84
|
Monday, December 02, 2013, 16:10 |
Anders Mjos | | | | Done | Copper bar on TGHT | The conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: |
|
|
89
|
Tuesday, March 04, 2014, 15:48 |
John Wong | | | TARGET BOAT | In progress | Re-sinterring end caps | Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were |
|
|
90
|
Wednesday, March 05, 2014, 10:30 |
Laura Lambert | | | TARGET BOAT | In progress | Re-sinterring end caps |
|
|
|
91
|
Wednesday, March 05, 2014, 23:05 |
John Wong | | | TARGET BOAT | Done | Re-sinterring end caps |
|
|
|
105
|
Thursday, December 11, 2014, 10:17 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays. |
|
|
106
|
Friday, January 23, 2015, 15:02 |
Laura Lambert | | | | Maintenance | water supply turned back on to EVAP1 and fume hoods | Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods |
|
|
110
|
Tuesday, April 21, 2015, 11:28 |
Laura Lambert | | | | Maintenance | Ion Gauge replaced March 23rd 2015 | |
|
|
119
|
Saturday, August 29, 2015, 16:12 |
Anders Mjos | | | | Problems | Restarting vacuum after power outage | Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo |
|
|
131
|
Monday, May 16, 2016, 15:52 |
Laura Lambert | | | | | Full clean of EVAP1 | Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.
|
|
|
134
|
Tuesday, August 23, 2016, 17:35 |
John Wong | | | TARGET BOAT | | Sintering TaC coated target boat | Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed)
and wrapped with Ta-heat shield. |
|
|
135
|
Monday, September 12, 2016, 17:41 |
John Wong | | | TARGET BOAT | In progress | RUSH. Sintering end-caps | Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long
Ta-wire in spring sharp were coated |
|
|
136
|
Tuesday, September 20, 2016, 10:49 |
Laura Lambert | | | TARGET BOAT | Done | RUSH. Sintering end-caps |
|
|
|
143
|
Tuesday, December 20, 2016, 15:03 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | |
|
|
148
|
Wednesday, May 24, 2017, 09:34 |
Laura Lambert | | | | Maintenance | VACUUM TRIP OFF SETPOINT CHANGED | Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously |
|
|
153
|
Wednesday, June 07, 2017, 12:48 |
Aaron Schmidt | | | | | Turbo pump cooling | Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump. |
|
|
156
|
Thursday, July 13, 2017, 12:49 |
Laura Lambert | | | | Problems | *hot lab is HOT* | Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! |
|
|
163
|
Thursday, July 27, 2017, 09:08 |
Laura Lambert | | | | Problems resolved | *hot lab is HOT* |
|
|
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected |
|
|
166
|
Wednesday, September 20, 2017, 08:07 |
Aaron Schmidt | | | | Maintenance | Ion gauge & RP status | Wednesday, September 20, 2017, 08:00:
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old |
|
|
170
|
Tuesday, November 07, 2017, 11:57 |
Laura Lambert | | | | Maintenance | Interlocks limits changed to 100mTorr | Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray |
|
|