  229   Wednesday, October 31, 2018, 10:30 Marla CervantesUC243044-7 LP-SISProblemsUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 current-trip_off.JPGepics.JPG 
  231   Thursday, November 22, 2018, 17:32 Marla CervantesUO2/C40202-1TARGET BOATProblemsUCx Fully loaded graphite insert - UCx26 Thursday, November 22, 2018, 17:25
D-shaped discs were cut from
 Nov23-CurrenTrip1.jpgNov23-CurrenTrip2.jpg 
  249   Thursday, October 31, 2019, 13:59 Marla CervantesUO2/C TARGET BOATProblemsUCx#30 Carbothermal Reduction

    

       
            
  
  255   Thursday, January 30, 2020, 10:15 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
  
  257   Thursday, January 30, 2020, 13:11 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 voltage-rising.JPG 
  261   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  260   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  263   Thursday, August 13, 2020, 14:37 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 200815-Vacuum_P2N.PNG 
  21   Tuesday, May 17, 2011, 16:43 John Wong   MaintenanceEvaporator Ion gauge replaced The evaporator ion gauge filament burnt
out on May 11, 2011.  A target was in
the evaporator at that time and was about
  
  33   Wednesday, September 07, 2011, 13:33 John WongEmpty  MaintenanceChanged Evaporator#1 Backing Pump oil Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing
  
  35   Wednesday, September 07, 2011, 15:40 Anders MjosEmpty  MaintenanceRe-sealing of Glove Box2011-09-01:

    Glove box was leaking
(air/argon) between base and box. Light was
  
  52   Tuesday, June 12, 2012, 14:43 John Wong   MaintenanceChanging backing pump oil Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). 
  
  82   Friday, November 01, 2013, 13:08 Anders Mjos   MaintenanceGloves, window and window gasket replaced.Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG).
  
  105   Thursday, December 11, 2014, 10:17 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays.
  
  106   Friday, January 23, 2015, 15:02 Laura Lambert   Maintenancewater supply turned back on to EVAP1 and fume hoods Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods
  
  108   Monday, March 09, 2015, 16:58 Laura LambertEmpty TARGET BOATMaintenanceTesting new software Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched
  
  110   Tuesday, April 21, 2015, 11:28 Laura Lambert   MaintenanceIon Gauge replaced March 23rd 2015    
  143   Tuesday, December 20, 2016, 15:03 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas break    
  148   Wednesday, May 24, 2017, 09:34 Laura Lambert   MaintenanceVACUUM TRIP OFF SETPOINT CHANGED Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously
  
  165   Thursday, September 07, 2017, 14:26 Aaron Schmidt   Maintenanceroughing pump oil replaced Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected
  