  166   Wednesday, September 20, 2017, 08:07 Aaron Schmidt   MaintenanceIon gauge & RP statusWednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old
  
  170   Tuesday, November 07, 2017, 11:57 Laura Lambert   MaintenanceInterlocks limits changed to 100mTorr Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray
  
  171   Tuesday, November 07, 2017, 12:04 Laura Lambert   MaintenanceNoise levels checked - ear protection not required. Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry.
  
  174   Wednesday, November 22, 2017, 14:20 Laura Lambert   MaintenanceNew eye wash for hot lab! Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout.
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  250   Tuesday, November 05, 2019, 14:50 Aaron Schmidt   MaintenanceFallen Bolt. One of the TBHT bolts  fell out of reach   
  57   Friday, August 24, 2012, 16:44 John WongUC239165-5LP-SISIn progressConditioning UCx#5Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012),
  
  58   Monday, September 03, 2012, 02:56 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated.
  
  59   Tuesday, September 04, 2012, 17:26 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Organic gunk cleaned out. Beginning 2nd phase
of conditioning.
  
  60   Friday, September 07, 2012, 17:21 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated.
  
  61   Monday, September 10, 2012, 11:00 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Plot of conditioning run: IEVAP:IG1, TGHT  UC2_05_conditioning.png 
  62   Thursday, October 25, 2012, 15:03 John WongBeOTa-target boat (old) In progressSintering BeO pellets #5 - testing Re foil as the protective under layerThursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2.
 BeO_pellets_on_Re_foil.PNGTGHT_0-400A.PNGBeO_pellet#5_TGHT_100-600A.PNGBeO_pellet#5_@_600A__11hrs.PNG 
  73   Friday, August 02, 2013, 11:06 Laura LambertUC238634-7LP-SISIn progressConditioning UCx # 07Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2.
  
  78   Thursday, September 19, 2013, 15:41 Laura LambertUO2/CTarget Boat #2 In progressProcessing UC2 flakes (batch #07 - 09192013)Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass
  
  85   Thursday, January 23, 2014, 16:29 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coatingThursday, January 23, 2014, 16:26 
 A new target boat was sprayed
with TaC coating and let dry, the coating
 IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg 
  86   Friday, January 24, 2014, 14:45 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  89   Tuesday, March 04, 2014, 15:48 John Wong  TARGET BOATIn progressRe-sinterring end capsTuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were
  
  90   Wednesday, March 05, 2014, 10:30 Laura Lambert  TARGET BOATIn progressRe-sinterring end caps

    

       
            
  
  94   Wednesday, May 21, 2014, 11:41 John WongUC2 TARGET BOATIn progressTests: Sintering carbon Mesh coated with UC2Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2.  The sample
 Vac_Cur_plot.PNG 
  100   Tuesday, September 23, 2014, 15:00 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_04 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18,
2014. The slurry was cast on a piece of glass
  