695
|
Thursday, November 08, 2018, 10:54 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Silver bolts used on Coil, TGHT, &
TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: |
|
|
700
|
Wednesday, December 12, 2018, 13:22 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Anode leak current check. | Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20: |
|
|
701
|
Monday, December 17, 2018, 12:03 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Anode leak current check. | Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed. |
|
|
702
|
Thursday, December 20, 2018, 13:55 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Holiday shut down. | High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power. |
|
|
703
|
Tuesday, January 08, 2019, 08:11 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS restart | Tuesday, January 08, 2019, 08:00: Epics
white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: |
|
|
716
|
Friday, April 05, 2019, 07:02 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS operation test - LP FEBIAD | Due to previous issues, a full run / test
should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA |
|
|
724
|
Saturday, May 25, 2019, 12:43 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | Installed TM4 Source Tray | Silver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings |
|
|
725
|
Tuesday, May 28, 2019, 15:05 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | TM4 Source Tray - Episode II | SEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos |
|
|
726
|
Monday, June 03, 2019, 11:35 |
Aaron Schmidt | | LP-SIS | | TM4 | 395530-3 | 42752-5 | Problems/Solutions | TGHT PS Failed. | Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to 50 kV. Multiple
sparks. Optics tripped, wire scanners & |
|
|
727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is |
|
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD. |
|
|
796
|
Monday, June 22, 2020, 07:07 |
Aaron Schmidt | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | Test FEBIAD (Fernando) | Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing. |
|
|
797
|
Thursday, June 25, 2020, 08:57 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 1/3 | Reminder. Mini
pump still linked to SV1. DO NOT OPEN SV2!!! |
|
|
808
|
Tuesday, August 18, 2020, 12:07 |
Aaron Schmidt | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | RP check & Mass magnet check. | Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10:
RP1 off |
|
|
812
|
Thursday, September 03, 2020, 11:28 |
Aaron Schmidt | - | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | Leak check 2.0 | Out Gas & MB1 check (Or leak check
2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 |
|
|
815
|
Tuesday, October 13, 2020, 12:34 |
Aaron Schmidt | | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | MB1 Check. | He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing. |
|
|
863
|
Wednesday, March 10, 2021, 14:57 |
Aaron Schmidt | | HP-FEBIAD | | | | 42752-5 | In progress | Emittance meter test with FEBIAD | Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57:
BV1A open. |
|
|
916
|
Tuesday, April 05, 2022, 14:01 |
Aaron Schmidt | Test FEBIAD TM2-2022 | LP-FEBIAD | ITW | TM2 | | 42752-5 | | Test FEBIAD & TS operation | Tuesday, April 05, 2022, 13:57: Roughing.
BV1B.
Tuesday, April 05, 2022, 14:04: BV1A |
|
|
917
|
Thursday, April 07, 2022, 11:19 |
Aaron Schmidt | Test FEBIAD TM2-2022 | | ITW | TM2 | | 42752-5 | | Test FEBAID & TS operation | Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: |
|
|
683
|
Friday, August 31, 2018, 12:27 |
Aaron Schmidt | nSiC#1 | LP-SIS | ITW | TM2 | 43044-1 | 42752-4 | In progress | Conditioning nSiC#1 | Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started. |