|
ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
|
5
|
Mon Apr 11 18:39:17 2011 |
Tom Davinson | | | Monday 11 April |
TUDA was successfully re-installed on SEBT1
by LB, TD, AML and PM.
|
|
|
3
|
Sat Apr 9 14:57:30 2011 |
Tom Davinson | | | MIDAS DAQ configuration |
tuda2 (by TUDA chamber, SEBT1) was powered
off on arrival
|
11x |
|
42
|
Wed May 25 22:45:42 2011 |
Jamie Brown | | | Leakage current in S2-1 | At approximately 7pm, noted that trigger
rate in S2-1 had dropped by factor of ~20.
Detector had tripped off due to leakage current |
|
|
45
|
Thu May 26 12:53:48 2011 |
Jamie Brown | | | H2 fill and vent procedures | Please note that these procedures are not
perfect and other small operations not listed
may need to be carried out. Some mistakes |
|
|
11
|
Fri Apr 15 11:00:17 2011 |
Tom Davinson | | | Friday 15 April | 11.15 See attachment 1 for overnight EPICS
log of TUDA2.CG5
Downstream flange *not* secured by |
|
|
47
|
Thu May 26 23:57:34 2011 |
Derek | Routine | General | Friday 00:00 - 08:00 Summary | Sarah informed me that Jamie was performing
the sorting and saving of spectra differently
and didn't know what exactly to do so I will |
|
|
24
|
Wed May 18 08:58:53 2011 |
Alex Murphy | | | Foil energy losses | I've analysed
data from runs 4 to 12, which were the alpha |
|
|
31
|
Mon May 23 09:59:23 2011 |
Mike Bentley | Routine | General | End/Dtart of Run Summary (BRF/MAB) | Ran all night OK, currently 14epA, H2 stable,
DAQ stable
ISSUES: |
|
|
40
|
Wed May 25 07:09:17 2011 |
Brian | Routine | General | End of run summary (yes, a bit early, but done all I can think of!) | Running status
Everything seems to be running OK.
ADC and TDC spectra look OK. Chamber |
|
|
30
|
Mon May 23 02:16:32 2011 |
Jamie Brown | | | End of run summary | Plan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating |
|
|
43
|
Thu May 26 00:15:18 2011 |
Hicham and Sarah | Routine | | End of run summary | still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge |
|
|
32
|
Mon May 23 15:58:30 2011 |
Mike Bentley | Routine | General | End of Shift summary | OK - summary of events during this
shift.
|
|
|
21
|
Mon May 16 21:14:19 2011 |
Jamie Brown | | | Broken solder on PD2 | As you can see... |
|
|
27
|
Sat May 21 18:25:36 2011 |
Jamie Brown | | | Beam spot | |
|
|
54
|
Wed Jul 18 08:29:03 2012 |
Jessica Tomlinson | Other | General | Analysis update | Energy calibration for S2-2 was done
using the pulser data (set 6 of the pulser
runs) to calculate the offsets and alpha |
|
|
55
|
Mon Sep 24 07:16:18 2012 |
Jessica Tomlinson | Other | Other | Analysis update | Energy vs Time plots
I updated |
|
|
28
|
Sun May 22 11:45:03 2011 |
Tom Davinson | | | 4.11MeV/u 21Ne(5+) | |
|
|
57
|
Fri Nov 16 07:12:32 2012 |
Jessica Tomlinson | Other | General | 4.11 MeV/u analysis | I have sorted the 4.11MeV/u data runs (the
ones which had the common stop mode on the
TDCs) and applied the following cuts: |
6x |
|
26
|
Fri May 20 05:47:08 2011 |
Tom Davinson | | | 3.25MeV/u 21Ne(5+) | |
|
|
50
|
Sat May 28 07:46:09 2011 |
Lars Martin | Routine | General | | Beam current dropped to 85 epA at the start
of the shift, operator checked for reasons
and decided to change
|
|