  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject
  259   Tuesday, May 26, 2020, 20:44 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#33 Carbothermal Reduction

 Tuesday, May 26, 2019, 18:20

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday May 22, 2020)

The set up was installed in the EVAP1 and pumped down during the weekend.

IGP1 = 7.10 e-7 Torr

Good vacuum = 1e-1 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 120A


Tuesday, May 26, 2020, 19:15
 
Heater (TGHT) tripped after being at 120A about approximately 10 min.
The pressure was below 500 mTorr when the trip occured (around 20 mTorr) .  Pressure did not appear to have gone past 200 mTorr but was dropping fast at the time of trip.  
Will try again tomorrow after consulting with Gelo.
 

 
 Wednesday, May 27, 2020, 10:26
 
Trying again while monitoring Power Supply reading ( Darwin Remotely and Marla onsite)

IGP1 = 7.7 e-7 Torr

Good vacuum = 1e-1 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 120A


 Wednesday, May 27, 2020, 10:49

Reached 120A on TGHT

TGHT= 0.92V 

IGP1 = 3.6 e-06 Torr and rising


Wednesday, May 27, 2020, 12:46

TGHT =  120.2 A, 0.98V

IGP1 = 6.85e-6 Torr

Starting ramp at 3A per 10s up to 550 A or up to pressure drop start


Wednesday, May 27, 2020, 14:21

Heater tripped again at around 0.14 Torr and approx 440 A

Will start again hoping pressure stable enough to not trip heater.


Wednesday, May 27, 2020, 14:22

IGP1= 1.05e-6 Torr

Ramping to 120 A at 1 A per 10 s



Wednesday, May 27, 2020, 15:12 

Starting ramp on TGHT at 3A per 10s up to 550A or pressure dip.


Wednesday, May 27, 2020, 15:35

Changed vacuum settings (paused ramp and restarted) 

Good vacuum 1e-2

bad vacuum 5e-1


Wednesday, May 27, 2020, 16:30

TGHT = 549.4 A, 5.35V

IGP1= 2.1e-5 Torr

Reached 550 at approx 4 pm 


Thursday, May 28, 2020, 00:31

IGP1= 3.31e-6Torr

TGHT = 549.3 A, 5.45V

Initiate ramp down  at 2 A/min to 0A

Reduced cartridge was dismounted Friday, May 29, 2020 and transferred to Glove box.

 


 

 

  262   Wednesday, June 03, 2020, 08:10 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 Carbothermal Reduction

Wednesday, June 03, 2020, 08:11 

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday May 29, 2020)

The set up was installed in the EVAP1 then IEVAP:IGP1 was replaced (elogs 260 and 261).  

Vacuum was turned on after Ion Gauge swap.

IGP1 = 3.6 e-5 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 120A


Wednesday, June 03, 2020, 09:59 

After about 20 minutes at 120 A, TGHT tripped again exactly as before.

Will restart ramp at 1A per 10s from 0A to 120A .  Will set good vacuum to 1e-2 Torr

IGP1= 4.3e-05 Torr


Wednesday, June 03, 2020, 10:57

IGP1 =  9e-4 Torr

Pressure peaked around 4e-3 Torr and now trending down

TGHT =120 A


Wednesday, June 03, 2020, 11:23

IGP1=9.5e-5 Torr

Good Vacuum 1e-02 Torr

Bad Vacuum 5e-1 Torr

Starting TGHT ramp to 550 A at 3A per 10s  


Wednesday, June 03, 2020, 14:41

ramp up was good.  TGHT at 550 A since 12:30 pm.  TGHT did not trip. *note adjusted good vacuum.  Ramping takes a little longer but doesn't trigger TGHT shutdown.


Wednesday, June 03, 2020, 22:55

IGP1 =  3.5e-5 Torr

TGHT = 249.4 A, 5.7 V

Start ramp down at -2A per minute to 0 A


 

  266   Wednesday, August 19, 2020, 07:49 Marla CervantesUO2/CP2N-02 DoneP2N carbothermal reduction (#2)

Wednesday, August 19, 2020, 07:47 

XRD analysis of the P2N material showed that the carbothermal reduction was not completed

The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained the same

The oven was set in the EVAP1 using Ar to avoid oxidation of the P2N material

See elog 263


Wednesday, August 19, 2020, 07:47

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

IGP1 = 4.11e-6 Torr

Autoramp set to 1A/10s to 150 A.


Wednesday, August 19, 2020, 10:00

TGHT = .45 V, 149.8 A

IGP1 = 9.1e-5 Torr

 Autoramp set to 1A/10s to 200 A.


Wednesday, August 19, 2020, 10:13

TGHT = 0.6 V, 200.2 A

IGP1 = 3e-4 Torr and increasing

After 6 min:

good vacuum =  5e-2 Torr

bad vacuum = 1e-1 Torr

autoramp set to 1A/30s to 250 A

Since the pressure was decreasing, the ramp was changed to  1A/10s to 250 A, vacuum limits remained the same


Wednesday, August 19, 2020, 10:28

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

IGP1 = 1.7e-4 Torr

TGHT =  0.78 V, 250.1 A

Autoramp set to 2.5 A/10 s to 700 A


Wednesday, August 19, 2020, 11:17

 Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

IGP1 = 2e-4 Torr

TGHT = 2.64 V, 699 A

Autoramp set to 2 A/10 s to 800 A


 Wednesday, August 19, 2020, 11:29

 Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

IGP1 = 5.2e-5 Torr

TGHT = 3.1 V, 798.8 A

Note: Voltage starts to become unstable, an power is around 2.3 kW, pressure has not increased enough to indicate reduction with certainty

In order to reach 3 kW autoramp set to 1A/10 s to 900 A


Wednesday, August 19, 2020, 12:18

The current was increased to 1000 A expecting to see a high peak in pressure but there was not an increase in preasure.

The target is being ramped down to 850 A 

Attachment 1: P2N.PNG
P2N.PNG
  267   Tuesday, September 08, 2020, 20:45 Marla CervantesUO2/CP2N-02 DoneP2N-2 carbothermal reduction

 Tuesday, September 08, 2020, 20:44

A P2N oven with three heat shields, loaded with a graphite container filled with UO2/C ring-discs was set in the EVAP1

EVAP1 is currently being evacuated.


Wednesday, September 09, 2020, 10:11

IGP1 = 4.7e-6 Torr

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/10s to 150 A.


Wednesday, September 09, 2020, 10:50 

TGHT = .32 V, 149.8 A

IGP1 = 6.5e-5 Torr

Autoramp set to 1A/10s to 200 A 


Wednesday, September 09, 2020, 11:00

TGHT =0.46 V, 200 A

IGP1 =  6e-4 Torr and going up

good vacuum =  5e-2 Torr

bad vacuum = 1e-2 Torr

autoramp set to 1A/10s to 250 A

autoramp stopped at 215 A, since pressure kept increasing, the current was manually decreased to 180 A.


 Wednesday, September 09, 2020, 11:16

TGHT = 0.4 V, 179.7 A,

IGP1 = 8.5e-4 Torr an going down

good vacuum =  5e-2 Torr

bad vacuum = 1e-2 Torr

autoramp set to 1A/30s to 200 A


Wednesday, September 09, 2020, 11:32

TGHT = 0.46 V, 200.2 A,

IGP1 = 3e-3 Torr an going down

good vacuum =  5e-2 Torr

bad vacuum = 1e-2 Torr

autoramp set to 1A/30s to 300 A


Wednesday, September 09, 2020, 11:38

IGP1 = 1e-3 Torr 

Since the pressure was decreasing, the ramp was stopped at 210 and changed to  1A/10s to 300 A, vacuum limits remained the same


Wednesday, September 09, 2020, 11:53

The pressure reached the bad vacuum limit 1e-2 Torr and stopped

After ~8min the pressure limits were changed to:

good vacuum =  5e-2 Torr

bad vacuum = 1e-1 Torr


Wednesday, September 09, 2020, 12:05 

IGP1 = 1.15e-3 Torr

Autoramp set to 2.5 A/10 s to 700 A


Wednesday, September 09, 2020, 12:36

Pressure increased! and ramp paused at 685 A

re-started autoramp to 700 A at 1A/10s


Wednesday, September 09, 2020, 13:56

Pressure kept increasing after 700 A, so autoramp was set to 750 A at  1A/10s

Pressure kept increasing

At 750 A pressure started reducing, autoramp was set to 760 A at 1A/10 s

System tripped suddenly (Gelo was notified)


The carbothermal reduction seemed complete 

Attachment 1: P2N-2-CR-1.PNG
P2N-2-CR-1.PNG
  268   Thursday, September 10, 2020, 14:07 Marla CervantesUO2/CP2N-02 DoneP2N-2 Conditioning

 Thursday, September 10, 2020, 14:01

A P2N target was carbothermal reduced but at the maximum current, the power supply tripped (elog. 267)

Therefore, the target was not hot long enough to fully outgas, that is why it will be reheated.

Desired current 650 A


Thursday, September 10, 2020, 14:07 

IGP1 =  3.3e-6 Torr

Autoramp set to 650 A at 1 A/10 s 


Thursday, September 10, 2020, 16:06

Ramp reached desired current

TGHT = 2.4 V, 649 A

IGP1 = 3e-3 Torr 


 Friday, September 11, 2020, 11:17

TGHT = 2.24 V, 649.2 A

IGP1 = 3.7e-6 Torr


Friday, September 11, 2020, 12:55 

 TGHT = 2.2 V, 648.8 A

IGP1 = 3.7e-6 Torr

Autoramp set to 700 A at 1 A/10 s,

No more gas was released, the system was ramped down to 0 A at 2 A/min


Friday, September 11, 2020, 18:17

TGHT = 0.35 V, 133 A

IGP1 = 2.7e-6 Torr


 Friday, September 11, 2020, 20:01

TGHT = 0 V, 2.56 A

IGP1 = 2.6e-6 Torr


Monday, September 14, 2020, 16:19

EVAP1 was vented with Ar and the P2N material was transferred to the preparatory glove box. 

  269   Tuesday, March 30, 2021, 16:04 Marla CervantesUO2/CP2N-02 DoneP2N-3 carbothermal reduction

Green target material characteristics  (elog 105)

#discs = 49

Average disc thickness = 0.453mm

Empty cartridge weight = 9.42 g

Full cartridge weight = 39.86 g

UO2+C weight = 30.44 g 


Tuesday, March 30, 2021, 16:04

The target material was loaded in a P2N oven, wrapped with three heat shields, and set in the EVAP1

EVAP1 is currently being evacuated.


Wednesday, March 31, 2021, 09:42

IGP1 = 3.24e-6 Torr

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/10s to 150 A. 


Wednesday, March 31, 2021, 10:17

TGHT = .54 V, 149.88 A

IGP1 = 6.3e-4 Torr and increasing

Max pressure = 0.06 Torr


Wednesday, March 31, 2021, 10:33 

IGP1= 0.004 Torr

Autoramp set to 1A/10s to 200 A


Wednesday, March 31, 2021, 10:43

Maximum pressure 0.03 Torr and going down

Autoramp set to 1A/10s to 250 A


Wednesday, March 31, 2021, 11:04 

TGHT = 1.1 V, 299.9 A

IGP1 = 6e-4 Torr and going down

Autoramp set to 2.5 A/10 s to 700 A


Wednesday, March 31, 2021, 11:35

Ramp stopped at 690 A

TGHT = 2.9V, 689.1A

IGP1 = 0.127 Torr 


Wednesday, March 31, 2021, 11:37

Autoramp  set to 700 A at 1A/20s

Manually ramped to 740 A (3V) to make sure carbothermal reduction is done.


 Wednesday, March 31, 2021, 12:00

The power supply tripped, Gelo was monitoring the heating process.



Wednesday, March 31, 2021, 14:33

The target will be heated for 4 hours to get read of impurities.

IGP1 = 6e-6 Torr 

Autoramp set to 650 at 1A/10s 


Wednesday, March 31, 2021, 20:37

TGHT = 2.77 V, 669.6A 

IGP1 = 8.5e-6 Torr

EVAP1 ramped down to 0 A at 2 A/min

  272   Wednesday, June 30, 2021, 13:35 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 conditioning

Target #34 was installed in the EVAP1 and pumped down (Tuesday June 29, 2021).

Target #34 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.

IGP1 = 1.85e-6 Torr

Good vacuum = 1e-1 Torr

Bad vacuum = 5e-1 Torr

Power desired 1.6kW. This is the second target conditioned this way. 

Subsequent targets should be conditioned following thermal reduction.


 Thursday, July 01, 2021, 06:05

IGP1= 1.35e-06 Torr

Start autoramp @2A/30s to 400A


Thursday, July 01, 2021, 07:59

Pressure increase was observed near 400A 

will ramp to 450A and  keep for 8 hours

IGP1= 1.4 e-05 Torr


450A and 4.0V reached at 8:14 am on Thursday July 01, 2021

Rampdown @-2A/min was started at 4.14 pm on Thursday July 01, 2021 IGP1 stable at 2.7e-06Torr

Cannot transfer into glovebox yet because moisture is a bit high after regeneration.  Moisture is dropping. Will wait until moisture is sufficiently low.


Monday, July 05, 2021, 20:43

Cartridge was removed and placed in bag inside glovebox

Removed 10 discs for analysis but might place them back inside depending on final decision.  We had previously removed 10 discs after thermal reduction.

 

  273   Wednesday, July 07, 2021, 12:40 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx Provisional ID= 200229 conditioning

 Wednesday, July 07, 2021, 14:39

Target Provisional ID = 200929 was installed in the EVAP1 and pumped down (Tuesday July 7, 2021).

Target is going to be thermally reduced for 8 hours and then conditioned for an additional 8 hours

IGP1 = 2.0 e-6 Torr

Good vacuum = 1e-1 Torr

Bad vacuum = 5e-1 Torr

Power desired 1.6kW.

10 extra discs included for analysis


Wednesday, July 07, 2021, 14:49 

Ramping up TGHT at 6A/min [wait interval = 10 s at increments of 1A]


Wednesday, July 07, 2021, 15:58

IGP1= 5.7 e-5 Torr and trending down.  Will start ramp up to 450A at  18A/min [wait interval 10s at 3A increments]

 


Wednesday, July 07, 2021, 16:20 

IGP1= 2.2e-3 Torr

Will continue ramping TGHT to 500A and watch pressure


Wednesday, July 07, 2021, 16:26

Continue ramping to 550 at 3A/10s


 Wednesday, July 07, 2021, 16:29

holding at 550A, 5.1V for 8 hours 


Wednesday, July 07, 2021, 23:41 

TGHT = 550A, 5.7 V

begin ramp down at -2A/min to 450A and leave for 8 hours


Thursday, July 08, 2021, 08:20

 IGP1= 2.7 e-06 Torr

TGHT = 450A, 4.5V

Will start ramp down at -2A/min to 0A 


 

 

  274   Wednesday, September 15, 2021, 07:19 Marla CervantesUC2 TARGET BOATDoneConditioning 2sc samples

Wednesday, September 14, 2021, 21:14

Boat is wrapped with 2 layers of Ta-heat shield

The samples consists of 15 discs of UCx of 14mm diameter

The chamber is currently pumping down.

TGHT will be ramped up to 450 A


Wednesday, September 15, 2021, 07:17

IGP1 = 6.75e-6 Torr

Tapped up manually to 40A.

TGHT = 60 A, 2.39 V

Vacuum stable IG1 = 7.25e-6 Torr

Initiating auto-ramp for TGHT at a rate of 0.2A/min to 445 A

Parameter setup: 5.0e-5 good vac, 8.0e-5 bad vac.


 Wednesday, September 15, 2021, 11:57

IGP1=2.24e-5 Torr

TGHT= 102.016 A, 1.275 V

Autoramp changed to 1A/min to 450 A


Wednesday, September 15, 2021, 12:53

IGP1 = 3.3e-5 torr

TGHT= 150 A,  V

Autoramp changed to 2A/30s to 450 A

 1e-1 good vac, 5e-1 bad vac


Wednesday, September 15, 2021, 12:59

 


Friday, September 17, 2021, 07:54

IGP1 = 3.81e-6 Torr

TGHT = 449.6 A, 4.31 V

Autoramp set to -2A/min to 0 A 

  275   Thursday, September 23, 2021, 07:03 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#35 C reduction

 Thursday, September 23, 2021, 06:55

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Wednesday September 22)

IGP1 = 3.6 e-5 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 2A per min from 0A to 120A and 1A/10s from 120A to (450-550A)


Thursday, September 23, 2021, 07:09 

IGP1 = 1.84 e-06 Torr

Start Autoramp to 120A @ 2A/min 


Thursday, September 23, 2021, 10:25

Start Autoramp to 550A @ 1A/10s

 IGP1= 1.05e-05 Torr

TGHT= 120 A, 1.06 V


Thursday, September 23, 2021, 11:57 

Pressure drop observed at 530A.  Start 4 hour count.  


Thursday, September 23, 2021, 15:57 

IGP1= 9.1e-06 Torr

After 4 hour reduction started rampdown to 400A at 2A/30s.

8 hour conditioning to start at 16:15 pm


Friday, September 24, 2021, 00:16

TGHT= 399.8 A, 3.5V

IGP1= 2.4 e-06 Torr 

Start ramp down at 2A/min


 

  279   Wednesday, April 13, 2022, 10:55 Luca EgoritiUC2 P2N-SISDoneP2N carbothermal reduction P2Ncartridge-220323

Wednesday, April 13, 2022, 10:50

P2NC-220323

Preparing the P2N-UCx for online operation on June 2022

Two cartridges were filled with annular UO2/C foils last week.

48 cartridges total

Today, Darwin and I are placing one of the two cartridges in the EVAP1. The cartridge is P2NC-220323.

 


Thursday, April 14, 2022, 09:34

Carbothermal reduction heating process started with a ramp rate of 3 A/min

Pressure 1.8E-6T

 


Thursday, April 14, 2022, 10:31

Paused autoramp because pressure increasing too rapidly. Will continue ramp up once pressure stabilizes.

 


Thursday, April 14, 2022, 11:20

autoramp restarted @3A/min

IGP1=2.7E-4 Torr

 


Thursday, April 14, 2022, 13:24

After first major outgass finished and pressure trending down, increased autoramp to 5A/min to 600A


Thursday, April 14, 2022, 13:27

IGP1 = 3.3E-4A

TGHT = 600A, 2.5V

decrease ramp rate to 3A/min to 650A


Thursday, April 14, 2022, 13:45

Set autoramp to 670A


Thursday, April 14, 2022, 13:52

paused autoramp at 668A because pressure increase too steep. 

Changed ramp rate to 0.5A/min and restarted ramp up to 700A


Thursday, April 14, 2022, 15:20

Continued increase in current towards 700A while pressure decrease indicated completeness of reduction.

Started rampdown to 650A.

Pressure was 1.7E-4 Torr on IGP1


Friday, April 15, 2022, 06:28  

The current was reduced to 500A @ 3:50 PM yestesterday.

Currently, TGHT = 500A, 2.0V

started aurtoramp down @ -2A/min

IGP1= 2.4E-6 Torr

 


Monday, May 02, 2022, 12:32

Cartridge reloaded onto EVAP 1. Will heat back up to check carbothermal reduction. 


Tuesday, May 03, 2022, 08:40

IGP1= 1.32e-6 Torr

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/10s to 500A

Autoramped up to 750A @ 1A/10s.  Only slight pressure increases observed areound 150A and 650A to 700 A.  Parameter curves will be evaluated.


Tuesday, May 03, 2022, 11:11

Started rampdown at -1A/10s. 

IGP1 was 3.0e-5 Torr and trending down when rampdown started

 

 

  280   Wednesday, May 04, 2022, 09:47 Luca EgoritiUC2 P2N-SISDoneP2N carbothermal reduction P2NC220408

 Wednesday, May 04, 2022, 09:42

Yesterday, a second graphite cartridge was installed in EVAP1, it consists of the old, 3-body cartridge design, and was sanded on the outside to be able to fit a P2N container. 

 

 


First I tried ramping manually, but the heating tripped because pressure was too high.

Then the parameters were set as previously, but it tripped again

IGP1= 2e-5 Torr

Good vacuum 8e-2 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/10s to 500A

Autoramped up to 700A @ 1A/10s. 

 

Wednesday, May 04, 2022, 11:40

Another ramping trial, with different heating rate:

IGP1= 3e-5 Torr

Good vacuum 8e-2 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/20s to 700A

Autoramped up to 700A @ 1A/20s.  

 

Wednesday, May 04, 2022, 15:50

IGP1= 3e-2 Torr

Good vacuum 8e-2 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/20s to 730A

Autoramped up to 720A @ 1A/20s.  

Pressure dropping while current is increasing at autoramp rate.

 

Wednesday, May 04, 2022, 16:10

From 730A, once the pressure went down to ~1E-3T, the current was suddenly raised to 750A and 770A to see if significant pressure increase was noticed, but small bumps reaching 1.5E-3T were not considered a sign of further reduction.

The rampdown started from a pressure ~1E-3T, from 770A to zero with rate 2A/10s 

 

 

 

  281   Wednesday, June 01, 2022, 08:42 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction Provisional ID C211209-1

Wednesday, June 01, 2022, 08:39

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)

IGP1 = 1.6 e-6 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 40A then continue to 80A at 1A/10s.  Then at 1A/min to 120 A and allow degas and then autoramp 1A/10s from 120A to (450-550A)

 


Wednesday, June 01, 2022, 09:51

IGP1= 3.0e-4 Torr

TGHT = 120A, 1.0V

Start autoramp at 1A/10s to 420A


Wednesday, June 01, 2022, 10:02

Increased ramp rate to 3A/10 s as per SOP to 440 A then will slow down the ramp to observe pressure behavior.


Wednesday, June 01, 2022, 10:19

At 430 A, autoramp set to 1A/10s to 500A as pressure was increasing. 

Will observe behavior of pressure curve then leave for 4 hours


Wednesday, June 01, 2022, 11:04

Pressure started dropping at 520A.  Stopped ramping and will leave for 4 hours.


Wednesday, June 01, 2022, 14:48

Autoramp to 400 A at 2A/30s and leave for 8 hour treatment


Wednesday, June 01, 2022, 23:00

IGP1= 2.1e-6 Torr

TGHT= 400A

Ramping down @-2A/min to 0A


Thursday, June 02, 2022, 10:09

IGP1= 6.7e-7 Torr

Ready to dismount

  282   Friday, June 03, 2022, 06:21 Darwin Ortiz RosalesUO2/C42218-4LP-IG-LISDoneUCx#39 reduction

Friday, June 03, 2022, 06:24

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)

IGP1 = 1.4 e-6 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A  to 80A at 1A/10s.  Then at 1A/min to 120 A, allow degas and then autoramp 1A/10s from 120A to (450-550A)


Friday, June 03, 2022, 06:52

starting autoramp at 1A/min to 120A


Friday, June 03, 2022, 07:30

note*: At approximately 108A the pressure did not rise again but was stable.


Friday, June 03, 2022, 07:46

started autoramp at 1A/10s to 450A 


Friday, June 03, 2022, 09:29

start autoramp to 500A at 1A/min


Friday, June 03, 2022, 09:40

pressure keeps stable as ramping continues. 

increased ramp rate to 2A/min


Friday, June 03, 2022, 09:56

Drop in pressure observed as current increased at 2A/min.

Final current is 490A.  Will keep at this current for 4 hours. 


Friday, June 03, 2022, 14:05

Start auroramp to 400A at -2A/30s

will keep at 400A for 8 hours


Friday, June 03, 2022, 22:06

Start autoramp down at -2A/min to 0A

IGP1= 1.6e-06 Torr

TGHT= 400A, 3.6 V

  283   Tuesday, June 07, 2022, 07:09 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction ID C220510-1

Tuesday, June 07, 2022, 07:05

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)

IGP1 = 1.2 e-6 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 80A at 1A/10s.  Then at 1A/min to 120 A and allow degas and then autoramp 1A/10s from 120A to (450-550A)


Tuesday, June 07, 2022, 08:28

IGP1=9.8e-5 Torr

TGHT = 120A, 0.85V

Start autoramp at 1A/10s to 420A


Tuesday, June 07, 2022, 08:45

Increased ramp rate to 3A/10 s as per SOP to 450 A then will slow down the ramp to observe pressure behavior.


Tuesday, June 07, 2022, 09:04

slowed autoramp to 2A/min to observe (1A/30s)

some erratic pressure oscillations observed then stabilized. 


Tuesday, June 07, 2022, 09:32

At TGHT = 495A pressure started dropping even while current ramping up.  Stopped ramp.  Will keep for 4 hours.

TGHT = 495.6A, 4.7V


Tuesday, June 07, 2022, 13:30

TGHT = 495.6 A, 4.7V

IGP1= 8.5 e-6 Torr

Start rampdown to 400A at 2A/30s and leave for 8 hour treatment

 

  284   Friday, October 07, 2022, 08:14 Darwin Ortiz RosalesUO2/C LP-SISDoneC-220928UCx conditioning experiments

Friday, October 07, 2022, 07:55

Cartridge-220928UCx was installed in the EVAP1 and pumped down yesterday.

Material will be reduced in LP-SIS wrapped with 3 Ta foils.

IGP1 = 2.1e-6 Torr

a cap was installed to collect material coming out from the ionizer tube

The initial weight of the cap 1 + small bag was recorded to be: 2.82 g   Final weight of cap1 + small bag = 2.84g (see attached picture)

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

Power desired 1900W as approximate power used online. 

Will autoramp @2A/min to 30A, then slow down ramp to 1A/min to 120A.

After first pressure bump cleared, will ramp up to 400 A @ 2A/20s to 425A on TGHT.  TBHT will be topped off at 230A. 

from 425A, TGHT will be ramped at 1A/min and monitored for pressure behaeviour. 

sytem will be left at reduction current for 4 hours.  Then, the current will be dropped to 1900W and allow to run for 8 hours.

The cup will be collected and the system will be run again in increments of two hours. 

*slight change from test plan to save time*

 


Friday, October 07, 2022, 21:55

A true pressure max was not observed.  A max while current still rising.  stopped at 560A on TGHT and 5.3V

will leave at the above conditions for 4 hours.

Suspect that the thinner Ta shields make a difference.  Suggest to add a fourth shield and process the previous cartridge in a tube rather than a boat.  Treat for four hours (pressure max) and then test increasing the current to see if there is a pressure bump.  If no pressure bump then lower current to deposit 1900W for 8 additional hours. 

 


After 4 hours at max current, the current was dropped to 450A (TGHT) and left for 8 hours.

 


Saturday, October 08, 2022, 09:26

start autoramp down @-2A/min for TGHT and -1A/min for TBHT

Cap+ bag = 2.82 g

final cap +bag = 2.84 g


Tuesday, October 11, 2022, 10:15

Today will switch end-cup.  Will weigh new end-cup and place inside the evap1 glovebox.  Then will remove used end-cap and install new end-cap.  Used end-cup will be weighed on same balance as before.  All mass measurements will be done with the same balance. Note, that a makeshift balance air isolation container was built to allow balance to not be affected by air currents.

 Cap 2+bag initial weight = 2.80 g +/- 0.01 g

Cap 2+bag final weight = 2.81g +/- 0.01 g

No visible deposition on cap


Wednesday, October 12, 2022, 07:51

 

Start ramp up at 2A/min.  TGHT to 450A, TBHT to 230A

IGP1= 6.7e-07Torr


Wednesday, October 12, 2022, 09:47

Ramping up @ 4A/min to same final settings: TGHT = 450A and TBHT = 230A

 


Wednesday, October 12, 2022, 11:15

@10:45am 450A, 4.15V were reached on TGHT

Will leave for 2 hours at 450A then ramp down, then switch cap. 


Monday, October 17, 2022, 09:40

The second cap was taken out over the weekend  (attachment number 2).

The final weight of this cap with bag = 2.81 +/- 0.01 g

Installed a nex cap (3) with initial weigh of cap +bag = 2.74 g

Allowed vacuum to settle over Sunday and will start ramping today

Will ramp to 470 A and hold for 2 hours.  Ramp rate  2A /30s

IGP1= 4.6e-07 Torr


 Monday, October 17, 2022, 11:39

ramping with no issues.  will finish ramp around 12:03 pm and will start rampdown @ around 2:05 pm.

 


Monday, October 17, 2022, 12:03

TGHT= 470A, 4.5V

TBHT= 228A, 2.9V

IGP1= 5.6e-06 Torr


Monday, October 17, 2022, 14:05

Start rampdown at 2A/min TGHT and 1A/min TBHT to zero amp

current IGP1= 2.6e-06 Torr

TGHT = 470A, 4.5V

TBHT= 228.3A, 2.9V

 


Tuesday, October 18, 2022, 09:39

IGP1=4.4e-7 Torr

ready to dismount


Tuesday, October 18, 2022, 13:50

Cap 3 + bag initial weight = 2.74 g

Final weight of cap+bag = 2.74 g (no change)

no visible deposition on cap either

Attachment 1: Cap_1_221011.png
Cap_1_221011.png
Attachment 2: Cap_2.png
Cap_2.png
Attachment 3: cap3.png
cap3.png
  285   Wednesday, October 19, 2022, 12:28 Darwin Ortiz RosalesUC240253-5LP TUBEDoneC-220510 further conditioning

Wednesday, October 19, 2022, 10:27

Cartridge-220510Cx was installed in the EVAP1 and pumped down yesterday.

Material will be further conditioned at 450A for 4 hours.

The material will be conditioned inside a container tube with both ends open at the ends.  Two springs are inserted at the ends of the graphite cartridge to contain the material as graphite caps not inserted.

IGP1 = 7.8e-07 Torr

 

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

 

Will autoramp @2A/30s (4A/min) to 40 A and then to 120A.  Fast ramp rate because material had previously been conditioned


 

Wednesday, October 19, 2022, 12:23

TGHT 450A, 5.2 V

Will leave for 4 hours and then begin ramp-down.


Wednesday, October 19, 2022, 16:21

IGP1= 3.1e-06Torr

450A, 5.2V

Start rampdown @- 2A/min


Thursday, October 20, 2022, 09:23

IGP1= 4.6e-7 Torr

 

  286   Monday, November 28, 2022, 05:59 Darwin Ortiz RosalesUO2/C LP-SISDoneC221125experiment

Monday, November 28, 2022, 05:58

Left weekend to pump down

current IGPI= 7.23e-7 Torr

 

Material will be reduced in LP-SIS wrapped with 3 Ta foils.

a cap was installed to collect material coming out from the ionizer tube

Initial weight of target material plus cartridge was recorded

All relevant data and findings will be reported and added to docushare as document :

 

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

Power desired 1900W as approximate power used online. 

Will autoramp @2A/min to 30A, then slow down ramp to 1A/min to 120A.

After first pressure bump cleared, will ramp up to 400 A @ 2A/20s to 425A on TGHT.  TBHT will be topped off at 230A. 

from 425A, TGHT will be ramped at 1A/min and monitored for pressure behaeviour. 

sytem will be left at reduction current for 4 hours.  Then, the current will be dropped to 425 A and allow to run for 8 hours.

The cup will be collected and the system will be run again for two hours. at the same current until no material visible on cap.  Then it will be run at 450A for increments of two hours until no significant mass change of target material.

 


Monday, November 28, 2022, 06:05

started initial heating to 30A at 2A/min on both TGHT and TBHT.


Monday, November 28, 2022, 08:46

was ramping at 6A/min (2A/20s) on both tGHT and TBHT but aborted due to pressure spike.  will allow pressure to stabilize.

TGHT = 162A, 1.35V

TBH 162A, 1.9V


Monday, November 28, 2022, 08:51

Restarting the heating at 6A/min (2A/20s)


Monday, November 28, 2022, 09:21

Pausing heating @ TGHT= 323 A 3.0V

Allow pressure to stabilize to better spot reduction current


Monday, November 28, 2022, 09:49

Started heating TGHT at 2A/min so reduction current can be better resolved


Monday, November 28, 2022, 10:12

heating aborted to allow pressure to stabilize

IGP1> 5.0e-4 Torr


Monday, November 28, 2022, 11:31

IGP1= 1.5e-4 Torr start autoramp TGHT @1A/min


Monday, November 28, 2022, 11:51

paused heating.  Second peak has been passed.  Will let pressure drop before starting heating again to try and better observe reduction peak.


Monday, November 28, 2022, 12:46

start autoramp at 2A/min from 389A on TGHT

IGP1- 6.4e-6 Torr


Monday, November 28, 2022, 14:21

Pressure starts to drop at around 535A, but large bump observed around 386A. 

Will leave four hours. 

TGHT= 539A, 4.98V

TBHT= 229A, 2.9V

 


Monday, November 28, 2022, 18:19

Ramping down at 4A/min to 425A

Currently IGP1= 6.2e-6 Torr

TGHT = 539A, 4.98 V

TBHT= 230A, 2.98V

 


Monday, November 28, 2022, 22:23

425 A on TGHT reached at 6:50 pm.  Will ramp down at 2:50 am .  -2A/min TGHT and -1A/min TBHT


Tuesday, November 29, 2022, 09:34

Final IGP1 when TGHT and TBHT = 0A  is 5.0e-7 Torr


Tuesday, November 29, 2022, 14:08

Weighed materials and reloaded

Currently at 1.1 e-05 Torr

Will initiate heat ramp at 2A/min to 425 A

@241A increase ramp rate to 4A/min on TGHT


Wednesday, November 30, 2022, 12:44

heating B finished and cartridge loading for heating C

Current pressure = 2.09 E-05 Torr.  Will ramp up to 450A at 4A/min and regulate as needed.

Will heat at 450A TGHT for 2 hours, TBHT max= 230A


Wednesday, November 30, 2022, 16:30

Starting rampdown @-2A/min TGHT and -1A/min TBHT

Final heating was @ 450A, 4.0V TGHT and 230A, 2.7V TBHT

 


Friday, December 02, 2022, 09:00

IGP1= 7.2 e-07 Torr

Starting ramp at 2A/min to 450A on TGHT and 230A on TBHT

 


Friday, December 02, 2022, 10:02

pressure stated dropping.  Will increase ramp to 4A/min (2A/30s)


Friday, December 02, 2022, 15:35

Starting ramp down at -2A/min TGHT and -1A/min TBHT

IGP1= 2.6 e-06 Torr

TGHT 450A   4.2V

TBHT  230A  2.9V

 

Attachment 1: Data_summary.png
Data_summary.png
  287   Monday, December 19, 2022, 10:45 Darwin Ortiz RosalesUO2/C LP TUBEDoneC-221207 Reduction

Monday, December 19, 2022, 10:38

Cartridge with 175 discs (including 5 analysis discs) loaded into a graphite cartridge. 

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields

Will keep at reducing current for 4 hours and then 10 hours @ 425A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure was 6.36 e-07 Torr

Autoramped to 56A @ 1A/30s

Outgassing bump observed starting at 50A and at 56A the maximum pressure was ~1.9e-05 Torr


Monday, December 19, 2022, 10:47

started autoramping at 1A/30s to 90A


Monday, December 19, 2022, 10:50

observed that pressure not increasing radically, therefore ramping up faster.  2A/30s


Monday, December 19, 2022, 10:58

Second pressure bump observed at 90A, 1.0V

leaving at this current until pressure drops


Monday, December 19, 2022, 17:15

ramped to 280A and left at 280 until pressure started dropping

ramping again to 500A @ 2A/30s

 


Monday, December 19, 2022, 17:26

Stopped at 330A due to pressure hike.  Will allow pressure to drop then continue ramp.


Monday, December 19, 2022, 18:00

restarting ramp @ 2A/30s


Monday, December 19, 2022, 18:11

Pressure started dropping around 350A corresponding to additive gas-off.  Will rampt to 500A @ 2A/30 seconds and then at 1A/30s to 530A


Final current was 548A, 6.7 V.  Will test increasing current after 4 hours (11 pm)


Monday, December 19, 2022, 23:10

ramping down @ 2A/min to 425A .  should be done by 12:00 am and cooling at9:00 am (includes 1 hour ramp down to 425).


Ramping down to zero @ -2A/min


Wednesday, December 21, 2022, 10:47

Final IGP1= 3.7e-07 Torr

  288   Thursday, January 19, 2023, 10:02 Darwin Ortiz RosalesUO2/C LP TUBEDoneC230105 Reduction

Thursday, January 19, 2023, 09:57

Cartridge #8 loaded with 198 discs

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields.

Reduction for 4 hours and then 10 hours @ 425A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure is 1.41e-06 Torr


Thursday, January 19, 2023, 10:02 Auto ramping to 120A @ 1A/min

 


Thursday, January 19, 2023, 18:58

Autoramping to  300A @ 4/min (2A/30s)

IGP1=3.34e-06 Torr

 


Friday, January 20, 2023, 07:37

left at 300 A for 8 hours and pressure dropped.  Restarted autoramp at 2A/30s and pressure was increasing until 425A where it peaked.  Reduced autoramp to 1A/min and observed slow but definite pressure drop.  Will go to 450A and leave there for 4 hours. 

Currently 440A, 5.3V on TGHT and 1.28e-05 Torr on IGP1


Friday, January 20, 2023, 12:06

After 4 hours at 450A IGP1= 3.49e-06 Torr

TGHT = 450A 5.4V

Will drop to 425A and leave for 10 hours

 


Friday, January 20, 2023, 21:53

TGHT 425A, 5.2V

IGP1= 1.81e-06 Torr

autoramping to 0 A @ -2A/min