Sat May 28 19:18:11 2011, Hicham, Routine, General, proposal, safety report, and other documents
|
see attached |
Sun Jun 5 17:02:53 2011, Ritu, Other, General, S1203 startup
|
Saturday (June 4)
22Ne (8+) was tuned through TUDA @ ~ 110 enA checking on the
Faraday Cup. |
Sun Jun 5 17:57:52 2011, Andrew Valencik, Routine, General, README for MIDAS DAQ
|
README.MIDAS
Shutting Down MIDAS DAQ
-----------------------
|
Sun Jun 5 23:44:54 2011, Andrew Valencik, Other, General, ADC Assignment Summary
|
ΔE LEDA Detector
ΔE0 ADC1 0 - 15
ΔE1 ADC1 16 - 31
ΔE2 |
Tue Jun 7 07:48:52 2011, Andrew Valencik, Routine, General, Owl Shift June 7 - DTL Tripping issues
|
0:02 Run 328 started
1:33 Run 328 stopped so ISAC control could run tests and take measurements
1:36 Run 329 starts. Beam drops at 2:30am. Stop runat 2:36. "DTL tank 1 tripped off" -ISAC Summary |
Wed Jun 8 07:05:12 2011, David Cross, Routine, General, Shift report 00:00 - 08:00
|
Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
|
Wed Jun 8 09:09:31 2011, Alex Rojas, Routine, General, Beam maintenance
|
Beam interrupted at 8am for maintenance scheduled.
Beam back at 10am. |
Thu Jun 9 15:47:41 2011, Derek, Sambuu, Routine, General, Day shift summay Thursday
|
No troubles
Beamrate: 1600
Trigger Rate: 9 |
Fri Jun 10 08:24:45 2011, Derek and Sarah, Routine, General, Day Shift summary Friday
|
08:20 Beam back and running agains
Rate: 2200
Lost proton beam at 9:41 |
Sat May 28 21:16:45 2011, Hicham, , , Mounting S2+LEDA preamps
|
- Chamber stripped out after S1287
- Mounting premaps for S2 + 3xLEDA |
Mon Jun 6 22:47:35 2011, Hicham, , , 11Li beam, yehhhhhhhhhhhhhhhhhhh !
|
Persons on shift : Ritu, Nigel, Alex, Sambuu & Hicham
Finally, we got our first 11Li beam around of 1800 pps for 4.77 MeV/u @ 21h55. |
Tue Jun 7 16:17:17 2011, Julian, , , 11Li spectroscopy June 7th - 8am-4pm shift
|
At 9:30am the beam was given to the controll room in between 2 runs.
At ~10am the beam tripped--> restarted and data was coming in, but SC8 showed nothing --> DAQ was restarted from the control room -->
problem solved |
Tue Jun 7 23:39:08 2011, Greg and Sambuu, , , Shift Overview for 16-22:00 June 7
|
Beamrate (scintillator) - 2592
Accepted Trigger - 7
Trigger - 7 |
Fri Jun 10 07:13:58 2011, Greg Tomney, , , Shift Overview for 00 - 8:00 June 10
|
Beamrate (scintillator) - 0
Accepted Trigger - 0
Trigger - 3 |
Thu Jul 7 19:43:43 2011, Hicham, , , s1203 logbook
|
|