|
Monday, June 12, 2017, 11:41
UO2/C green was prepared June 7th, 2017.
The cast peeled off the glass nicely June 8th, 2017.
Initial UO2 powder used = 50.10g (Inventory R-01032A, UO2 + bottle = 776.36g before use)
Graphite powder used = 10.06g
Green cast dried UO2/C + organic mass = 62.98g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield [reused from last carbonization] and installed in evap1 this morning.
Chamber pumped down.
Target boat will be ramped up to 520A.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 1.58e-5 Torr
Tapped up to 30A, 0.21V
Waited ~1hr45, vacuum stable.
IG1 = 8.59e-6 Torr
Initiating auto-ramp at 0.1A/min
Tuesday, June 13, 2017, 10:32
IG1 = 5.0e-5 Torr
TGHT = 65A, 0.47V
Vacuum currently yo-yo-ing, but stable.
Changing vacuum limits.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Increasing ramping rate to 0.2A/min.
Thursday, June 15, 2017, 16:24
IG1 = 1.96e-4 Torr
TGHT = 520A, 5.18V
TGHT has reached 520A, the vacuum remains at it's limit.
Vacuum usually drops and stabilizes slightly before the max setpoint is reached indicating carbonization process complete.
Since vacuum remains high, this indicates the carbonization remains incomplete.
Conditions have changed such as vacuum limits, which has greatly sped up the process.
This increase in speed could have an impact on the current at which the carbonization occurs.
Increasing max setpoint to 530A and re-initiating auto-ramp.
Friday, June 16, 2017, 08:32
Vacuum stable, started decreasing when TGHT reached 530A - carbonization process complete.
Evap1 has remained at max setpoints for ~11hrs, but has remained at low vacuum for ~5hrs.
IG1 = 5.56e-6 Torr
TGHT = 530A, 5.31V
Initiating auto-cool at 1.0A/min
TP = 24.9C, RT = 24.3C
*note TP now has water cooling as well as fan pointed at it for this entire process
Monday, June 19, 2017, 16:16
Vented in Ar and transferred from evap1 to glove box this a.m
UC2 flakes produced = 48.66g
|
Wednesday, June 07, 2017, 12:48, Aaron Schmidt, , , , , Turbo pump cooling
|
Wednesday, June 07, 2017, 10:00-12:00: Cooling was split/routed from two bottom lines with tees and run to the turbo pump.
|
Tuesday, May 23, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 15:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 6x
|
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:54, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Problems, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Tuesday, May 30, 2017, 07:43, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Tuesday, May 30, 2017, 07:41
Still unsure as to why evap1 tripped off again.
Put evap1 back under vacuum/ turned turbo pump on and opened isolation valve yesterday afternoon.
Vacuum good this morning...nothing tripped off...
Tuesday, May 30, 2017, 08:21
IG1 = 2.3e-6 Torr
Tapped up manually to 40A, 0.24V
Waited ~1hr
IG1 = 4.5e-6 Torr
Initiated auto-ramp at 0.2A/min up to a final setpoint of 250A
Wednesday, May 31, 2017, 09:37
IG1 = 2.4e-6 Torr
TGHT = 250A, 2.57V
Increasing max setpoint to 275A [the trip off point] at a rate of 0.2A/min
Vacuum is currently stable and low; increasing limits to:
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Wednesday, May 31, 2017, 13:39
IG1 = 3.7e-6 Torr
TGHT = 275A, 2.80V
Increasing max setpoint to final setpoint of 520A at a rate of 0.2A/min
Vacuum is currently stable and low; keeping current limits.
Wednesday, May 31, 2017, 15:57
IG1 = 8.14e-6 Torr
TGHT = 300A, 3.08V
Vacuum stable.
Decreasing ramping rate to 0.1A/min for overnight heating.
turbo pump = 40.5C; room temp = 25.1C
Thursday, June 01, 2017, 09:00
IG1 = 4.2e-5 Torr
TGHT = 396A, 4.06V
Vacuum stable.
Increasing ramping rate to 0.2A/min.
turbo pump = 41.6C; room temp = 24.3C
Thursday, June 01, 2017, 13:18
IG1 = 1.25e-4 Torr
TGHT = 439A, 4.48V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 42.3C; room temp = 24.6C
Thursday, June 01, 2017, 15:48
IG1 = 1.95e-4 Torr
TGHT = 467A, 4.81V
Vacuum stable.
Changing vacuum limits and ramping rate for heating overnight.
Decreasing ramping rate to 0.1A/min
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 44.1C; room temp = 25.3C
Friday, June 02, 2017, 07:19
IG1 = 1.26e-4 Torr
TGHT = 473A, 4.77V
Vacuum stable.
Changing vacuum limits and ramping rate.
Increasing ramping rate to 0.2A/min
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Friday, June 02, 2017, 10:18
IG1 = 2.04e-4 Torr
TGHT = 498A, 5.08V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 3.0e-4 Torr, backing off at 5.0e-4 Torr.
Fan has been inserted - pointed at turbo pump, TP temp's have decreased.
tp = 32.1C; rt = 24.7C
Friday, June 02, 2017, 13:22
IG1 = 2.4e-4 Torr
TGHT = 520A, 5.40V
Vacuum stable and decreasing.
Carbonization process almost complete.
Will remain at max setpoints over the weekend.
TP = 28.2C; RT = 24.5C
Monday, June 05, 2017, 08:51
IG1 = 1.75e-6 Torr
TGHT = 520A, 5.29V
Carbonization process complete!
Remained at max setpoints over the weekend.
Initiating auto cool at 1.0A/min
Tuesday, June 06, 2017, 15:56
Vented in Ar and removed today.
Currently in glove box.
Monday, June 12, 2017, 11:44
Flakes produced: 48.00g
|
Wednesday, May 24, 2017, 09:34, Laura Lambert, , , , Maintenance, VACUUM TRIP OFF SETPOINT CHANGED
|
Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point was changed to 8e-4 Torr when previously it was set to 8e-5 Torr.
Vacuum limits were set to stop at 5e-5 Torr and back-off at 6e-5 Torr
Now vacuum limits will be changed by an order of magnitude in an attempt to speed up the processes in the evaporator.
|
Thursday, April 20, 2017, 11:41, Laura Lambert, UC2, 42218-1, LP-IG-LIS, Done, Conditioning UCx#20 6x
|
Thursday, April 20, 2017, 11:31
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
The target consists of 220 discs of UCx with 7.55cm in length [6 packs of 5 + 190 single discs].
Discs in target are arranged as follows: 1pack / 45singles / 1pack / 50singles / 2packs / 50singles / 1pack / 45singles / 1pack
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 490A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog350 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Friday, April 21, 2017, 10:14
IG1 = 2.47e-6 Torr
Tapped up manually to 35A.
Waited ~1.5hrs, vacuum stable IG1 = 2.37e-6 Torr
Initiating auto-ramp.
Thursday, April 27, 2017, 09:19
IG1 = 4.611e-6 Torr
TGHT = 490A, 4.93V
Target has remained at max setpoints for ~9hrs.
Initiating auto-cool at 1.0A/min
Tuesday, May 16, 2017, 13:21
Update:
Target looks good, see photos attached post sintering.
Gold tint on container commonly seen with the Uranium targets.
Orange colouring on inside of container end - also common.
Both endcaps in and handed off to assembly yesterday.
|
Friday, March 03, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_15
|
Friday, March 03, 2017, 08:53
UO2/C green was prepared Feb 28th, 2017.
The cast peeled off the glass nicely March 2nd, 2017 and loaded into evap1.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.08g (Inventory R-01032A, UO2 + bottle = 977.24g before use)
Graphite powder used = 10.05g
Green cast dried UO2/C + organic mass = 63.21g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber pumped down overnight.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 3.2e-6 Torr
Tapped up to 35A, 0.40V
Waited ~5hrs, vacuum stable.
IG1 = 6.8e-6 Torr
Initiating auto-ramp
Monday, March 06, 2017, 08:47
Evap1 tripped off fri night.
See attached screenshot of strip tool.
Had continued to ramp up and was at ~340A, but since the power supply had tripped off this was not actually being applied.
TGHT set back to zero, auto-ramp turned off.
Will investigate further before re-starting...
Tuesday, March 07, 2017, 09:50
Have not figured out reasoning behind power trip.
According to controls, there were no power bumps at that time.
Water was still on - had not tripped off.
Tapped back up manually to 40A yesterday morning.
Remained at 40A overnight.
IG1 = 4.46e-6 Torr this morning.
TGHT = 40A, 0.38V
Re-initiated auto-ramp.
Monday, March 13, 2017, 15:46 by AM
IG1 = 5.2E-5 Torr
TGHT= 436A 4.28V
Thursday, March 16, 2017, 08:37 by AM
TGHT reached 520A @ 5.37V this morning. Vacuum at 6.2E-6 Torr
Friday, March 17, 2017, 08:21 by AM
520A @ 5.37V this morning. Vacuum at 2.2E-6 Torr
Ramping down
Thursday, April 20, 2017, 11:44
John removed this while I was away - forgot to mark as done
|
Thursday, February 16, 2017, 15:09, Laura Lambert, UC2, 42218-12, LP-SIS, Done, Conditioning UCx#19
|
Thursday, February 16, 2017, 15:04
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
The target consists of 200 discs of UCx with 7.3cm in length [6 packs of 5 + 170 single discs].
Discs in target are arranged as follows: 5singles / 1pack / 40singles / 1pack / 40singles / 2packs / 40singles / 1pack / 40singles / 1pack / 5singles
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 475A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog340 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
NOTE: small bug in evap1 IOC. when current is tapped up 1A, it auto-taps back down 0.01A. should be OK, but will keep an eye on evaporator during conditioning process and acct for changes.
Friday, February 17, 2017, 09:56
IG1 = 1.56e-6 Torr
Tapped up manually to 35A
Vacuum stable.
IG1 = 1.56e-6 Torr.
Initiating auto-ramp.
Friday, February 24, 2017, 15:09
Local TGHT 473 A 4.63 V
Monday, February 27, 2017, 09:06
Target has remained at max setpoints for 20+hrs [epics problems and archives currently not working so unable to find out exact time]
TGHT = 475A, 4.67V
IG1 = 1.48e-6 Torr
Conditioning process is now complete.
Initiating auto-cool at 1.0A/min
Tuesday, February 28, 2017, 12:00
UCx conditioning process complete.
Vented in Ar and transferred to glove box this morning.
Tuesday, April 11, 2017, 09:44
A few photos taken of the target post-conditioning.
Note a few flakes came out from one end - end disc from 'open' side flaked off.
|
Tuesday, December 20, 2016, 15:03, Laura Lambert, , , , Maintenance, RETURN and SUPPLY valves CLOSED for xmas break
|
|
Tuesday, November 29, 2016, 16:20, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_14
|
Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov 23rd, 2016.
The cast peeled off the glass nicely Nov 24th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.61g (Inventory R-01032A, UO2 + bottle = 1028.05g before use)
Graphite powder used = 10.16g
Green cast dried UO2/C + organic mass = 61.94g
The green was rolled up and wrapped in a piece of graphite sheet.
A new Ta target boat is being used due to the previous one being old and is now very expanded.
The last round of flakes being carbonized [UC2flk_13] showed a slight change in current and power from previous carbonization process', also indicating the target boat should be retired.
The new boat has only been used once in evap1 to sinter some endcaps earlier in the year.
This target boat is slightly different than the old one because both ends are open, no endcaps are attached to the boat.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down...
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, November 30, 2016, 13:09
IG1 = 3.2e-6 Torr
Tapped up to 35A, 0.34V
Waited ~2hrs, vacuum stable.
IG1 = 8.7e-6 Torr
Initiating auto-ramp
Monday, December 12, 2016, 09:15
Vacuum stable - carbonization process complete.
Evap1 remained at max setpoints over wknd
IG1 = 1.47e-6 Torr
TGHT = 520A, 5.12V
Initiating auto-cool at 1.0A/min
Tuesday, December 13, 2016, 16:30
Vented in Ar and opened up evap1 today.
As previously mentioned this new target boat has no endcaps and one can see in the photo more materials have dispersed onto the sides of evap1
These materials appear to be mostly graphite since there are no visible holes through the graphite wrapping that surrounds the UC2 flakes.
Stored in glove box.
|
Monday, November 07, 2016, 13:34, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13
|
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last batch]
The cast peeled off the glass nicely Nov 4th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.16g (Inventory R-01032A, UO2 + bottle = 1078.15g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 60.91g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, IG1 = 2.4e-5 Torr.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, November 08, 2016, 07:43
IG1 = 2.4e-6 Torr
Tapped up to 35A, 0.50V
Waited ~50min, vacuum stable.
IG1 = 1.3e-5 Torr
Initiating auto-ramp
|
Tuesday, November 15, 2016, 10:02, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13
|
Laura Lambert wrote: |
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last batch]
The cast peeled off the glass nicely Nov 4th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.16g (Inventory R-01032A, UO2 + bottle = 1078.15g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 61.91g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, IG1 = 2.4e-5 Torr.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, November 08, 2016, 07:43
IG1 = 2.4e-6 Torr
Tapped up to 35A, 0.50V
Waited ~50min, vacuum stable.
IG1 = 1.3e-5 Torr
Initiating auto-ramp
|
Tuesday, November 15, 2016, 09:59
TGHT reached to 520A/5.12V; however the pressure was still remained high at the limit 5.0e-5 Torr which indicating that the carbonization process isn't complete yet.
Increase TGHT to 520A at a ramping rate of 0.1A/min.
|
Wednesday, November 16, 2016, 16:41, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_13
|
John Wong wrote: |
Laura Lambert wrote: |
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last batch]
The cast peeled off the glass nicely Nov 4th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.16g (Inventory R-01032A, UO2 + bottle = 1078.15g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 61.91g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, IG1 = 2.4e-5 Torr.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, November 08, 2016, 07:43
IG1 = 2.4e-6 Torr
Tapped up to 35A, 0.50V
Waited ~50min, vacuum stable.
IG1 = 1.3e-5 Torr
Initiating auto-ramp
|
Tuesday, November 15, 2016, 09:59
TGHT reached to 520A/5.12V; however the pressure was still remained high at the limit 5.0e-5 Torr which indicating that the carbonization process isn't complete yet.
Increase TGHT to 520A at a ramping rate of 0.1A/min.
|
Wednesday, November 16, 2016, 11:55
*John increased maxTGHT setpoint to 530A not 520A
When the TGHT reached 520A, the vacuum was still at it's limit. Usually the vacuum starts to drop and stabilize slightly before the max setpoint is reached.
In the photo from UCx_flk10 at ~490A, the vacuum started to drop indicating the carbonization process was complete.
In the image posted from the current carbonization process one can see the vacuum was still at its limit when the TGHT reached its max set point of 520A meaning the carbonization process remains incomplete.
Thursday, November 17, 2016, 07:36
Vacuum still high, carbonization remains incomplete.
Remained at 530A for ~18hrs
TGHT = 530A, 5.24V
IG1 = 3.8e-5 Torr
Increasing max setpoint to 540A.
Thursday, November 17, 2016, 13:54
Vacuum remains high after ramping up to 540A, IG1 = 4.5e-5 Torr - still not fully carbonized
TGHT = 540A, 5.36V
Increasing max setpoint to 550A
Thursday, November 17, 2016, 15:29
Vacuum still high
Increasing max setpoint to 580A
See excel to confirm this remains under 4kW
Wouldn't want to go much above 4kW otherwise container will break
Friday, November 18, 2016, 13:14
Vacuum stable and decreasing - carbonization process complete.
Evap1 has remained at max setpoints for ~6.5hrs
IG1 = 5.6e-6 Torr
TGHT = 580A, 5.69V
Initiating auto-cool at 1.0A/min
Monday, November 21, 2016, 16:20
Vented in Ar and opened up evap1 today.
Stored in glove box.
UC2 flakes produced = 47.23g
|
Wednesday, October 19, 2016, 16:52, Laura Lambert, UC2, 41790-6, LP-SIS, Done, Conditioning UCx#18
|
Wednesday, October 19, 2016, 16:47
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block using one single foil/ layer
The target consists of 165 discs of UCx with 5.4cm in length
Materials: 4 packs of 5 {all made with 'modified' UC2cast} + 145 single discs{20 from 'modified cast'}
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 430A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog327 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Thursday, October 20, 2016, 10:11
Tapped up manually to 40A
Vacuum stable.
IG1 = 4.45e-6 Torr.
Initiating auto-ramp.
Monday, October 24, 2016, 11:19
TGHT = 254A, 2.46V
Still ramping up...~half way to final setpoint
Vacuum dropped, looks good, IG1 = 6.77e-6 Torr
Wednesday, October 26, 2016, 09:38
Target has remained at max setpoints for ~16hrs.
TGHT = 430A, 4.25V
IG1 = 2.3e-6 Torr
Conditioning/ re-carbonization process is now complete.
Initiating auto-cool at 1.0A/min
Thursday, October 27, 2016, 15:35
UCx done.
Vented in Ar and transferred to glove box.
Looked inside before inserting 2nd endcap - clean view all the way through the materials to the endcap/ no visible shifting.
Ta coated spring helped hold materials in place, materials expanded minimally ~0.5cm
Pushed materials back to desired length.
Successfully removed a single disc for further analysis.
Second endcap now in with 2x graphite foils.
Both endcaps need expanding.
Ready for assembly.
Requires Rh foil - to be inserted during assembly.
|
Friday, September 23, 2016, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_12
|
Friday, September 23, 2016, 16:01
*Note: materials were scaled back small amount since only 48.5g of UO2 was left in bottle when usually 50g required to make slurry
UO2/C green was prepared September 22, 2016.
The cast peeled off the glass nicely September 23, 2016 and loaded into evap1.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 48.52g (Inventory R-00835A, no more UO2 left in bottle! Empty bottle = 68.33g)
Graphite powder used = 9.78g
Green cast dried UO2/C + organic mass = 59.21g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, will remain under vacuum over weekend and initiate ramping process monday.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Monday, September 26, 2016, 13:52
IG1 = 1.56e-6 Torr
Tapped up to 35A
Waited ~1.5hrs, vacuum stable.
IG1 = 1.23e-5 Torr
Initiating auto-ramp
Friday, October 07, 2016, 13:19
TGHT tripped off oct 5th at 7pm alarm handlers were not on, so pager never went off
TGHT was at ~450A and vacuum stable when it tripped off
Reason for this is currently unknown
Ion gauge didn't trip off, neither did the water
Auto-ramping at 2.0A/min back up to 400A currently...
Friday, October 07, 2016, 16:30
TGHT was ramped up to 420A at 2.0A/min today
IG1 = 4.9e-5 Torr
Changed ramping rate to 0.1A/min for the TGHT with a final setpoint of 520A
Alarm handlers on: if anything happens over weekend pager will go off
Tuesday, October 11, 2016, 10:30
IG1 = 1.2e-6 Torr
TGHT = 520A, 5.35V
TGHT has remained at max setpoint for ~2.5days
Carbonization process is complete.
Initiating auto-cool at 2.0A/min.
Wednesday, October 12, 2016, 16:23
Vented in Ar and opened up evap1 this morning.
Stored in glove box.
Flakes look good, ~45g produced.
|
Monday, September 12, 2016, 17:41, John Wong, , , TARGET BOAT, In progress, RUSH. Sintering end-caps
|
Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long Ta-wire in spring sharp were coated with TaC coating and wrapped in a small sheet of graphite foil.
Container is then wrapped with a sheet of Ta heat shield.
These caps and wires will be sintered in Evap 1, so they may be prompted to contamination from the uranium processes.
I have no choice but to use Evap1 to do this work since we are falling behind with the schedule.
In the future, please have all the materials (targets, end caps, binder, etc) well prepared.
I do not know what is the required current to sinter the caps since there is no temp measurement. So, the best is to go with how the container was sintered, 580A.
Monday, September 12, 2016, 17:36
Chamber has been pumped down to mid 10-6 Torr.
Auto ramp to 580A at 2A/min.
|
Tuesday, September 20, 2016, 10:49, Laura Lambert, , , TARGET BOAT, Done, RUSH. Sintering end-caps
|
John Wong wrote: |
Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long Ta-wire in spring sharp were coated with TaC coating and wrapped in a small sheet of graphite foil.
Container is then wrapped with a sheet of Ta heat shield.
These caps and wires will be sintered in Evap 1, so they may be prompted to contamination from the uranium processes.
I have no choice but to use Evap1 to do this work since we are falling behind with the schedule.
In the future, please have all the materials (targets, end caps, binder, etc) well prepared.
I do not know what is the required current to sinter the caps since there is no temp measurement. So, the best is to go with how the container was sintered, 580A.
Monday, September 12, 2016, 17:36
Chamber has been pumped down to mid 10-6 Torr.
Auto ramp to 580A at 2A/min.
|
Tuesday, September 20, 2016, 10:41
vented in air and removed from evap1
managed to remove carefully using napkins and not touching boat directly with gloves as to avoid contamination.
endcaps and springs look good, fully sintered
one endcap looks like coating has started to peel off, possibly due to too thick of a TaC coating pre-sintering. see photos attached.
|
Tuesday, August 23, 2016, 17:35, John Wong, , , TARGET BOAT, , Sintering TaC coated target boat
|
Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed) and wrapped with Ta-heat shield.
chamber is currently being pumped down. Vac currently at 3.3e-5Torr.
TGHT to be ramped up to 580A.
Initiate autoramping at 0.1A/min
Wednesday, August 24, 2016, 10:34
TGHT at 111A/1.07V. Vac at 7.5e-6 Torr and coming down.
Increase ramping rate to 2A/min.
Thursday, August 25, 2016, 12:01
TGHT has been stabilized at 580A/6.89V for over 24 hours. Vac at 7.5e-6 Torr.
Initiated cooling at 2A/min.
Monday, September 12, 2016, 17:30
Container was properly sintered.
|
Monday, July 11, 2016, 16:00, Laura Lambert, UC2, 41790-3, LP-SIS, Done, Conditioning UCx#17
|
Monday, July 11, 2016, 15:54
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2
The target consists of 216 discs of UCx with 7.6cm in length [4 packs of 5 + 196 single discs].
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 410A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog308 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Tuesday, July 12, 2016, 08:50
IG1 = 5.3e-6 Torr
Tapped up manually to 35A
Vacuum stable.
IG1 = 5.25e-6 Torr.
Initiating auto-ramp.
Friday, July 15, 2016, 16:59
With evap2 not working, water was turned off to check valves...this tripped off evap1 since this also turned off the water to evap1.
TGHT was ~115A when evap1 tripped off.
Vacuum stable = 2.9e-6 Torr.
Tapped back up manually to 115A, 1.08V
Vacuum stable = 2.8e-6 Torr.
Restarting auto ramp at 0.1A/min.
Friday, July 22, 2016, 16:25
Target has remained at max setpoints for 4.5days.
TGHT = 410A, 3.99V
IG1 = 2.5e-6 Torr
Voltage has wavered a small amount, between 3,91V-4.02V; this can be seen in the photo attached of the screenshot of the striptool.
Conditioning process is now complete.
Initiating auto-cool at 1.0A/min
Tuesday, July 26, 2016, 16:48
Vented in Ar and currently transfering into glove box
will update elog tomorrow...
Wednesday, July 27, 2016, 14:56
had a few problems with the transfer chamber in the glove box, but managed to get the target into the glove box okay last night.
was exposed to oxygen for minimal amount of time - transfer chamber wasnt flushing properly/ leak in james bond box
|
Wednesday, May 18, 2016, 15:15, Laura Lambert, UC2, 40860-2, LP-IG-LIS, Done, Conditioning UCx#16
|
Wednesday, May 18, 2016, 15:05
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2
The target consists of 200 discs of UCx with 7.4cm in length [4 packs of 5 + 180 single discs].
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 460A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog291 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Thursday, May 19, 2016, 09:25
IG1 = 3.4e-6 Torr
Tapped up manually to 35A
Vacuum stable.
IG1 = 3.5e-6 Torr.
Initiating auto-ramp.
Wednesday, May 25, 2016, 13:05
Target has been heated at 460A, 4.5V for 5 hrs.
Vacuum at 6.4e-6 Torr.
Initiated cool down at 1A/min.
Friday, May 27, 2016, 11:14
UCx done.
Vented in Ar and put in glove box yesterday.
Looked inside before inserting 2nd endcap - clean view all the way through the materials to the endcap/ not much visible shifting.
Ta coated spring helped hold materials in place.
Slightly darker markings on legs of container on side that was open in evap1.
2nd endcap put in.
Ready for assembly.
|
Monday, May 16, 2016, 15:52, Laura Lambert, , , , , Full clean of EVAP1
|
Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.
|
Tuesday, April 19, 2016, 10:48, Laura Lambert, UC2, ***, , Done, ***ALL FUTURE UCx TARGETS***
|
Tuesday, April 19, 2016, 09:47
Temperature measurements have been taken in evap2 on target containers.
Previously all UCx targets have been conditioned in evap1 at 520A. The respective target containers TaC coating was sintered in evap2 at a different current.
All future UCx targets will now be conditioned in evap1 at the same current required to reach 1900C in evap2 when sintering the TaC coating on the container to be used for the respective target.
ie. If a container is being sintered in evap2 at 450A [1900C], this same container is used for UCx - then that specific UCx target will be conditioned in evap1 at 450A.
Confirm full carbonization has been achieved by following with the vacuum on the strip tool and make sure the final vacuum comes down at the end of the whole process.
|
Tuesday, April 05, 2016, 11:12, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_11
|
Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March 31, 2016.
The cast peeled off the glass nicely April 1, 2016 and finished drying over the weekend. [see attached picture]
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.47g (Inventory R-00835A, UO2 + bottle = 168.33g before use)
Graphite powder used = 10.05g
Green cast dried UO2/C + organic mass = 59.50g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 yesterday.
Chamber has been pumped down overnight, currently at IG1 = 3.7e-6 Torr.
Manually stepping up to 35A...
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, April 05, 2016, 15:04
Waited ~4hrs, vacuum stable.
IG1 = 8.5e-6 Torr.
Initiating auto-ramp.
Friday, April 15, 2016, 13:50
IG1 = 3.2e-6 Torr
TGHT = 520A, 5.15V
TGHT remained at max setpoints for ~10hrs
Carbonization process is complete.
Initiating auto-cool at 2.0A/min.
Monday, April 18, 2016, 11:08
vented in argon and removed from evap1.
stored in glove box.
will measure flakes produced tomorrow...
Tuesday, April 19, 2016, 15:32
UC2 flakes produced = 45.99g
|
Tuesday, March 08, 2016, 11:19, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_10
|
Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March 2, 2016.
This was the first time using the new rack built for holding multiple casts [see photo attached]
The cast peeled off the glass nicely March 3, 2014 and finished drying over the weekend. [see attached picture]
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.03g (Inventory R-00835A, UO2 + bottle = 218.54g before use)
Graphite powder used = 10.14g
Green cast dried UO2/C + organic mass = 60.08g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber has been pumped down overnight, currently at IG1 = 4.5e-6 Torr.
Manually stepping up to 35A...
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, March 08, 2016, 16:01
Waited ~3hrs, vacuum stable.
IG1 = 1.4e-5 Torr.
Initiating auto-ramp.
Monday, March 21, 2016, 08:33
IG1 = 1.9e-6 Torr
TGHT = 520A, 5.13V
TGHT remained at max setpoints for ~63.5hrs [over the weekend].
Carbonization process is complete.
Initiating auto-cool at 2.0A/min.
Thursday, March 24, 2016, 10:19
vented in argon and removed from evap1.
stored in glove box.
total flakes produced: 46.26g
|
|