S1287, Page 3 of 4
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
61 Entries
Goto page
Previous
1
,
2
, 3,
4
Next
All
ID
Date
Author
Type
Category
Subject
Text
52
Mon Jun 20 05:58:21 2011
Jamie Brown
Run log
Attached is a spreadsheet summarizing all
the run information from the experiment.
53
Tue Jun 21 02:58:31 2011
Jamie Brown
Run Books 13 and 14
Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept.
7
Wed Apr 13 03:43:42 2011
Jamie
Ni window leak tests 1
2um x 8 mm Ni windows leaked tested on
TUDA gas cell. With window placed on the
outside of the cell, cell was evacuated and
8
Wed Apr 13 03:55:21 2011
Jamie
Safety Report
attached
note. s2 position in fig. 1 is wrong,
14
Thu May 5 11:31:13 2011
JB
Tom's ToDo List
16
Fri May 6 15:08:00 2011
JB
New TUDA EPICS layout
17
Sat May 7 17:29:13 2011
JB
Window leak tests on TUDA
Attached plot shows rate of pressure increase
in ~2l volume upstream of TUDA with Ni window
#2 installed on reentrant flange. Comparison
18
Wed May 11 17:59:12 2011
JB
Re-entrant flange alignment
Alignments checks revealed that downstream
end of TUDA was ~1mm off (can't remember
which way).
20
Sun May 15 13:07:12 2011
JB
W detector V-I curve
York W detector 2635-19
1037um
43
Thu May 26 00:15:18 2011
Hicham and Sarah
Routine
End of run summary
still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge
44
Thu May 26 02:54:10 2011
Derek and Naomi
Routine
General
Thu 0-8am shift summary
For run 123:
Beam outage for ~15 min but not stopping
47
Thu May 26 23:57:34 2011
Derek
Routine
General
Friday 00:00 - 08:00 Summary
Sarah informed me that Jamie was performing
the sorting and saving of spectra differently
and didn't know what exactly to do so I will
29
Mon May 23 02:12:14 2011
Brian
Routine
Start of Run summary
Handover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+)
39
Wed May 25 03:15:44 2011
Brian
Routine
General
Start of run summary and TDC problems
Summary at start of run
Read through the runbook and end
of run summar and the situation appears to
40
Wed May 25 07:09:17 2011
Brian
Routine
General
End of run summary (yes, a bit early, but done all I can think of!)
Running status
Everything seems to be running OK.
ADC and TDC spectra look OK. Chamber
35
Tue May 24 01:47:17 2011
Anonymous
Shift schedule, as of 1am Tuesday 24th
62
Wed Feb 4 17:27:55 2015
Anonymous
This is reachable and change-able via outside
Internet
25
Wed May 18 09:09:02 2011
Alison Laird
Status update
Wednesday morning:
4 new windows were tested last night.
2 very good.
49
Fri May 27 23:13:01 2011
Alex Rojas
Routine
General
Shift summary
No major problems presented, A pluser walk
was performed at the begining of the shift
run161 S2-1 front, run162 S2-2 front, run163
23
Wed May 18 08:54:08 2011
Alex Murphy
Photodiode data from target thickness measurements
In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.