Entry  Friday, November 01, 2013, 13:08, Anders Mjos, , , , Maintenance, Gloves, window and window gasket replaced. 
Work covered under work permit 2013-11-01-3 and performed by Anders
and Rick with the help of Danno (RPG).
No significant contamination was found during the work. The old window could be disposed as normal waste.
Entry  Monday, December 02, 2013, 16:09, Anders Mjos, , , , Problems resolved, TGHT connector repositioned and tightened Evap1_rotated_TGHT_conductor_2013-12-02.pdf
The right connector for the TGHT had rotated. It has now been repositioned and both connectors have been tightened to reduce the chance for further rotation.
Entry  Monday, December 02, 2013, 16:10, Anders Mjos, , , , Done, Copper bar on TGHT Current_and_Voltage.pdf
The conductivity of the TGHT circuit will be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: Pumping down. 
Tuesday, December 03, 2013, 09:40: Stepped current up to 600A. Impedance of system ~0.7 mOhm. See attached graph for P(I).
Entry  Tuesday, March 04, 2014, 15:48, John Wong, , , TARGET BOAT, In progress, Re-sinterring end caps 
Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously sinterred in Evap#2 but some surfaces were not fully sinterred. (See Evaporator2 E-log ID119: https://elog.triumf.ca/TIS/Evaporator_2/119)
The endcaps are inserted in a target boat wrapped with 3 heat-shields. 
    Reply  Wednesday, March 05, 2014, 10:30, Laura Lambert, , , TARGET BOAT, In progress, Re-sinterring end caps 


    
        
            John Wong wrote:
        
        
            
            Tuesday, March 04, 2014, 15:43
    Reply  Wednesday, March 05, 2014, 23:05, John Wong, , , TARGET BOAT, Done, Re-sinterring end caps endcaps_Mar3_2014.PNG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Thursday, December 11, 2014, 10:17, Laura Lambert, , , , Maintenance, water supply shut off for lab closure over holidays 
 Thursday, December 11, 2014, 10:16
water valve shut off for lab closure over the holidays.

 
Entry  Friday, January 23, 2015, 15:02, Laura Lambert, , , , Maintenance, water supply turned back on to EVAP1 and fume hoods 
 Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1 and fume hoods

 
Entry  Tuesday, April 21, 2015, 11:28, Laura Lambert, , , , Maintenance, Ion Gauge replaced March 23rd 2015 
 
Entry  Saturday, August 29, 2015, 16:12, Anders Mjos, , , , Problems, Restarting vacuum after power outage 
Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10: Starting turbo
Saturday, August 29, 2015, 16:12: Turbo running. IG1 at 2.4E-4 T
Entry  Monday, May 16, 2016, 15:52, Laura Lambert, , , , , Full clean of EVAP1 
 Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.

 
Entry  Tuesday, August 23, 2016, 17:35, John Wong, , , TARGET BOAT, , Sintering TaC coated target boat  
Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed) and wrapped with Ta-heat shield. 
chamber is currently being pumped down. Vac currently at 3.3e-5Torr. 
Entry  Monday, September 12, 2016, 17:41, John Wong, , , TARGET BOAT, In progress, RUSH. Sintering end-caps  
Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long Ta-wire in spring sharp  were coated with TaC coating and wrapped in a small sheet of graphite foil. 
Container is then wrapped with a sheet of Ta heat shield.
    Reply  Tuesday, September 20, 2016, 10:49, Laura Lambert, , , TARGET BOAT, Done, RUSH. Sintering end-caps  Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg


    
        
            John Wong wrote:
        
        
            
            Monday, September 12, 2016, 17:30
Entry  Tuesday, December 20, 2016, 15:03, Laura Lambert, , , , Maintenance, RETURN and SUPPLY valves CLOSED for xmas break 
 
Entry  Wednesday, May 24, 2017, 09:34, Laura Lambert, , , , Maintenance, VACUUM TRIP OFF SETPOINT CHANGED 
 Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point was changed to 8e-4 Torr when previously it was set to 8e-5 Torr.
Vacuum limits were set to stop at 5e-5 Torr and back-off at 6e-5 Torr
Entry  Wednesday, June 07, 2017, 12:48, Aaron Schmidt, , , , , Turbo pump cooling 
 Wednesday, June 07, 2017, 10:00-12:00: Cooling was split/routed from two bottom lines with tees and run to the turbo pump.
 
Entry  Thursday, July 13, 2017, 12:49, Laura Lambert, , , , Problems, *hot lab is HOT* Capture.JPG
Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every day this week and went up to 28C today! 
    Reply  Thursday, July 27, 2017, 09:08, Laura Lambert, , , , Problems resolved, *hot lab is HOT* 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, July 13, 2017, 12:48
Entry  Thursday, September 07, 2017, 14:26, Aaron Schmidt, , , , Maintenance, roughing pump oil replaced 
 Thursday, September 07, 2017, 11:00 -12:00
The roughing pump was disconnected from Evaporator 1, along with the exhaust/ventilation. No contamination was found on swipes.
The oil was refilled.