Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
General notes:
- Striptool would freeze for ~5-10 minutes at a time sporadically throughout the shift
- One proton beam dropout at about 3:30 AM, did not stop run as they came back quickly.
Special note:
- Ops called and said Protons are going away at 07:00 for a maintenance period. Earliest anticipated return of
beam is at 09:00
- I will initiate a background run after this elog entry, that will be run #349 and I have asked Ops to put a
Faraday Cup in so as not to put beam into a background run if it comes back early. So just ask them to take the
cup out when they say 11Li is ready to come back.
- UPDATE: Ritu has said not to worry about any background. #349 has been stopped and no data is being taken. |