  285   Wednesday, October 19, 2022, 12:28 Darwin Ortiz RosalesUC240253-5LP TUBEDoneC-220510 further conditioningWednesday, October 19, 2022, 10:27
Cartridge-220510Cx was installed
  
  287   Monday, December 19, 2022, 10:45 Darwin Ortiz RosalesUO2/C LP TUBEDoneC-221207 ReductionMonday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite
  
  288   Thursday, January 19, 2023, 10:02 Darwin Ortiz RosalesUO2/C LP TUBEDoneC230105 ReductionThursday, January 19, 2023, 09:57
Cartridge #8 loaded with 198 discs
To be reduced inside a Ta container
  
  289   Wednesday, March 22, 2023, 22:29 Darwin Ortiz RosalesUO2/C LP TUBEDone230316 ReductionWednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus
3 analysi discs
  
  290   Wednesday, October 11, 2023, 10:06 Darwin Ortiz RosalesUO2/C LP TUBEDoneTUCx-231005 reduction & conditioningWednesday, October 11, 2023, 9:36
Cartridge #10 loaded with 213 plus
3 analysi discs
  
  291   Tuesday, April 09, 2024, 14:43 Darwin Ortiz RosalesUO2 LP TUBEDoneUCx240408 reduction Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus
3 analysi discs
  
  292   Thursday, September 12, 2024, 06:23 Darwin Ortiz RosalesUO2/C LP TUBEDoneUCx240904 reduction
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs
including 5 analysis discs
  
  293   Tuesday, September 17, 2024, 06:49 Darwin Ortiz RosalesUO2/C LP TUBEDoneUCx240916 reductionTuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs
plus 3 analysis discs
  
  294   Thursday, September 19, 2024, 22:48 Darwin Ortiz RosalesUO2/Cconditioning oven#3LP TUBEDoneUCx240917 reductionThursday, September 19, 2024, 22:44
 
Cartridge #21 loaded with 211 discs
  
  295   Tuesday, January 14, 2025, 16:28 Darwin Ortiz RosalesUO2/Cconditioning oven#3LP TUBEIn progressUCx250113 reductionTuesday, January 14, 2025, 16:26
 
Cartridge #22 loaded with 211 discs
  
  18   Monday, May 09, 2011, 16:10 John WongEmpty38817-1HP-SISDoneDiffusion bonding of Ta FinsMon May  9 16:09:35 2011:  Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down.
 TGHT_ramping_up.gifoverall_process.jpg 
  19   Tuesday, May 10, 2011, 14:58 John WongEmpty38817-2HP-SISDoneDiffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) Tue May 10 14:56:05 2011:  Target
is wrapped with 3 heat-shields.  The
evaporator is pumping down, vac @ 4.72e-6
 starting_process.jpgoverall_process.gif 
  46   Thursday, April 05, 2012, 16:47 John WongEmpty38817-3HP-SISDoneCoating target oven /w TaC & sinteringThursday, April 05, 2012, 16:43
Target oven is coated with TaC. 
The oven is wrapped with 3 Ta-heat shields.
 Targetoven_TaCsintered_archive.JPG 
  47   Tuesday, May 08, 2012, 07:42 John WongSiC38817-3HP-SISDoneSintering SiCTuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils.
 TGHT_0_270A.pngSiC#27_0-820A.JPG 
  213   Thursday, July 05, 2018, 13:43 John WongUC2 HP-FEBIAD-CTLDoneConditioning UCx#23Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  4   Monday, March 28, 2011, 12:29 John WongEmpty38481-8HP-FEBIADDoneFins diffusion bonding March 28, 2011
12:28:  Target oven is wrapped
with 3 Ta-heat shields.  Pumping down
 grab.Kxr912.pnggrab.L10194.png 
  7   Tuesday, April 05, 2011, 10:37 John WongEmpty38481-6HP-FEBIADDoneFins diffusion bonding Tue Apr  5 10:36:53 2011:  Target
oven is wrapped with 3 Ta-heat shields. 
The evaporator is in the process of pumping
 pumping_down.jpgheatingup.jpgcooling_down.jpg 
  8   Wednesday, April 06, 2011, 17:07 John WongEmpty37978-1HP-FEBIADDoneFins diffusion bonding Wed Apr  6 17:06:56 2011: Target oven is
wrapped with 3 Ta-heat shields.  Pumping
down evaporator in progress.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  9   Friday, April 08, 2011, 14:55 John WongEmpty38295-8HP-FEBIADDoneFins diffusion bonding Fri Apr  8 14:51:37 2011:  Target
is wrapped with 3 Ta-heat shields. 
The evaporator has been pumped down for over
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 