Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 5 of 15  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  215   Friday, August 03, 2018, 17:49 John WongUC2 LP-SISIn progressConditioning UCx#24Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. 
  
  214   Wednesday, July 11, 2018, 17:44 John WongUO2/C TARGET BOATDoneProcessing UC2Flk_21Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab)
  
  213   Thursday, July 05, 2018, 13:43 John WongUC2 HP-FEBIAD-CTLDoneConditioning UCx#23Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with
  
  212   Tuesday, June 26, 2018, 12:12 Aaron Schmidt   Problems resolvedGloves replaced. Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out. 
The original right one was otrn.
  
  211   Tuesday, June 19, 2018, 15:39 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #15 Friday, June 15, 2018, 16:39
35 circles of 14 mm
  
  210   Wednesday, June 13, 2018, 12:25 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14

    

       
            
  
  209   Wednesday, June 13, 2018, 11:09 Marla CervantesUO2/C40282-1TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14

    

       
            
  
  208   Wednesday, June 13, 2018, 10:20 Marla CervantesUO2/C40282-1TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14 Tuesday, June 12, 2018, 18:20
35 circles of 14 mm
  
  207   Monday, June 04, 2018, 11:29 Marla CervantesUC240282-1TARGET BOATDoneConditioning B13 and 2sc Friday, June 01, 2018, 11:20
Target boat was previously coated
  
  206   Friday, May 25, 2018, 15:38 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing full length 1-step UCx target #2Friday,
May 25, 2018, 15:34 
  
  205   Friday, May 18, 2018, 18:38 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #13 Friday, May 18, 2018, 18:32
35 circles of 14 mm diameter
 180519-B13-Current_trip_off.JPG 
  204   Friday, May 11, 2018, 12:36 Marla CervantesUC241369-2LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1 Thursday, May 10, 2018, 16:00 
Graphite insert fully loaded
 180511-FL1_520A.png 
  203   Tuesday, April 17, 2018, 12:45 Laura LambertUO2/C40282-2TARGET BOATDoneProcessing UC2Flk_20 Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April
  
  202   Tuesday, April 10, 2018, 14:49 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing first full length 1step UCx target

    

       
            
  
  201   Monday, April 09, 2018, 16:53 Laura LambertUO2/C40282-2TARGET BOATProblems resolvedCarbonizing first full length 1step UCx target

    

       
            
  
  200   Monday, April 09, 2018, 16:51 Laura LambertUO2/C40282-2TARGET BOATProblemsCarbonizing first full length 1step UCx target

    

       
            
 evap1_trip.JPGevap1_trip_archive.JPG 
  199   Wednesday, March 28, 2018, 11:46 Laura LambertUO2/C40282-2TARGET BOATIn progressCarbonizing first full length 1step UCx target Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from
  
  198   Tuesday, March 20, 2018, 14:52 Laura LambertUC242218-13LP-SISDoneConditioning UCx#22 Tuesday, March 20, 2018, 14:43
Target container was previously
  
  197   Monday, March 12, 2018, 11:14 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 Monday, March 12, 2018, 9:13
35 circles from cast#2 of 14
  
  196   Friday, March 02, 2018, 16:35 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11

    

       
            
  
ELOG V2.9.2-2455