  695   Thursday, November 08, 2018, 10:54 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTest FEBIAD w/ Silver bolts & sealed end capsSilver bolts used on Coil, TGHT, &
TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52:
  
  700   Wednesday, December 12, 2018, 13:22 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressAnode leak current check.Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20:
  
  701   Monday, December 17, 2018, 12:03 Aaron Schmidt LP-FEBIAD  395530-342752-5 Anode leak current check.Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed.
  
  702   Thursday, December 20, 2018, 13:55 Aaron Schmidt LP-FEBIAD  395530-342752-5 Holiday shut down.High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power.
  
  703   Tuesday, January 08, 2019, 08:11 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS restart Tuesday, January 08, 2019, 08:00: Epics
white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10:
  
  716   Friday, April 05, 2019, 07:02 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS operation test - LP FEBIADDue to previous issues, a full run / test
should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA
 TS_-_New_BIAS__EZL_Testing_-_2019.docxTS-2019-04-05-07-00.rga 
  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source TraySilver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings
 TM4_Source_Tray_-_2019_-_Leak_Check.docxTM4_Source_Tray_-_2019.docxTS-2019-05-27-07-08.rga 
  725   Tuesday, May 28, 2019, 15:05 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressTM4 Source Tray - Episode IISEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos
 TM4_Source_Tray_-_2019_-_2.docxTS-2019-05-29-07-08.rgaTM4_Source_Tray_-_2019_-_3_-_HV_-_1.docxTM4_Source_Tray_-_2019_-_4_-_HV_-_2_-_Heat_on.docxTM4_Source_Tray_-_2019_-_5_-_HV_over_50_-Heat_on.docx 
  726   Monday, June 03, 2019, 11:35 Aaron Schmidt LP-SIS TM4395530-342752-5Problems/SolutionsTGHT PS Failed.Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to  50 kV. Multiple
sparks. Optics tripped, wire scanners &
  
  727   Monday, June 03, 2019, 14:13 Aaron Schmidt   TM4395530-342752-5DoneTMS:TP6 Turbo pump issue. (Ok now)Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is
  
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.Tuesday, June 11, 2019, 14:33: Roughing.

Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD.
  
  796   Monday, June 22, 2020, 07:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressTest FEBIAD (Fernando)Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
 FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt 
  797   Thursday, June 25, 2020, 08:57 Fernando MaldonadoTest FEBIADHP-FEBIAD  38295-842752-5DoneFEBIAD development part 1/3 Reminder. Mini
pump still linked to SV1. DO NOT OPEN SV2!!!
  
  808   Tuesday, August 18, 2020, 12:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressRP check & Mass magnet check.Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10:
RP1 off
  
  812   Thursday, September 03, 2020, 11:28 Aaron Schmidt-HP-FEBIAD  38295-842752-5In progressLeak check 2.0Out Gas & MB1 check (Or leak check
2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809
  
  815   Tuesday, October 13, 2020, 12:34 Aaron Schmidt HP-FEBIAD  38295-842752-5In progressMB1 Check.He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing.
 MB1_Check_Oct_-_2020.docx 
  863   Wednesday, March 10, 2021, 14:57 Aaron Schmidt HP-FEBIAD   42752-5In progressEmittance meter test with FEBIADWednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57:
BV1A open.
  
  916   Tuesday, April 05, 2022, 14:01 Aaron SchmidtTest FEBIAD TM2-2022LP-FEBIADITWTM2 42752-5 Test FEBIAD & TS operationTuesday, April 05, 2022, 13:57: Roughing.
BV1B.
Tuesday, April 05, 2022, 14:04: BV1A
 Test_Target_LP-FEBIAD_TM2-2022.docx 
  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25:
  
  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1Friday, August 31, 2018, 12:27: Roughing.