Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1203  ELOG logo
  ID Date Author Type Category Subject Text Attachments
  15   Thu Jul 7 19:43:43 2011 Hicham  s1203 logbook   s1203Logbook.PDF 
  14   Fri Jun 10 08:24:45 2011 Derek and SarahRoutineGeneralDay Shift summary Friday08:20 Beam back and running agains
Rate: 2200
Lost proton beam at 9:41
  
  13   Fri Jun 10 07:13:58 2011 Greg Tomney  Shift Overview for 00 - 8:00 June 10Beamrate (scintillator) - 0
Accepted Trigger - 0
Trigger - 3
  
  12   Thu Jun 9 15:47:41 2011 Derek, SambuuRoutineGeneralDay shift summay ThursdayNo troubles
Beamrate: 1600
Trigger Rate: 9
  
  11   Wed Jun 8 09:09:31 2011 Alex RojasRoutineGeneralBeam maintenanceBeam interrupted at 8am for maintenance
scheduled.
Beam back at 10am.
  
  10   Wed Jun 8 07:05:12 2011 David CrossRoutineGeneralShift report 00:00 - 08:00Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
  
  9   Tue Jun 7 23:39:08 2011 Greg and Sambuu  Shift Overview for 16-22:00 June 7Beamrate (scintillator) - 2592 
Accepted Trigger - 7
Trigger - 7
  
  8   Tue Jun 7 16:17:17 2011 Julian  11Li spectroscopy June 7th - 8am-4pm shiftAt 9:30am the beam was given to the controll
room in between 2 runs.
At ~10am the beam tripped--> restarted
  
  7   Tue Jun 7 07:48:52 2011 Andrew ValencikRoutineGeneralOwl Shift June 7 - DTL Tripping issues
0:02 Run 328 started
1:33 Run 328 stopped so ISAC control
could run tests and take measurements
  
  6   Mon Jun 6 22:47:35 2011 Hicham  11Li beam, yehhhhhhhhhhhhhhhhhhh ! 
Persons on shift : Ritu, Nigel, Alex,
Sambuu & Hicham
  
  5   Sun Jun 5 23:44:54 2011 Andrew ValencikOtherGeneralADC Assignment SummaryΔE LEDA Detector
ΔE0 ADC1
 ADC_Assignment_2011.pdf 
  4   Sun Jun 5 17:57:52 2011 Andrew ValencikRoutineGeneralREADME for MIDAS DAQ 
README.MIDAS

 
 README.MIDAS 
  3   Sun Jun 5 17:02:53 2011 RituOtherGeneralS1203 startup Saturday (June 4)
22Ne (8+) was tuned through TUDA
@ ~ 110 enA checking on the
  
  2   Sat May 28 21:16:45 2011 Hicham  Mounting S2+LEDA preamps- Chamber stripped out after S1287
- Mounting premaps for S2 + 3xLEDA
  
  1   Sat May 28 19:18:11 2011 HichamRoutineGeneralproposal, safety report, and other documentssee attached  S1203_200812S_merged.pdfS1203_201105_Safety.pdfs1203_safety_report.odt 
ELOG V2.9.2-2455