  153   Wednesday, June 07, 2017, 12:48 Aaron Schmidt    Turbo pump cooling Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump.
  
  94   Wednesday, May 21, 2014, 11:41 John WongUC2 TARGET BOATIn progressTests: Sintering carbon Mesh coated with UC2Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2.  The sample
 Vac_Cur_plot.PNG 
  48   Monday, May 14, 2012, 15:22 John Wong Target boat  Testing the new graphite foil from CeramaterialMonday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets
 parameter.JPGTGHT_0-820A.GIFgraphite_test_target_boat.pdfGraphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf 
  108   Monday, March 09, 2015, 16:58 Laura LambertEmpty TARGET BOATMaintenanceTesting new software Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched
  
  194   Wednesday, February 28, 2018, 15:21 Laura LambertEmpty TARGET BOATDoneTesting TGHT to induce trip Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1
have tripped off the TGHT in epics within
  
  167   Thursday, September 21, 2017, 11:35 Laura LambertEmpty  DoneTesting TBHT [1st run!], RP [new oil] and IG [new gauge] Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied.
  
  96   Friday, July 04, 2014, 10:23 John WongThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. 
Each sample consists of 5pack ThO2/Nb. 
 2014-07-03_12.29.29.jpgThO_raw_green_sintered_30um.pngpressure_current_plot.PNG 
  97   Wednesday, July 09, 2014, 13:57 Laura LambertThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils

    

       
            
 test_batch_full_sintering.JPGjul9_2014_(2).jpg 
  34   Wednesday, September 07, 2011, 13:41 John WongTaC38634-6LP-SISDoneTaC#1: Sintering and Organics burn-off Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125
 TaC#1.jpgendcaps_after_sintering.pngTaC_aftersintering.jpg 
  236   Friday, April 05, 2019, 10:08 Marla Cervantes 43630-3 DoneTaC coating/sintering for graphite insert test Friday, April 05, 2019, 10:04
A tantalum tube was coated
 EVAP1-TaC_Coating.JPG 
  290   Wednesday, October 11, 2023, 10:06 Darwin Ortiz RosalesUO2/C LP TUBEDoneTUCx-231005 reduction & conditioningWednesday, October 11, 2023, 9:36
Cartridge #10 loaded with 213 plus
3 analysi discs
  
  83   Monday, December 02, 2013, 16:09 Anders Mjos   Problems resolvedTGHT connector repositioned and tightenedThe right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance
 Evap1_rotated_TGHT_conductor_2013-12-02.pdf 
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
  16   Monday, April 18, 2011, 18:14 John WongEmpty38295-8HP-FEBIADProblemsSintering target oven coated with TaCMon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb
 pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg 
  17   Wednesday, April 20, 2011, 16:42 John WongEmpty38481-8HP-FEBIADDoneSintering target oven coated with TaCWed Apr 20 16:39:46 2011:  Target
oven was coated with TaC early today. 
The target was allowed to dry and then wrapped
 overall_process.jpg 
  30   Tuesday, August 30, 2011, 09:31 Anders MjosEmptyTarget BoatLP-SISDoneSintering of End CapsTuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping
  
  31   Tuesday, August 30, 2011, 16:30 John WongEmptyTarget BoatLP-SISDoneSintering of End Caps


   
        
            
  
  98   Thursday, August 14, 2014, 17:56 John WongThO2 LP-SISDoneSintering ThO2#1 Thursday, August 14, 2014, 17:54
Target container consists of 240
discs of ThO2/Nb discs.  The container
  
  29   Monday, August 29, 2011, 11:21 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1 Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night.  The target oven is in the evaporator
 TaC_target_oven.JPG 
  32   Tuesday, September 06, 2011, 17:05 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1


   
        
            
 striptool.JPG 