153
|
Wednesday, June 07, 2017, 12:48 |
Aaron Schmidt | | | | | Turbo pump cooling | Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump. |
|
156
|
Thursday, July 13, 2017, 12:49 |
Laura Lambert | | | | Problems | *hot lab is HOT* | Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! |
|
163
|
Thursday, July 27, 2017, 09:08 |
Laura Lambert | | | | Problems resolved | *hot lab is HOT* |
|
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected |
|
166
|
Wednesday, September 20, 2017, 08:07 |
Aaron Schmidt | | | | Maintenance | Ion gauge & RP status | Wednesday, September 20, 2017, 08:00:
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old |
|
167
|
Thursday, September 21, 2017, 11:35 |
Laura Lambert | Empty | | | Done | Testing TBHT [1st run!], RP [new oil] and IG [new gauge] | Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied. |
|
170
|
Tuesday, November 07, 2017, 11:57 |
Laura Lambert | | | | Maintenance | Interlocks limits changed to 100mTorr | Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray |
|
171
|
Tuesday, November 07, 2017, 12:04 |
Laura Lambert | | | | Maintenance | Noise levels checked - ear protection not required. | Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry. |
|
172
|
Tuesday, November 07, 2017, 14:38 |
Laura Lambert | Empty | | LP-FEBIAD | Done | TBHT test with LP-FEBIAD | Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for |
|
174
|
Wednesday, November 22, 2017, 14:20 |
Laura Lambert | | | | Maintenance | New eye wash for hot lab! | Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout. |
|
177
|
Friday, January 12, 2018, 07:46 |
Laura Lambert | UO2/C | | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#4 |
|
|
194
|
Wednesday, February 28, 2018, 15:21 |
Laura Lambert | Empty | | TARGET BOAT | Done | Testing TGHT to induce trip | Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1
have tripped off the TGHT in epics within |
|
212
|
Tuesday, June 26, 2018, 12:12 |
Aaron Schmidt | | | | Problems resolved | Gloves replaced. | Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out.
The original right one was otrn. |
|
213
|
Thursday, July 05, 2018, 13:43 |
John Wong | UC2 | | HP-FEBIAD-CTL | Done | Conditioning UCx#23 | Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with |
|
214
|
Wednesday, July 11, 2018, 17:44 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_21 | Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab) |
|
215
|
Friday, August 03, 2018, 17:49 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#24 | Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. |
|
219
|
Saturday, September 29, 2018, 19:04 |
John Wong | UO2/C | | TARGET BOAT | In progress | Processing UC2_flk_22 | Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process
sheet for details) |
|
221
|
Thursday, October 11, 2018, 18:13 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#25 | Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. |
|
223
|
Tuesday, October 23, 2018, 10:24 |
Marla Cervantes | UC2 | | LP-SIS | Problems | Conditioning UCx#25 |
|
|
224
|
Tuesday, October 23, 2018, 10:49 |
Marla Cervantes | UC2 | | LP-SIS | Problems resolved | Conditioning UCx#25 |
|
|
|