0:02 Run 328 started
1:33 Run 328 stopped so ISAC control could run tests and take measurements
1:36 Run 329 starts. Beam drops at 2:30am. Stop runat 2:36. "DTL tank 1 tripped off" -ISAC Summary
2:40 Run 330 starts. DTC Tank 1 trips again, lost beam for about 6min
3:23-3:49 no beam
3:49 beam returns, start run 331, beam only lasts for 3 minutes
No beam…
5:14 beam returns. Start run332 continues for 2 hours
7:15 new run started. Leakage currents measured, all normal.
Beam issues were caused by a waterflow problem in the DTL tanks, more details available on the ISAC Operations Logbook for June 7
|