Entry  Wednesday, June 07, 2017, 12:48, Aaron Schmidt, , , , , Turbo pump cooling 
 Wednesday, June 07, 2017, 10:00-12:00: Cooling was split/routed from two bottom lines with tees and run to the turbo pump.
 
Entry  Thursday, July 13, 2017, 12:49, Laura Lambert, , , , Problems, *hot lab is HOT* Capture.JPG
Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every day this week and went up to 28C today! 
    Reply  Thursday, July 27, 2017, 09:08, Laura Lambert, , , , Problems resolved, *hot lab is HOT* 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, July 13, 2017, 12:48
Entry  Thursday, September 07, 2017, 14:26, Aaron Schmidt, , , , Maintenance, roughing pump oil replaced 
 Thursday, September 07, 2017, 11:00 -12:00
The roughing pump was disconnected from Evaporator 1, along with the exhaust/ventilation. No contamination was found on swipes.
The oil was refilled.
Entry  Wednesday, September 20, 2017, 08:07, Aaron Schmidt, , , , Maintenance, Ion gauge & RP status 
Wednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday afternoon and the old one removed. The old IG was found to be contaminated (300 cpm) and as of 20/09/2017,
it is double bagged and stashed underneath the evaporator for the time being. 
Entry  Thursday, September 21, 2017, 11:35, Laura Lambert, Empty, , , Done, Testing TBHT [1st run!], RP [new oil] and IG [new gauge] 
 Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to allow current to be applied.
Started pumping down this a.m.
Entry  Tuesday, November 07, 2017, 11:57, Laura Lambert, , , , Maintenance, Interlocks limits changed to 100mTorr 
 Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed to 100mTorr for both TGHT and TBHT by Ray

 
Entry  Tuesday, November 07, 2017, 12:04, Laura Lambert, , , , Maintenance, Noise levels checked - ear protection not required. 
 Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor by Terry.
Max readings in lab reached ~83dB but sat between 70-78dB in most areas.
Entry  Tuesday, November 07, 2017, 14:38, Laura Lambert, Empty, , LP-FEBIAD, Done, TBHT test with LP-FEBIAD evap1_data.xlsx
 Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago for temperature measurements is used for this test.
3xTa heat shields on container, incl center block - these heat shields have remained on there since the last round of tests in 2014?
Entry  Wednesday, November 22, 2017, 14:20, Laura Lambert, , , , Maintenance, New eye wash for hot lab! 
 Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple attachment on sink spout.
Easy to use, simply twist attachment 180 degrees.
    Reply  Friday, January 12, 2018, 07:46, Laura Lambert, UO2/C, , TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#4 


    
        
            Marla Cervantes wrote:
        
        
            
             Wednesday, January 10, 2018, 14:44
Entry  Wednesday, February 28, 2018, 15:21, Laura Lambert, Empty, , TARGET BOAT, Done, Testing TGHT to induce trip 
 Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1 have tripped off the TGHT in epics within minutes of the target reaching 520A.
Loaded an empty target boat, no heat shields.
Entry  Tuesday, June 26, 2018, 12:12, Aaron Schmidt, , , , Problems resolved, Gloves replaced. 
 Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out. 
The original right one was otrn. Left was o but worn. Both replaced with new gloves.
Entry  Thursday, July 05, 2018, 13:43, John Wong, UC2, , HP-FEBIAD-CTL, Done, Conditioning UCx#23 
Thursday, July 05, 2018, 13:24
Target container was previously coated and sintered with TaC, also wrapped with Ta heat shields (see Evap2 elog# 410).
Loaded 201 discs of UCx with 7.27 cm in length + 5 extra discs for QC samples. 
Entry  Wednesday, July 11, 2018, 17:44, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_21 
Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note in Hotlab)
Target boat contained about 50g UO2 powder. 
Entry  Friday, August 03, 2018, 17:49, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#24 
Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs, total packing length of 7.1cm. 
Container was previously coated/sintered with TaC (see elog #415) in Evap#2 with TGHT set to 450A/7.5V and TBHT 230A/4.2
Entry  Saturday, September 29, 2018, 19:04, John Wong, UO2/C, , TARGET BOAT, In progress, Processing UC2_flk_22 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG
Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process sheet for details)
Target boat contains about 50g UO2 powder. 
Entry  Thursday, October 11, 2018, 18:13, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#25 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm. 
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the
    Reply  Tuesday, October 23, 2018, 10:24, Marla Cervantes, UC2, , LP-SIS, Problems, Conditioning UCx#25 


    
        
            John Wong wrote:
        
        
            
            Thursday, October 11, 2018, 18:06
    Reply  Tuesday, October 23, 2018, 10:49, Marla Cervantes, UC2, , LP-SIS, Problems resolved, Conditioning UCx#25 


    
        
            Marla Cervantes wrote:
        
        
            
            
            