Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287, Page 3 of 4  ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  17   Sat May 7 17:29:13 2011 JB  Window leak tests on TUDAAttached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison
 window2-leaktest.png 
  18   Wed May 11 17:59:12 2011 JB  Re-entrant flange alignmentAlignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
  
  19   Thu May 12 03:04:44 2011 Tom Davinson  Re: Re-entrant flange alignment> Alignments checks revealed that downstream
end of
> TUDA was ~1mm off (can't remember which
  
  20   Sun May 15 13:07:12 2011 JB  W detector V-I curveYork W detector 2635-19
1037um
 W_detector_V-I_curve.png 
  21   Mon May 16 21:14:19 2011 Jamie Brown  Broken solder on PD2As you can see...  PD2-broken_solder.png 
  22   Tue May 17 12:32:13 2011 Jamie Brown  Thick carbon targetThe thick carbon target, to be used for
background runs for the thick CH2 measurement
was supplied by Marek.
  
  23   Wed May 18 08:54:08 2011 Alex Murphy  Photodiode data from target thickness measurements In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.
 pdruns.xls 
  24   Wed May 18 08:58:53 2011 Alex Murphy  Foil energy lossesI've analysed
data from runs 4 to 12, which were the alpha
  
  25   Wed May 18 09:09:02 2011 Alison Laird  Status update Wednesday morning:
4 new windows were tested last night.
2 very good.
  
  26   Fri May 20 05:47:08 2011 Tom Davinson  3.25MeV/u 21Ne(5+)   22.grab.y17428.png 
  27   Sat May 21 18:25:36 2011 Jamie Brown  Beam spot   DSC05470.JPG 
  28   Sun May 22 11:45:03 2011 Tom Davinson  4.11MeV/u 21Ne(5+)   30.grab.h25527.png 
  30   Mon May 23 02:16:32 2011 Jamie Brown  End of run summaryPlan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating
  
  35   Tue May 24 01:47:17 2011 Anonymous  Shift schedule, as of 1am Tuesday 24th   Screenshot.png 
  42   Wed May 25 22:45:42 2011 Jamie Brown  Leakage current in S2-1At approximately 7pm, noted that trigger
rate in S2-1 had dropped by factor of ~20.
Detector had tripped off due to leakage current
  
  45   Thu May 26 12:53:48 2011 Jamie Brown  H2 fill and vent proceduresPlease note that these procedures are not
perfect and other small operations not listed
may need to be carried out. Some mistakes
 H2_filling_procedure.pdfH2_venting_procedure.pdf 
  48   Fri May 27 14:24:00 2011 Tom Davinson  S1287 data transfer
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
  
  51   Sat May 28 10:07:44 2011 Jamie Brown, and Mike Bentley  Plan for last day1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done
  
  52   Mon Jun 20 05:58:21 2011 Jamie Brown  Run logAttached is a spreadsheet summarizing all
the run information from the experiment.
 run_log.xls 
  53   Tue Jun 21 02:58:31 2011 Jamie Brown  Run Books 13 and 14Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept.
 tuda_book13_1-47.pdftuda_book13_48-95.pdftuda_book13_96-143.pdftuda_book13_144-191.pdftuda_book14.pdf 
ELOG V2.9.2-2455