Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed. |
Wednesday, December 12, 2018, 13:22, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Anode leak current check.
|
Wednesday, December 12, 2018, 13:15: Power / Sources on.
Wednesday, December 12, 2018, 13:20: RGA on / set.
Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. |
Monday, December 17, 2018, 12:03, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Anode leak current check.
|
Monday, December 17, 2018, 12:01: Connected Multimeter through feedthroughs J & L. Blue wire removed.
To run TGHT, TBHT, Anode ONLY. HV will remain locked with yellow tape over the keyhole. Currently locked out.
Tuesday, December 18, 2018, 08:37: Power / sources on |
Thursday, December 20, 2018, 13:55, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Holiday shut down.
|
High winds caused a brief power outage that completely shutoff the ISAC test stand.
Locked out the power.
RGA checked & shutoff complete |
Tuesday, January 08, 2019, 08:11, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, TS restart
|
Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on
TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted |
Friday, April 05, 2019, 07:02, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, TS operation test - LP FEBIAD
|
Due to previous issues, a full run / test should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA on.
Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable. |
Saturday, May 25, 2019, 12:43, Aaron Schmidt, Test FEBIAD / TM4, LP-FEBIAD, , TM4, 395530-3, 42752-5, In progress, Installed TM4 Source Tray
|
Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals
on the water blocks.
Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK. |
Tuesday, May 28, 2019, 15:05, Aaron Schmidt, Test FEBIAD / TM4, LP-FEBIAD, , TM4, 395530-3, 42752-5, In progress, TM4 Source Tray - Episode II
|
SEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos on. |
Monday, June 03, 2019, 11:35, Aaron Schmidt, , LP-SIS, , TM4, 395530-3, 42752-5, Problems/Solutions, TGHT PS Failed.
|
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently.
Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive. |
Monday, June 03, 2019, 14:13, Aaron Schmidt, , , , TM4, 395530-3, 42752-5, Done, TMS:TP6 Turbo pump issue. (Ok now)
|
Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off. |
Tuesday, June 11, 2019, 14:33, Aaron Schmidt, Test FEBIAD, LP-FEBIAD, , , 395530-3, 42752-5, In progress, ISAC Source tray re-installed w/ optics tray.
|
Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.
Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing. |
Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando)
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
Monday, June 22, 2020, 09:17: Turbo pumps on. |
Thursday, June 25, 2020, 08:57, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, Done, FEBIAD development part 1/3
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
The plan for today Thursday, June 25, 2020 is:
Optimize (tune) the beam to FC0 and then to FC6.
Compensate |
Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check.
|
Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10: RP1 off
Install Gas Ballast vapour port w/ filter. |
Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0
|
Out Gas & MB1 check (Or leak check 2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks
Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault |
Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check.
|
He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33: Roughing.
Tuesday, October 13, 2020, 13:17: TP1B on. |
Wednesday, March 10, 2021, 14:57, Aaron Schmidt, , HP-FEBIAD, , , , 42752-5, In progress, Emittance meter test with FEBIAD
|
Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57: BV1A open.
Thursday, March 11, 2021, 09:41: TP1B on. |
Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation
|
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on. |
Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation
|
Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing.
Thursday, April 07, 2022, 11:17: TP1B on. |
Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
|
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.
Wednesday, September 05, 2018, 11:03: RGA on. |
|