  305   Friday, May 24, 2013, 15:13 Aurelia LaxdalCLT FEBIAD      CLT FEBIAD conditioning startedPurged the gas lines, turned on the HV
and started the heaters for CLT FEBIAD: TGHT
up to 580A and TBHT up to 230A.
  
  892   Thursday, August 05, 2021, 08:49 Fernando Maldonado      Problems/SolutionsCANBUS snooper set up to investigate random optics turnining offProblem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only
 Annotation_2021-08-06_144737.png20210806_150334.jpg 
  660   Tuesday, May 08, 2018, 10:36 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressC-seal Test2 C-Seals installed with SS springs
on water blocks. The SS springs are also
used in the module.
  
  899   Tuesday, September 14, 2021, 17:12 Aaron SchmidtC#3LP-SISITWTM244691-744378-11In progressC#3 ConditioningTuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on.
 6x 
  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service CapThe ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D
  
  737   Tuesday, June 25, 2019, 17:19 Fernando Maldonado      Problems/SolutionsBurnt cables on top of the test standTuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt
 20190625_154015.jpg20190625_153834.jpg20190625_165001.jpg 
  647   Monday, March 12, 2018, 10:44 Carla Babcock       Bringing up HV with gas onPressure:
Previous HV tests done at 2e-7
pressure.
Current pressure 1.1e-6
 8x 
  741   Tuesday, July 02, 2019, 18:25 Fernando Maldonado      DoneBlank on FEBIAD gas line installed Tuesday, July 02, 2019, 18:24: A
blind is installed  on the FEBIAD gas
line (see attached picture)  to
 20190702_182254.jpg 
  318   Thursday, July 11, 2013, 08:38 Anders Mjos      Problems/SolutionsBias & EL P/S cleanedThe power supplies were "de-dusted"
yesterday by Ray Dube and team. 
  
  1013   Wednesday, July 24, 2024, 14:08 Dave Neilson       Beam line window change - DUV installationWednesday, July 24, 2024, 14:07  
Changed beamline window to DUV window (window
at magnet for target source viewing)
  
  866   Friday, March 26, 2021, 17:04 Carla Babcock       Beam line vented for emittance meter exchangeVented beamline and removed ARIEL emittance
meter. In the process of swapping components,
beamline left vented until Monday when we
  
  810   Tuesday, August 25, 2020, 07:23 Aaron Schmidt      Problems/SolutionsBeam line side vacuum tripTuesday, August 25, 2020, 07:07: Beam line
side of the TS appears to have tripped? Open
BV6 & BV2.
  
  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuatingBacking pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01.
  
  343   Tuesday, November 05, 2013, 15:50 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevatedPressure around 140 mTorr. The pressure
started increasing early November 2nd. Will
continue to monitor.
 Vacuum.png 
  345   Wednesday, November 20, 2013, 08:57 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated 

    
  
  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure highTSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced.
  
  1021   Tuesday, September 10, 2024, 16:24 Dave NeilsonTiC #24DHP-SISITWTM345447-2745235-25 Back up target testing and conditioningTuesday, September 10, 2024, 16:21: 
 Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21:
 2024-09-11_HPTiC-24D_target_characterization.docx 
  657   Friday, April 20, 2018, 13:20 Carla Babcock      DoneBIAS* fan sounds like it is dying The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon.
  
  629   Wednesday, February 07, 2018, 08:46 Aaron Schmidt       BIAS Power supply installationWednesday, February 07, 2018, 08:40: A
75 kV Glassman power supply was installed
in the rack for use in further HV testing.
 BIAS_PS_off_top_switch.jpgBIAS_PS_70kV_rear_bottom.jpgBIAS_PS_70kV_Front_bottom.jpg 
  715   Wednesday, March 27, 2019, 11:01 Aaron Schmidt      Problems/SolutionsBIAS PS replaced. TestWednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback
 NEW_BIAS_PS_testing_-_2019.docx 