ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
266
|
Wednesday, August 19, 2020, 07:49 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N carbothermal reduction (#2) | Wednesday, August 19, 2020, 07:47
XRD analysis of the P2N material showed that the carbothermal reduction was not completed
The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained the same
The oven was set in the EVAP1 using Ar to avoid oxidation of the P2N material
See elog 263
Wednesday, August 19, 2020, 07:47
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 4.11e-6 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, August 19, 2020, 10:00
TGHT = .45 V, 149.8 A
IGP1 = 9.1e-5 Torr
Autoramp set to 1A/10s to 200 A.
Wednesday, August 19, 2020, 10:13
TGHT = 0.6 V, 200.2 A
IGP1 = 3e-4 Torr and increasing
After 6 min:
good vacuum = 5e-2 Torr
bad vacuum = 1e-1 Torr
autoramp set to 1A/30s to 250 A
Since the pressure was decreasing, the ramp was changed to 1A/10s to 250 A, vacuum limits remained the same
Wednesday, August 19, 2020, 10:28
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 1.7e-4 Torr
TGHT = 0.78 V, 250.1 A
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, August 19, 2020, 11:17
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 2e-4 Torr
TGHT = 2.64 V, 699 A
Autoramp set to 2 A/10 s to 800 A
Wednesday, August 19, 2020, 11:29
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
IGP1 = 5.2e-5 Torr
TGHT = 3.1 V, 798.8 A
Note: Voltage starts to become unstable, an power is around 2.3 kW, pressure has not increased enough to indicate reduction with certainty
In order to reach 3 kW autoramp set to 1A/10 s to 900 A
Wednesday, August 19, 2020, 12:18
The current was increased to 1000 A expecting to see a high peak in pressure but there was not an increase in preasure.
The target is being ramped down to 850 A |
Attachment 1: P2N.PNG
|
|
267
|
Tuesday, September 08, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 carbothermal reduction | Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields, loaded with a graphite container filled with UO2/C ring-discs was set in the EVAP1
EVAP1 is currently being evacuated.
Wednesday, September 09, 2020, 10:11
IGP1 = 4.7e-6 Torr
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, September 09, 2020, 10:50
TGHT = .32 V, 149.8 A
IGP1 = 6.5e-5 Torr
Autoramp set to 1A/10s to 200 A
Wednesday, September 09, 2020, 11:00
TGHT =0.46 V, 200 A
IGP1 = 6e-4 Torr and going up
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/10s to 250 A
autoramp stopped at 215 A, since pressure kept increasing, the current was manually decreased to 180 A.
Wednesday, September 09, 2020, 11:16
TGHT = 0.4 V, 179.7 A,
IGP1 = 8.5e-4 Torr an going down
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/30s to 200 A
Wednesday, September 09, 2020, 11:32
TGHT = 0.46 V, 200.2 A,
IGP1 = 3e-3 Torr an going down
good vacuum = 5e-2 Torr
bad vacuum = 1e-2 Torr
autoramp set to 1A/30s to 300 A
Wednesday, September 09, 2020, 11:38
IGP1 = 1e-3 Torr
Since the pressure was decreasing, the ramp was stopped at 210 and changed to 1A/10s to 300 A, vacuum limits remained the same
Wednesday, September 09, 2020, 11:53
The pressure reached the bad vacuum limit 1e-2 Torr and stopped
After ~8min the pressure limits were changed to:
good vacuum = 5e-2 Torr
bad vacuum = 1e-1 Torr
Wednesday, September 09, 2020, 12:05
IGP1 = 1.15e-3 Torr
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, September 09, 2020, 12:36
Pressure increased! and ramp paused at 685 A
re-started autoramp to 700 A at 1A/10s
Wednesday, September 09, 2020, 13:56
Pressure kept increasing after 700 A, so autoramp was set to 750 A at 1A/10s
Pressure kept increasing
At 750 A pressure started reducing, autoramp was set to 760 A at 1A/10 s
System tripped suddenly (Gelo was notified)
The carbothermal reduction seemed complete |
Attachment 1: P2N-2-CR-1.PNG
|
|
268
|
Thursday, September 10, 2020, 14:07 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 Conditioning | Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced but at the maximum current, the power supply tripped (elog. 267)
Therefore, the target was not hot long enough to fully outgas, that is why it will be reheated.
Desired current 650 A
Thursday, September 10, 2020, 14:07
IGP1 = 3.3e-6 Torr
Autoramp set to 650 A at 1 A/10 s
Thursday, September 10, 2020, 16:06
Ramp reached desired current
TGHT = 2.4 V, 649 A
IGP1 = 3e-3 Torr
Friday, September 11, 2020, 11:17
TGHT = 2.24 V, 649.2 A
IGP1 = 3.7e-6 Torr
Friday, September 11, 2020, 12:55
TGHT = 2.2 V, 648.8 A
IGP1 = 3.7e-6 Torr
Autoramp set to 700 A at 1 A/10 s,
No more gas was released, the system was ramped down to 0 A at 2 A/min
Friday, September 11, 2020, 18:17
TGHT = 0.35 V, 133 A
IGP1 = 2.7e-6 Torr
Friday, September 11, 2020, 20:01
TGHT = 0 V, 2.56 A
IGP1 = 2.6e-6 Torr
Monday, September 14, 2020, 16:19
EVAP1 was vented with Ar and the P2N material was transferred to the preparatory glove box. |
269
|
Tuesday, March 30, 2021, 16:04 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-3 carbothermal reduction | Green target material characteristics (elog 105)
#discs = 49
Average disc thickness = 0.453mm
Empty cartridge weight = 9.42 g
Full cartridge weight = 39.86 g
UO2+C weight = 30.44 g
Tuesday, March 30, 2021, 16:04
The target material was loaded in a P2N oven, wrapped with three heat shields, and set in the EVAP1
EVAP1 is currently being evacuated.
Wednesday, March 31, 2021, 09:42
IGP1 = 3.24e-6 Torr
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Autoramp set to 1A/10s to 150 A.
Wednesday, March 31, 2021, 10:17
TGHT = .54 V, 149.88 A
IGP1 = 6.3e-4 Torr and increasing
Max pressure = 0.06 Torr
Wednesday, March 31, 2021, 10:33
IGP1= 0.004 Torr
Autoramp set to 1A/10s to 200 A
Wednesday, March 31, 2021, 10:43
Maximum pressure 0.03 Torr and going down
Autoramp set to 1A/10s to 250 A
Wednesday, March 31, 2021, 11:04
TGHT = 1.1 V, 299.9 A
IGP1 = 6e-4 Torr and going down
Autoramp set to 2.5 A/10 s to 700 A
Wednesday, March 31, 2021, 11:35
Ramp stopped at 690 A
TGHT = 2.9V, 689.1A
IGP1 = 0.127 Torr
Wednesday, March 31, 2021, 11:37
Autoramp set to 700 A at 1A/20s
Manually ramped to 740 A (3V) to make sure carbothermal reduction is done.
Wednesday, March 31, 2021, 12:00
The power supply tripped, Gelo was monitoring the heating process.
Wednesday, March 31, 2021, 14:33
The target will be heated for 4 hours to get read of impurities.
IGP1 = 6e-6 Torr
Autoramp set to 650 at 1A/10s
Wednesday, March 31, 2021, 20:37
TGHT = 2.77 V, 669.6A
IGP1 = 8.5e-6 Torr
EVAP1 ramped down to 0 A at 2 A/min |
216
|
Friday, August 17, 2018, 11:23 |
Marla Cervantes | UC2 | NA | | Done | UCx 1-step casting -Oxidation test | Friday, August 17, 2018, 11:17
Four discs of UCx produced with the 1-step casting method were placed in a glass jar.
The mass of the discs was 0.400 g.
The glass jar with the discs were placed in the heating chamber of the IEVAP.
Currently IEVAP is pumping down until vacuum is in the order of ~10^-6 Torr.
Friday, August 17, 2018, 16:28
Final vacuum: 9.5x10^-6 Torr
IEVAP's heating chamber will be vented with air and the materials will be taken out.
Friday, August 17, 2018, 17:27
Material was transferred to the glove box
|
247
|
Tuesday, October 08, 2019, 09:53 |
Marla Cervantes | UC2 | 44062-6 | LP-SIS | Done | UCx29 Conditioning | Monday, October 07, 2019, 09:51
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
Tuesday, October 08, 2019, 09:51
IGP1 = 1.9596e-6 Torr
Autoramp set up to:
TGHT= 1 A/min to 425 A (same current used to reach 1900C in evap2 when sintering TaC coating - e-log 241 evap2)
TBHT= 1 A/min 230 A
The limits are:
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Wednesday, October 09, 2019, 13:58
After 4 hours at maximum current, the current was ramped down at 1 A/min for both.
Wednesday, October 09, 2019, 14:00
EVAP1 was vented with Ar, and the target oven was removed to access the Ta cap.
The Ta cap difference in mass was 0.002 g |
241
|
Wednesday, September 18, 2019, 09:57 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #1 | Wednesday, September 18, 2019, 07:48
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
IGP1 = 9.3e-6 Torr
Autoramp set up to:
TGHT= 0.2 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 0.1 A/min 230 A
The limits are:
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Wednesday, September 18, 2019, 09:55
The autoramp where changed to 1 A/min on both the TGHt and the TGHT.
Wednesday, September 18, 2019, 21:06
After 4 hours at TGHT = 4.15 V, 437.76 A and TBHT = 2.77 V, 228.31 A (and pressure of 1.07e-5 Torr)
The autoramp was set to TGHT = - 1 A/min and TBHT = -0.5 Torr
Tuesday, September 29, 2019, 14:05
The EVAP1 was vented with Ar and the target was removed,
The target was directly assembled after removing it from EVAP1
Finally, the assembly was transferred to the glove box |
242
|
Tuesday, September 24, 2019, 06:53 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #2 | Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously conditioned e-log 241, was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 2.91e-6 Torr
Wednesday, September 24, 2019, 18:30
IGP1 = 5.77e-6 Torr
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Wednesday, September 25, 2019, 13:56
EVAP1 was vented with Ar,
The target container was removed to look at the Ta cap
The Ta cap was coated.
Wednesday, September 25, 2019, 13:58
A new Ta cap was set in the transfer tube hole and the target container was installed again. |
243
|
Wednesday, September 25, 2019, 14:00 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #3 | Wednesday, September 25, 2019, 14:00
The target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
EVAP1 currently pumping down.
Thursday, September 26, 2019, 07:09
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 1.51e-6 Torr
Friday, September 26, 2019, 12:56
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Friday, September 27, 2019, 17:59
EVAP1 was vented with Ar, the target was removed from the heating chamber to exchange the Ta cap for a new one.
The old Ta cap was not fully coated and it presented a different coloration with respect to the 2 previous caps used for conditioning. |
244
|
Friday, September 27, 2019, 18:04 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #4 | Friday, September 27, 2019, 18:03
The target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning,
the reason was to get rid of all the material that could evaporate from the target and has the potential of clogging the ionizer.
EVAP1 currently pumping down.
Saturday, September 28, 2019, 09:33
The heating conditions are the same as the previous conditioning:
TGHT= 1 A/min to 438 A (same current used to reach 1900C in evap2 when sintering TaC coating - elog-455 evap2)
TBHT= 1 A/min 230 A
IGP1 = 1.419e-6 Torr
The ramping started at 9:36 am on Septemper 28th
Sunday, September 29, 2019, 12:30
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Monday, September 30, 2019, 11:40
After 23 hours being heated, the target was cooled down and EVAP1 was vented with Ar
The target was removed form EVAP1 and placed in the fumehood.
The tantalum cap used to collect the outgassed material from the target container was not fully coated.
The heat shields of the target container were removed and the target container was inspected,
the ends of the Ta container were crystallized, the area above the graphite cartridge does not have signs of crystallization. |
Attachment 1: IMG_1393.JPG
|
|
245
|
Wednesday, October 02, 2019, 11:07 |
Marla Cervantes | UC2 | 44062-4 | LP-SIS | Done | UCx28 Conditioning #5 | Monday, September 30, 2019, 10:54
After being exposed to air for 1.5 hours,
the target UCx28 that was previously conditioned , was set again in the EVAP1 for re-conditioning.
The UCx28 was wrapped with 3 new Ta-heat shields and placed in the EVAP1,
EVAP1 is currently pumping down.
Tuesday, October 1, 2019, 08:33
The heating conditions are:
TGHT= 1 A/min to 430 A
TBHT= 1 A/min 230 A
Initial vacuum IGP1 = 1.22193-6 Torr
Since the ends of the target container are crystallized and the voltage is starting to vary, the target was heated only for 3 hours instead of 4.
The cooling conditions are the same as the previous conditioning:
TGHT= -1 A/min
TBHT= -0.5 A/min
Wednesday, October 02, 2019, 11:01
EVAP1 was vented with Ar and the target was removed form EVAP1 and assembled,
the assembly was placed in the glove box.
The tantalum cap used to collect the outgassed material from the target container was not fully coated. |
251
|
Wednesday, November 06, 2019, 11:48 |
Marla Cervantes | UC2 | 44062-3 | LP-SIS | Done | UCx#30 Conditioning | Tuesday, November 05, 2019, 16:43
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields
EVAP1 pumping down
Wednesday, November 06, 2019, 11:46
IGP1 = 2.09e-6 Torr
Good vacuum 5e-5 Torr
Bad vacuum 8e-5 Torr
Autoramp set up to:
TGHT= 1 A/min to 465 A (same current used to reach 1865 C in evap2 when sintering TaC coating - e-log 464 evap2)
TBHT= 1 A/min 230 A
Thursday, November 07, 2019, 10:15
After approximately 4 hours at maximum temperature the pressure was 5.85e-6 Torr and the autoramp was set to:
TGHT -1 A/min
TBHT -0.5 A/min
After 4 hours that the current stayed at 0 A, EVAP1 was vented with argon and the target was removed; before transferring the target to the preparatory glove box, the tantalum cap to collect deposits from the target was inspected, there was not deposits on it so it was determined that the conditioning was successful and the target was transferred to the preparatory glove box. |
238
|
Friday, May 24, 2019, 15:25 |
Marla Cervantes | | 43943-1 | | Done | Graphite insert test - FOILS | Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded with graphite foils was transferred to EVAP1
https://elog.triumf.ca/TIS/Evaporator_2/445
The tueb will be heated with the same power used in EVAP2,
the power of the EVAP2 and EVAP1 will be matched using the fit from Document-126503
The chamber is currently pumping down
Monday, May 27, 2019, 08:58
The current will be tapped to 50 A to replicate the procedure of EVAP2
then the current will be set to 1 A/min to 500 A and increased to match with EVAP2 power.
|
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a tantalum tube in the evaporator 2 for 3 days
The objective of the test was to determine the current and voltage required to reach 2000 C
Current 424.2 A, voltage 7.17 V, P = 3 kW
details can be find here https://elog.triumf.ca/TIS/Evaporator_2/433
The test will continue for 2 weeks in the EVAP1.
Good vacuum 5e-4 Torr
Bad vacuum 1.00e-4
Pressure IGP1 = 1.55e-6 Torr
The autoramp was set to 420 A, at 1 A/min,
Monday, April 01, 2019, 07:57
TGHT = 4.68 V, 424.32 A
IGP1 = 9.61e-7 Torr
Autoramop is set to -1 A/min to 0 A
Monday, April 01, 2019, 11:19
IGP1=5.43e-7 Torr
At TGHT = 223 A and 2.1 V the autoramp was increased to -2 A/min
Monday, April 01, 2019, 11:20
Sudden and unexpected pressure increment to 1.4e-5 Torr, might be a glitch.
Monday, April 01, 2019, 13:10
IGP1 = 4.34e-7Torr
The autoramp was stopped at TGHT = 17.28 A, 0.0625 V,
and it was lower down to 0 A manually
Results: The tantalum tube deformed in the contact points with the graphite insert |
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to a graphite insert (see picture caps)
The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets.
The system was installed in the EVAP1, and it will be heated for a week at 2000 C.
Currently pumping down.
Thursday, April 11, 2019, 13:26
IGP1 = 9.9e-7 Torr
The current is tapped to 40 A
After 1hr the autoramp is set to 1 A/min to TGHT 500 A
The TGHT current remained at 500 A for week
until at April 18 at ~4:30 pm
a localized power outage tripped the EVAP1.
The EVAP1 was ventd with air and the tantalum tube was removed
The tantalum tube did not break. |
Attachment 1: caps.jpg
|
|
Attachment 2: Curren-voltage-plot.JPG
|
|
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
Yesterday the tube was set in the EVAP1 and pumped down.
Friday, April 05, 2019, 10:07
IGP1= 1.61e-6 Torr
The current is manually tapped to 40 A.
Friday, April 05, 2019, 13:25
After ~2 hours
IGP1 = 1.54e-6 Torr
TGHT = 0.61 V, 40.39 A
Autoramp is set to 1 A/min to 400 A
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Sunday, April 07, 2019, 9:00
The current was increased to 424 A
Monday, April 08, 2019, 16:36
EVAP1 vented with air, sintered tube was removed. |
Attachment 1: EVAP1-TaC_Coating.JPG
|
|
228
|
Tuesday, October 30, 2018, 10:17 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | In progress | UCx Fully loaded graphite insert thermal test - FL#1 | Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heatinf test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Attachment 1: Heat_test.JPG
|
|
229
|
Wednesday, October 31, 2018, 10:30 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Problems | UCx Fully loaded graphite insert thermal test - FL#1 |
Marla Cervantes wrote: |
Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heating test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Wednesday, October 31, 2018, 10:09
The current tripped off, around 5:00 am, the pressure was below 1e-5 Torr (see fig. current-trip_off).
On a previous test, we measured the maximum temperature of the power supply = 33.3 C (e-log 227).
Power supply overheating doesn't seem to be the problem.
EPICS windows are half withe and not answering correctly.
Also, TBHT says that IGP1 < 500 mTorr, and its interlock needs reset (see figure EPICS). |
Attachment 1: current-trip_off.JPG
|
|
Attachment 2: epics.JPG
|
|
230
|
Wednesday, October 31, 2018, 15:23 |
Marla Cervantes | UC2 | 43044-7 | LP-SIS | Done | UCx Fully loaded graphite insert thermal test - FL#1 |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered (e-log 420 Evaporator_2)
The container was loaded with a graphite insert loaded with UCx
Graphite insert + UCx mass = 26.927 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the contianer
IGP1 = 8.72e-7 Torr
The current was tapped manually to 440 A TGHT and 230 A TBHT (see fig. Heating test)
Maximum pressure during heating = 1.7e-3 Torr.
Target will stay at maximum current for 1 week.
|
Wednesday, October 31, 2018, 10:09
The current tripped off, around 5:00 am, the pressure was below 1e-5 Torr (see fig. current-trip_off).
On a previous test, we measured the maximum temperature of the power supply = 33.3 C (e-log 227).
Power supply overheating doesn't seem to be the problem.
EPICS windows are half withe and not answering correctly.
Also, TBHT says that IGP1 < 500 mTorr, and its interlock needs reset (see figure EPICS).
|
Wednesday, October 31, 2018, 15:20
The problem was reported to controls, it will be also reported to power supply group.
In the meantime, the target will be ramp-up again with the auto ramp at:
TGHT = 20 A/min to 440 A
TBHT = 10 A/min to 230 A
The pressure before heating is 4.07e-7 Torr
Wednesday, October 31, 2018, 19:24
The maximum pressure during heating was 6.57e-6 Torr.
Current pressure 3.00e-6Torr
Wednesday, November 07, 2018, 18:37
IGP1 = 9.7e-7 Torr
TGHT = -2 A/min to 0A
TBHT = -1 A/min to 0A
Thursday, November 08, 2018, 16:16
EVAP1 was vented with Ar, and target was transferred to glove box.
The mass of the loaded graphite insert changed to 26.854 g
That is a difference of 0.075 g
The tantalum container "cathode" crystalized (see fig)
The rest of the tantalum container did not change. |
Attachment 1: Ta-container.png
|
|
282
|
Friday, June 03, 2022, 06:21 |
Darwin Ortiz Rosales | UO2/C | 42218-4 | LP-IG-LIS | Done | UCx#39 reduction |
Friday, June 03, 2022, 06:24
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)
IGP1 = 1.4 e-6 Torr
Good vacuum = 5e-2 Torr
Bad vacuum = 5e-1 Torr
Current ramp is 1A per 10s from 0A to 80A at 1A/10s. Then at 1A/min to 120 A, allow degas and then autoramp 1A/10s from 120A to (450-550A)
Friday, June 03, 2022, 06:52
starting autoramp at 1A/min to 120A
Friday, June 03, 2022, 07:30
note*: At approximately 108A the pressure did not rise again but was stable.
Friday, June 03, 2022, 07:46
started autoramp at 1A/10s to 450A
Friday, June 03, 2022, 09:29
start autoramp to 500A at 1A/min
Friday, June 03, 2022, 09:40
pressure keeps stable as ramping continues.
increased ramp rate to 2A/min
Friday, June 03, 2022, 09:56
Drop in pressure observed as current increased at 2A/min.
Final current is 490A. Will keep at this current for 4 hours.
Friday, June 03, 2022, 14:05
Start auroramp to 400A at -2A/30s
will keep at 400A for 8 hours
Friday, June 03, 2022, 22:06
Start autoramp down at -2A/min to 0A
IGP1= 1.6e-06 Torr
TGHT= 400A, 3.6 V |
|