305
|
Friday, May 24, 2013, 15:13 |
Aurelia Laxdal | CLT FEBIAD | | | | | | | CLT FEBIAD conditioning started | Purged the gas lines, turned on the HV
and started the heaters for CLT FEBIAD: TGHT
up to 580A and TBHT up to 230A. |
|
892
|
Thursday, August 05, 2021, 08:49 |
Fernando Maldonado | | | | | | | Problems/Solutions | CANBUS snooper set up to investigate random optics turnining off | Problem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only |
|
660
|
Tuesday, May 08, 2018, 10:36 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | C-seal Test | 2 C-Seals installed with SS springs
on water blocks. The SS springs are also
used in the module. |
|
899
|
Tuesday, September 14, 2021, 17:12 |
Aaron Schmidt | C#3 | LP-SIS | ITW | TM2 | 44691-7 | 44378-11 | In progress | C#3 Conditioning | Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on. |
6x |
379
|
Tuesday, May 20, 2014, 11:17 |
Anders Mjos | | | | | | | Problems/Solutions | Burnt off GND connection on Service Cap | The ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D |
|
737
|
Tuesday, June 25, 2019, 17:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Burnt cables on top of the test stand | Tuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt |
|
647
|
Monday, March 12, 2018, 10:44 |
Carla Babcock | | | | | | | | Bringing up HV with gas on | Pressure:
Previous HV tests done at 2e-7
pressure.
Current pressure 1.1e-6 |
8x |
741
|
Tuesday, July 02, 2019, 18:25 |
Fernando Maldonado | | | | | | | Done | Blank on FEBIAD gas line installed | Tuesday, July 02, 2019, 18:24: A
blind is installed on the FEBIAD gas
line (see attached picture) to |
|
318
|
Thursday, July 11, 2013, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Bias & EL P/S cleaned | The power supplies were "de-dusted"
yesterday by Ray Dube and team. |
|
1013
|
Wednesday, July 24, 2024, 14:08 |
Dave Neilson | | | | | | | | Beam line window change - DUV installation | Wednesday, July 24, 2024, 14:07
Changed beamline window to DUV window (window
at magnet for target source viewing) |
|
866
|
Friday, March 26, 2021, 17:04 |
Carla Babcock | | | | | | | | Beam line vented for emittance meter exchange | Vented beamline and removed ARIEL emittance
meter. In the process of swapping components,
beamline left vented until Monday when we |
|
810
|
Tuesday, August 25, 2020, 07:23 |
Aaron Schmidt | | | | | | | Problems/Solutions | Beam line side vacuum trip | Tuesday, August 25, 2020, 07:07: Beam line
side of the TS appears to have tripped? Open
BV6 & BV2. |
|
209
|
Friday, September 21, 2012, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A/B fluctuating | Backing pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01. |
|
343
|
Tuesday, November 05, 2013, 15:50 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A and CG1B elevated | Pressure around 140 mTorr. The pressure
started increasing early November 2nd. Will
continue to monitor. |
|
345
|
Wednesday, November 20, 2013, 08:57 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A and CG1B elevated |
|
|
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced. |
|
1021
|
Tuesday, September 10, 2024, 16:24 |
Dave Neilson | TiC #24D | HP-SIS | ITW | TM3 | 45447-27 | 45235-25 | | Back up target testing and conditioning | Tuesday, September 10, 2024, 16:21:
Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21: |
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon. |
|
629
|
Wednesday, February 07, 2018, 08:46 |
Aaron Schmidt | | | | | | | | BIAS Power supply installation | Wednesday, February 07, 2018, 08:40: A
75 kV Glassman power supply was installed
in the rack for use in further HV testing. |
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback |
|