    Reply  Monday, January 22, 2018, 16:20, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems resolved, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 180122-1e-1.jpg

Marla Cervantes wrote:

Marla Cervantes wrote:

 Friday, January 19, 2018, 12:29

Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]

A 14mm punch was used to punch out circles from the cast.

35 circles were packed into a graphite sample container.

35 x UO2/C circles = 5.69 g

Graphite container = 6.84 g

Graphite container is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.

Chamber currently pumping down.


 

 Monday, January 22, 2018, 9:00

A power outage on Sunday tripped off EVAP1.

 Monday, January 22, 2018, 10:00

Chamber pumping down.

Water flow turned on.


Monday, January 22, 2018, 13:30

IGP1 = 8e-6 Torr

Tapped up entire process manually to 520A in 45 min

TGHT = 520 A, 6.08 V 

Vacuum coming down indicating carbonization process complete

Will remain at max setpoint overnight.


 

    Reply  Tuesday, January 23, 2018, 12:49, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 Carbonization-Batch6-220118.docx

Marla Cervantes wrote:

Marla Cervantes wrote:

Marla Cervantes wrote:

 Friday, January 19, 2018, 12:29

Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]

A 14mm punch was used to punch out circles from the cast.

35 circles were packed into a graphite sample container.

35 x UO2/C circles = 5.69 g

Graphite container = 6.84 g

Graphite container is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.

Chamber currently pumping down.


 

 Monday, January 22, 2018, 9:00

A power outage on Sunday tripped off EVAP1.

 Monday, January 22, 2018, 10:00

Chamber pumping down.

Water flow turned on.


Monday, January 22, 2018, 13:30

IGP1 = 8e-6 Torr

Tapped up entire process manually to 520A in 45 min

TGHT = 520 A, 6.08 V 

Vacuum coming down indicating carbonization process complete

Will remain at max setpoint overnight.


 

 Tuesday, January 23, 2018, 9:30

Initiating auto-cool at 2 A/min


 Tuesday, January 23, 2018, 16:00

 EVAP1 was not vented, Ar tank has low level, Ar tank will be replaced.


Wednesday, January 24, 2018, 11:37

 EVAP1 was vented very carefully using the Ar remaining in the Ar tank.

Ar tank remaining gas: ~8 psi.


Wednesday, January 24, 2018, 15:42 

UCx was transferred to glove box.

Final mass 4.501 g

Entry  Monday, January 29, 2018, 09:28, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 

 Monday, January 29, 2018, 09:26

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.94 g

Graphite container = 5.03 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 

    Reply  Monday, January 29, 2018, 11:07, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 

Marla Cervantes wrote:

 Monday, January 29, 2018, 09:26

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.94 g

Graphite container = 5.03 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 

 Monday, January 29, 2018, 11:06

A power outage around 10 am tripped off EVAP1.

    Reply  Monday, January 29, 2018, 14:25, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems resolved, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 

Marla Cervantes wrote:

Marla Cervantes wrote:

 Monday, January 29, 2018, 09:26

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.94 g

Graphite container = 5.03 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 

 Monday, January 29, 2018, 11:06

A power outage around 10 am tripped off EVAP1.

 Monday, January 29, 2018, 14:22

Water flow turned on.

Chamber set to pumping down. 


 

    Reply  Tuesday, January 30, 2018, 16:07, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 Carbonization-Batch7-300118.docx

Marla Cervantes wrote:

Marla Cervantes wrote:

Marla Cervantes wrote:

 Monday, January 29, 2018, 09:26

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.94 g

Graphite container = 5.03 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 

 Monday, January 29, 2018, 11:06

A power outage around 10 am tripped off EVAP1.

 Monday, January 29, 2018, 14:22

Water flow turned on.

Chamber set to pumping down. 


 

 Tuesday, January 30, 2018, 16:06

Initial IGP1 = 9.4x10e-7 Torr

Tapped up entire process manually to 520A in 32 min

TGHT = 520 A, 5.45 V

Vacuum coming down indicating carbonization process complete 

Will remain at max setpoint for 4 hrs to ensure full carbonization before cooling down.


 Tuesday, January 30, 2018, 18:40

 Initiating auto-cool at 2.0 A/min 


 Wednesday, January 31, 2018, 14:00

Ar tank was changed.


Thursday, February 01, 2018, 12:58 

EVAP1 was vented with Argon and UCx was removed form evaporator 1.

 

Entry  Thursday, February 01, 2018, 13:15, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#8 Carbonization-Batch8-020218.docx

 Thursday, February 01, 2018, 12:59

35 circles of 14 mm diameter were packed into a graphite sample container.

28 discs corresponded to cats#1 and 7 discs to cast#2

35 x UO2/C circles = 3.42 g

Graphite container = 6.96 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Friday, February 02, 2018, 13:18

Initial IGP1 = 4.82x10e-7 Torr

Tapped up entire process manually to 520A in 30 min

TGHT = 520 A, 5.63 V

Vacuum coming down nicely indicating carbonization process complete 

Will remain at max setpoint for 4 hrs to ensure full carbonization before cooling down.


 Friday, February 02, 2018, 16:57

Initiating auto-cool at 2.0 A/min 


Monday, February 05, 2018, 17:23 

Vented with Argon and removed form evaporator 1

Entry  Monday, February 05, 2018, 17:26, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#9 Carbonization-Batch9-060218.docx

Monday, February 05, 2018, 17:24

35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.59 g

Graphite container = 5.3 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Tuesday, February 06, 2018, 10:59

Initial IGP1 = 4.79e-7 Torr

Tapped up entire process manually to 520A in 30 min

TGHT = 520 A, 5.32 V

Vacuum coming down indicating carbonization process complete.  

Will remain at max setpoint for 4 hrs to ensure full carbonization before cooling down.


 Tuesday, February 06, 2018, 14:44

Initiating auto-cool at 2.0 A/min 


 Thursday, February 08, 2018, 10:43

Vented with Ar and removed from EVAP1


 

Entry  Thursday, February 08, 2018, 14:51, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 

 Thursday, February 08, 2018, 14:50

35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.76 g

Graphite container = 5.3 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Friday, February 09, 2018, 10:40

Initial IGP1 = 4.54e-7 Torr

Tapped up entire process manually to 520A in 25 min

TGHT = 520 A, 5.49 V

Vacuum coming down indicating carbonization process complete.  

Current suddenly tripped off from 520 A to 0 A.

There was not a power outage.

There was good vacuum.

Water cooling did not trip off 


 

    Reply  Friday, February 09, 2018, 16:57, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Problems resolved, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 

Marla Cervantes wrote:

 Thursday, February 08, 2018, 14:50

35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.76 g

Graphite container = 5.3 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Friday, February 09, 2018, 10:40

Initial IGP1 = 4.54e-7 Torr

Tapped up entire process manually to 520A in 25 min

TGHT = 520 A, 5.49 V

Vacuum coming down indicating carbonization process complete.  

Current suddenly tripped off from 520 A to 0 A.

There was not a power outage.

There was good vacuum.

Water cooling did not trip off 


 

 Friday, February 09, 2018, 16:49

The power supply was tested and its working normally.

Apparently a glitch on EPICS caused the tripped off.


 

    Reply  Friday, February 09, 2018, 17:04, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 20180209_153539.jpg20180209_153728.jpg20180209_153817.jpgCarbonization-current_trippoff.JPGCarbonization-Batch10-090218.docx

Marla Cervantes wrote:

Marla Cervantes wrote:

 Thursday, February 08, 2018, 14:50

35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 4.76 g

Graphite container = 5.3 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Friday, February 09, 2018, 10:40

Initial IGP1 = 4.54e-7 Torr

Tapped up entire process manually to 520A in 25 min

TGHT = 520 A, 5.49 V

Vacuum coming down indicating carbonization process complete.  

Current suddenly tripped off from 520 A to 0 A.

There was not a power outage.

There was good vacuum.

Water cooling did not trip off 


 

 Friday, February 09, 2018, 16:49

The power supply was tested and its working normally.

Apparently a glitch on EPICS caused the tripped off.


 

 Friday, February 09, 2018, 17:00

Target remained in EVAP1 for 2 hours at 0 A to ensure cooling.

EVAP1 was vented with Ar and the target was removed from EVAP1.

Graphite container seems unbroken.

Ta boat looks unbroken.

Entry  Tuesday, February 13, 2018, 11:44, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 Carbonization-current_trippoff2.JPGTa-Boat.jpgC-Container.jpg

 Tuesday, February 13, 2018, 11:39

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 5.74 g

Graphite container = 5.20 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 used Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Tuesday, February 13, 2018, 15:30

Initial IGP1 = 2.73x10e-6 Torr

Tapped up entire process manually to 520 A in 30 min

TGHT = 520 A, 5.41 V

Vacuum coming down nicely indicating carbonization process complete.

Current trip off after 5 min of being at 520 A.


 Wednesday, February 14, 2018, 15:32

EVAP1 vented with Argon and the target was removed.

Target was transferred to glove box.

Ta boat and graphite container look unbroken.

    Reply  Friday, March 02, 2018, 16:35, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Problems resolved, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 

Marla Cervantes wrote:

 Tuesday, February 13, 2018, 11:39

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 5.74 g

Graphite container = 5.20 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 used Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Tuesday, February 13, 2018, 15:30

Initial IGP1 = 2.73x10e-6 Torr

Tapped up entire process manually to 520 A in 30 min

TGHT = 520 A, 5.41 V

Vacuum coming down nicely indicating carbonization process complete.

Current trip off after 5 min of being at 520 A.


 Wednesday, February 14, 2018, 15:32

EVAP1 vented with Argon and the target was removed.

Target was transferred to glove box.

Ta boat and graphite container look unbroken.

 Friday, March 02, 2018, 16:31

A test was performed in EVAP1 (see log ID 194):

- A Ta boat without Ta shielding was submitted to 520 A and it remained at that current point overnight.

-No trip off

    Reply  Friday, March 02, 2018, 16:35, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 

Marla Cervantes wrote:

Marla Cervantes wrote:

 Tuesday, February 13, 2018, 11:39

35 circles of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 5.74 g

Graphite container = 5.20 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 used Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Tuesday, February 13, 2018, 15:30

Initial IGP1 = 2.73x10e-6 Torr

Tapped up entire process manually to 520 A in 30 min

TGHT = 520 A, 5.41 V

Vacuum coming down nicely indicating carbonization process complete.

Current trip off after 5 min of being at 520 A.


 Wednesday, February 14, 2018, 15:32

EVAP1 vented with Argon and the target was removed.

Target was transferred to glove box.

Ta boat and graphite container look unbroken.

 Friday, March 02, 2018, 16:31

A test was performed in EVAP1 (see log ID 194):

- A Ta boat without Ta shielding was submitted to 520 A and it remained at that current point overnight.

-No trip off

 

Entry  Monday, March 12, 2018, 11:14, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 

 Monday, March 12, 2018, 9:13

35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.

35 x UO2/C circles = 5.21 g

Graphite container = 6.85 g

Graphite tube is placed inside a target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3 Ta foils for heat shielding and the boat was installed in Evap1.

Chamber currently pumping down.


 Monday, March 12, 2018, 13:57

Initial IGP1 = 4.79e-7 Torr

Tapped up entire process manually to 520A in 30 min

TGHT = 520 A, 5.32 V

Vacuum coming down indicating carbonization process complete.  

Will remain at max setpoint for 1 hrs to ensure full carbonization before cooling down.


 Monday, March 12, 2018, 14:57 

Cooling down rate used 3 A/10s.


 Tuesday, March 13, 2018, 18:22

Vented with Ar and removed from EVAP1

Entry  Wednesday, March 28, 2018, 11:46, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, In progress, Carbonizing first full length 1step UCx target 

 Wednesday, March 28, 2018, 11:35

D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]

A 13mm punch was used to punch out discs from pre-cut strips using the old method.

The target consists of 195 discs with 8.1cm in length - all single discs, no packs.

195 x UO2/C discs = 19.79g

Graphite insert is placed inside a target boat with both endcaps on.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.

Chamber pumped down overnight.


 Wednesday, March 28, 2018, 13:33

IGP1 = 4.03e-7 Torr

Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.

Continued to tap up manually to 430A, 4.22V

Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.

Auto ramp at 0.2A/min from 430A-520A.


Thursday, March 29, 2018, 10:04

Reached 520A around 2am.

TGHT = 520A, 5.13V

IGP1 = 1.74e-6 Torr

Initiated auto-cool this morning at a rate of 1.0A/min.


 

    Reply  Monday, April 09, 2018, 16:51, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Problems, Carbonizing first full length 1step UCx target evap1_trip.JPGevap1_trip_archive.JPG

Laura Lambert wrote:

 Wednesday, March 28, 2018, 11:35

D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]

A 13mm punch was used to punch out discs from pre-cut strips using the old method.

The target consists of 195 discs with 8.1cm in length - all single discs, no packs.

195 x UO2/C discs = 19.79g

Graphite insert is placed inside a target boat with both endcaps on.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.

Chamber pumped down overnight.


 Wednesday, March 28, 2018, 13:33

IGP1 = 4.03e-7 Torr

Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.

Continued to tap up manually to 430A, 4.22V

Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.

Auto ramp at 0.2A/min from 430A-520A.


Thursday, March 29, 2018, 10:04

Reached 520A around 2am.

TGHT = 520A, 5.13V

IGP1 = 1.74e-6 Torr

Initiated auto-cool this morning at a rate of 1.0A/min.


 

 Monday, April 09, 2018, 16:00

ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME  

This is the 2nd time in a month this has happened without being notified.

Evap1 has therefore tripped.

During this switch there was a problem which caused the turn over to take even longer.

Sat here tapping reset until nuclear ventilation was 'back on'.

Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.


 

    Reply  Monday, April 09, 2018, 16:53, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Problems resolved, Carbonizing first full length 1step UCx target 

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, March 28, 2018, 11:35

D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]

A 13mm punch was used to punch out discs from pre-cut strips using the old method.

The target consists of 195 discs with 8.1cm in length - all single discs, no packs.

195 x UO2/C discs = 19.79g

Graphite insert is placed inside a target boat with both endcaps on.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.

Chamber pumped down overnight.


 Wednesday, March 28, 2018, 13:33

IGP1 = 4.03e-7 Torr

Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.

Continued to tap up manually to 430A, 4.22V

Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.

Auto ramp at 0.2A/min from 430A-520A.


Thursday, March 29, 2018, 10:04

Reached 520A around 2am.

TGHT = 520A, 5.13V

IGP1 = 1.74e-6 Torr

Initiated auto-cool this morning at a rate of 1.0A/min.


 

 Monday, April 09, 2018, 16:00

ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME  

This is the 2nd time in a month this has happened without being notified.

Evap1 has therefore tripped.

During this switch there was a problem which caused the turn over to take even longer.

Sat here tapping reset until nuclear ventilation was 'back on'.

Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.


 

 Monday, April 09, 2018, 16:52

Turns out I wasn't on a list of ppl who need to know about this test when I should be

They also didn't reset the alarms locally outside the hot lab so nuc vent remained not ok until this was reset.

IGP1 reached 0.027 Torr before nuc vent was ok and pumps were able to be turned back on 

Pumps back on IGP1 = 1.86e-5 Torr and still pumping down


 

    Reply  Tuesday, April 10, 2018, 14:49, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing first full length 1step UCx target 

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, March 28, 2018, 11:35

D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]

A 13mm punch was used to punch out discs from pre-cut strips using the old method.

The target consists of 195 discs with 8.1cm in length - all single discs, no packs.

195 x UO2/C discs = 19.79g

Graphite insert is placed inside a target boat with both endcaps on.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.

Chamber pumped down overnight.


 Wednesday, March 28, 2018, 13:33

IGP1 = 4.03e-7 Torr

Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.

Continued to tap up manually to 430A, 4.22V

Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.

Auto ramp at 0.2A/min from 430A-520A.


Thursday, March 29, 2018, 10:04

Reached 520A around 2am.

TGHT = 520A, 5.13V

IGP1 = 1.74e-6 Torr

Initiated auto-cool this morning at a rate of 1.0A/min.


 

 Monday, April 09, 2018, 16:00

ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME  

This is the 2nd time in a month this has happened without being notified.

Evap1 has therefore tripped.

During this switch there was a problem which caused the turn over to take even longer.

Sat here tapping reset until nuclear ventilation was 'back on'.

Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.


 

 Monday, April 09, 2018, 16:52

Turns out I wasn't on a list of ppl who need to know about this test when I should be

They also didn't reset the alarms locally outside the hot lab so nuc vent remained not ok until this was reset.

IGP1 reached 0.027 Torr before nuc vent was ok and pumps were able to be turned back on 

Pumps back on IGP1 = 1.86e-5 Torr and still pumping down


 

 Tuesday, April 10, 2018, 14:46

Glove box fixed!

Vented in Argon and transferred to glove box.

Graphite insert has moved to within 1mm of the end of the left side of the boat.

This could have happened during removal from evap1, hard to tell.

Either way, clearly a looser fit of the graphite insert in the boat indicating possible shrinkage of graphite insert.


 

Entry  Tuesday, April 17, 2018, 12:45, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Processing UC2Flk_20 

 Tuesday, April 17, 2018, 10:30

UO2/C green was prepared April 12th, 2018

The cast peeled off the glass nicely April 13th, 2018

Initial UO2 powder used = 50.56g (Inventory R-01032A, UO2 + bottle = 626.28g before use)

Graphite powder used = 10.38g

Green cast dried UO2/C + organic mass = 61.40g 

The green was rolled up and wrapped in a piece of graphite sheet.

The Ta-target boat was wrapped with 3-layers of heat shield [1 reused, 2 new] and installed in evap1 yesterday.

Chamber pumped down overnight.

IGP1 = 8.4e-7 Torr

Tapped up to 35A, 0.46V

Waited ~135min, vacuum stable.

IGP1 = 1.6e-5 Torr

Initiating auto-ramp at 0.2A/min

Target boat will be ramped up to 520A.

Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.


 Wednesday, April 18, 2018, 09:21

IGP1 = 9.6e-6 Torr

TGHT = 245A, 2.10V

Vacuum stable, increasing ramping rate to 0.5A/min.


 Thursday, April 19, 2018, 08:35

IGP1 = 3.21e-6 Torr

Materials have finished carbonizing.

TGHT = 520A, 4.97V

Evap1 has remained at max setpoints for ~6.5hrs

Initiating auto-cool at 1.0A/min


 Thursday, May 10, 2018, 10:33

Materials were vented in Ar and transferred to glove box on April 20th


 