Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1203  ELOG logo
Message ID: 8     Entry time: Tue Jun 7 16:17:17 2011
Author: Julian 
Type:  
Category:  
Subject: 11Li spectroscopy June 7th - 8am-4pm shift 

At 9:30am the beam was given to the controll room in between 2 runs.

At ~10am the beam tripped--> restarted and data was coming in, but SC8 showed nothing --> DAQ was restarted from the control room --> problem solved

Beam was off and on occasionally between 10:15 and 2, but fairly consistent thereafter.

 

ELOG V2.9.2-2455