ID Date Author Typedown Category Subject Text Attachments
  57   Fri Nov 16 07:12:32 2012 Jessica TomlinsonOtherGeneral4.11 MeV/u analysisI have sorted the 4.11MeV/u data runs (the
ones which had the common stop mode on the
TDCs) and applied the following cuts:
 6x 
  58   Fri Nov 16 07:23:26 2012 Jessica TomlinsonOtherGeneralS2-1 plot that would fit on previous elog Attachment 1 shows S2-1 energy vs
time with a gate on energy in S2-2 being
greater than 9MeV i.e. See previous elog
 S2-1-evst-9mevcut.001.png 
  59   Tue Dec 4 05:40:10 2012 Jessica TomlinsonOtherOtheranalysis - single strip E vs t  I have attached some single strip
energy vs time plots to show that the structure
seen in the collective E vs t plots is in
 6x 
  60   Fri Jan 11 06:56:01 2013 Jessica TomlinsonOtherGeneralmultiplicities, hit patterns and good hits in an eventI have attached a pdf of a series of slides
with some multiplicity and hit pattern plots
on, also a list of cuts. As well as this
 411mev-multiplicities-and-hitpat.pdf 
  61   Fri Jan 11 09:48:58 2013 Tom DavinsonOtherGeneralRe: multiplicities, hit patterns and good hits in an event
  
  2   Sat Apr 9 11:35:14 2011 Tom Davinson  TUDA configuration & setup
Nominal detector configuration for S1287
is as follows:
 GasTUDA-7.png 
  3   Sat Apr 9 14:57:30 2011 Tom Davinson  MIDAS DAQ configuration
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
 11x 
  4   Mon Apr 11 14:57:08 2011 Tom Davinson  SEBT1 & HERACLES wipe tests
Work permit (2011-4-11-3) was requested to
vent SEBT1 upstream of TUDA chamber
  
  5   Mon Apr 11 18:39:17 2011 Tom Davinson  Monday 11 April
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
 2.png3.png4.png 
  6   Tue Apr 12 11:21:38 2011 Tom Davinson  Tuesday 12 April The TUDA @ ISAC-II grounding test was successfully
completed this am
per work permit 2011-04-12-2.
 1.png 
  7   Wed Apr 13 03:43:42 2011 Jamie  Ni window leak tests 12um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
 Screenshot.pngScreenshot-1.png 
  8   Wed Apr 13 03:55:21 2011 Jamie  Safety Reportattached
 
note. s2 position in fig. 1 is wrong,
 S1287-Revised_Safety_Report.pdfrevised.pdf 
  9   Wed Apr 13 09:37:51 2011 Tom Davinson  Wednesday 13 April
09.20 TUDA2.PNG5 1.04E-06Torr
      See attachments 1 & 2 for EPICS log
 3.png2.png4.png 
  10   Thu Apr 14 10:06:34 2011 Tom Davinson  Thursday 14 April
10.02 See attachment 1 for overnight EPICS
log of TUDA2.CG5
 1.png5.png 
  11   Fri Apr 15 11:00:17 2011 Tom Davinson  Friday 15 April11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
      Downstream flange *not* secured by
 2.png6.png 
  12   Sat Apr 16 09:31:56 2011 Tom Davinson  Saturday 16 AprilContinuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
  
  13   Sun Apr 17 09:47:04 2011 Tom Davinson  Sunday 17 AprilContinuation of yesterday's test with c. 300mBar
of He
in the TUDA chamber.
 He_test.png 
  14   Thu May 5 11:31:13 2011 JB  Tom's ToDo List 

  
  15   Fri May 6 06:03:00 2011 Tom Davinson  Sort programs, spectra titles & calibration procedureA summary of online sort programs can be found
at:
  
  16   Fri May 6 15:08:00 2011 JB  New TUDA EPICS layout   gas_handling-3.png 