  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  878   Wednesday, June 09, 2021, 11:51 Aaron Schmidt      Problems/SolutionsTPS:CB2 issue.Tuesday, June 08, 2021, 08:25: IV4 open.
Optics set minus TPS:CB2. Shows  as green
'on', set to 500V, however read back shows
  
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  
  889   Friday, July 30, 2021, 15:34 Carla Babcock      FailedTSG:RP1 failureTP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below
  
  891   Tuesday, August 03, 2021, 11:55 Fernando Maldonado      Problems/SolutionsSwapped emmittance meter voltage cables.After not being able to get beam through
the emittance meter. I diagnosed that the
plates was not biased (reason yet unknow).
  
  892   Thursday, August 05, 2021, 08:49 Fernando Maldonado      Problems/SolutionsCANBUS snooper set up to investigate random optics turnining offProblem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only
 Annotation_2021-08-06_144737.png20210806_150334.jpg 
  893   Saturday, August 07, 2021, 18:07 Fernando Maldonado      Problems/SolutionsFC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself]Saturday, August 07, 2021, 18:02: As mentions
in previous entries, the FC0 current oscillates
with no change on ion source parameters.
  
  894   Monday, August 23, 2021, 09:55 Fernando Maldonado      Problems/SolutionsRP1 changed back Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log
  
  895   Monday, August 23, 2021, 10:49 Aaron Schmidt - Fernando Maldonado      Problems/SolutionsRGA replaced with a blind flangeMonday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  
  897   Tuesday, August 31, 2021, 13:55 Aaron Schmidt       Pump down chamberPump down chamber w/ empty HS   
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & rebootThursday, September 23, 2021, 07:15: Roughing.
Waterline loop installed.

Monday, September 27, 2021,
  
  902   Wednesday, October 06, 2021, 11:56 Aaron Schmidt       Pump down empty chamberWednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021,
09:07: Venting.
  
  904   Wednesday, October 20, 2021, 15:01 Aaron Schmidt       Pump down empty chamberWednesday, October 20, 2021, 15:01: Roughing.   
  905   Thursday, November 04, 2021, 11:55 Fernando Maldonado      DoneOpening vacuum chamber for thesis pictures :pThursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39:
  
  907   Tuesday, November 16, 2021, 13:45 Aaron Schmidt       Pump down empty chamberTuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed.
  
  909   Tuesday, January 04, 2022, 13:00 Aaron Schmidt       Post water leak December 30th, 2021: Water poured
down around Isac test stand and probes lab
  
  910   Wednesday, January 05, 2022, 15:12 Carla Babcock       Modifications to test stand for mass marker testsConnection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket.
  
  911   Wednesday, January 12, 2022, 16:12 Carla Babcock       Ramp up of the mass marker targetWednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A
 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG 