Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287, Page 3 of 4  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Type Category Subject Text Attachments
  52   Mon Jun 20 05:58:21 2011 Jamie Brown  Run logAttached is a spreadsheet summarizing all
the run information from the experiment.
 run_log.xls 
  53   Tue Jun 21 02:58:31 2011 Jamie Brown  Run Books 13 and 14Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept.
 tuda_book13_1-47.pdftuda_book13_48-95.pdftuda_book13_96-143.pdftuda_book13_144-191.pdftuda_book14.pdf 
  7   Wed Apr 13 03:43:42 2011 Jamie  Ni window leak tests 12um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
 Screenshot.pngScreenshot-1.png 
  8   Wed Apr 13 03:55:21 2011 Jamie  Safety Reportattached
 
note. s2 position in fig. 1 is wrong,
 S1287-Revised_Safety_Report.pdfrevised.pdf 
  14   Thu May 5 11:31:13 2011 JB  Tom's ToDo List 

  
  16   Fri May 6 15:08:00 2011 JB  New TUDA EPICS layout   gas_handling-3.png 
  17   Sat May 7 17:29:13 2011 JB  Window leak tests on TUDAAttached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison
 window2-leaktest.png 
  18   Wed May 11 17:59:12 2011 JB  Re-entrant flange alignmentAlignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
  
  20   Sun May 15 13:07:12 2011 JB  W detector V-I curveYork W detector 2635-19
1037um
 W_detector_V-I_curve.png 
  43   Thu May 26 00:15:18 2011 Hicham and SarahRoutine End of run summarystill running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge
  
  44   Thu May 26 02:54:10 2011 Derek and NaomiRoutineGeneralThu 0-8am shift summary 
For run 123:
Beam outage for ~15 min but not stopping
  
  47   Thu May 26 23:57:34 2011 DerekRoutineGeneralFriday 00:00 - 08:00 SummarySarah informed me that Jamie was performing
the sorting and saving of spectra differently
and didn't know what exactly to do so I will
  
  29   Mon May 23 02:12:14 2011 BrianRoutine Start of Run summaryHandover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+)
  
  39   Wed May 25 03:15:44 2011 BrianRoutineGeneralStart of run summary and TDC problemsSummary at start of run
Read through the runbook and end
of run summar and the situation appears to
  
  40   Wed May 25 07:09:17 2011 BrianRoutineGeneralEnd of run summary (yes, a bit early, but done all I can think of!)Running status
Everything seems to be running OK. 
ADC and TDC spectra look OK.  Chamber
  
  35   Tue May 24 01:47:17 2011 Anonymous  Shift schedule, as of 1am Tuesday 24th   Screenshot.png 
  62   Wed Feb 4 17:27:55 2015 Anonymous   This is reachable and change-able via outside
Internet
  
  25   Wed May 18 09:09:02 2011 Alison Laird  Status update Wednesday morning:
4 new windows were tested last night.
2 very good.
  
  49   Fri May 27 23:13:01 2011 Alex RojasRoutineGeneralShift summaryNo major problems presented, A pluser walk
was performed at the begining of the shift
run161 S2-1 front, run162 S2-2 front, run163
  
  23   Wed May 18 08:54:08 2011 Alex Murphy  Photodiode data from target thickness measurements In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.
 pdruns.xls 
ELOG V2.9.2-2455