  923   Thursday, May 05, 2022, 14:43 Aaron Schmidt P2N-SIS  45241-145240-1In progressP2N assembly conditioning.

Thursday, May 05, 2022, 14:43: Roughing. Open BV1B

Thursday, May 05, 2022, 14:46: Upper chamber cage closed. The rest remains open. Open BV1A.

Thursday, May 05, 2022, 15:20: TP1B up to speed.

Thursday, May 05, 2022, 15:25; TP1A on.

Thursday, May 05, 2022, 15:32: TP1A to speed. IG1 on.

Thursday, May 05, 2022, 15:33: Vacuum @ 4.72e-05T. FS#5 Open. No spike. ok.

Thursday, May 05, 2022, 15:34: Vacuum steady 4.09e-05T & dropping.

  924   Monday, May 09, 2022, 10:08 Luca Egoriti P2N-SISITETM4  In progressP2N heating test

Beginning of May:

The cabling on the top of the test stand was changed to adapt for P2N testing. The TGHT and COIL PS were disconnected, and their DC cable terminals were connected instead to the TDK-LAMBDA P2Nheaters. The configuration on top of the ITS module is the following:

TBHT+ = A

TBHT- = B

MASTER+ = D

MASTER- = C

SLAVE+ = G/E

SLAVE- = F/H

 

Friday May 6th, afternoon

Once the pressure was almost stable in the low E-6 torr range, the first rampup was conducted up to ~600 A and the I,V parameters looked similar to previous P2N units. More tests to full current happening next week.

 

Monday, May 09, 2022, 09:29

P2N unit is being heated now, the automatic ramping utility is ramping the TDK-LAMBDAs while the TBHT is being increased manually.

Monday, May 09, 2022, 10:31

A voltage event happened, the TBHT voltage increased frmo 0.64 V to 0.73 V, while the P2Nheater dropped from  1.73 V to 1.56 V. 

 

 

Monday, May 09, 2022, 12:19

At P2NHT=950A it was noticed that one leg of the P2N was glowing much more than the other, the ramping was first stopped and then ramped down.

Now the P2NHT=282A and TBHT=47A

 

Tuesday, May 10, 2022, 09:32

Test stand vented and target inspected, there is no obvious sign of damage or misconnection on the tantalum assembly. Some resistance measurements were taken across target elements and connections: 

Screw on copper L to bottom flexy leg L = 117

Bottom flexy leg L to top flexy leg L = 24 / 0 (?)

top flexy leg L to bottom elephant leg L = 64

elephant L to elephant R = 360

top flexy leg R to bottom elephant leg R = 69

Bottom flexy leg R to top flexy leg R = 0 (?)

Screw on copper R to bottom flexy leg R = 125

 

Tuesday, May 10, 2022, 11:39

This morning, the target was inspected but nothing major was noticed, hence it was put back in the ITS for heating.

 

Tuesday, May 10, 2022, 17:40

Target being ramped: so far all good, total current in P2NHT=690A and TBHT=116A

A current measuring clamp was used to measure current in the 4/0 cables. The only bad thing is that the slave outputs half the current than the master, making the cables hotter (30deg vs 24deg).

Currents:

A-B ~116 A (TBHT)

C~468

E~124

G~102

 

Tuesday, May 10, 2022, 17:45

Event: reduction in P2NHT voltage and increase in TBHT voltage. After letting the PS ramp, it was noticed that the P2NHT voltage accelerated its increased, and the left leg started glowing like the previous time. The current was immediately ramped down, but still there was a voltage spike upwards in the P2NHT. 

While the leg was glowing hot, the current between feedthroughs H (P2NHT-) and I (HV common) was 90A. Now that the "episode" is not there any more, the current is zero

 

Wednesday, May 11, 2022, 10:55 

The previous P2N target had stainless steel screws at the bottom, where the copper L-shaped connector and the ta foil legs connect, which might have bene the cause of the gap opening and voltage increase. Now, the target manufactured for the previous beamtime is used, which does not have the cuts on the elephant ears but they are OK since don't interfere with the new IS cup design, and are ~3mm away from it.

 

Wednesday, May 11, 2022, 13:57 

 Start heating the new P2N assembly

Wednesday, May 11, 2022, 14:58

 Stopped at

P2NHT= 501 A

TBHT= 95 A

All currents seem to be flowing in the right path, with no current in the jumper between H-I

 

Wednesday, May 11, 2022, 15:26

Voltage step in P2NHT and TBHT happened again. Current sum:

A = 125 A

B = 125 A

C= 470 A

D=474 A

E = 118 A

F= 85 A

G = 95 A

H = 132 A

Short G-E = 5 A

Short F-H = 3 A

Jumper H-I = 62 A

 

The most likely explanation of this jump is that the IS tip touches the plasma electrode as shown in the drawing below which would result in some current flowing through the jumper, more investigations are needed

 

Thursday, May 12, 2022, 08:19

Test stand opened, there is some sign of burn in the plasma electrode, but it's hard to say if it's because they were touching. Aaron added a tantalum 0.040" shim to the plasma electrode to distance it further from the target IS tube

 

Thursday, May 12, 2022, 13:20

ITS with P2N target installed and pumping down 

 

Thursday, May 12, 2022, 15:50

P2NHT started ramping 

Attachment 1: 2022-05-09_-_Voltage_event_during_rampup.PNG
2022-05-09_-_Voltage_event_during_rampup.PNG
Attachment 2: 2022-05-09_-_Rampup_and_down.PNG
2022-05-09_-_Rampup_and_down.PNG
Attachment 3: IMG_20220509_111314.jpg
IMG_20220509_111314.jpg
Attachment 4: ITS_short_plasma_electrode_schematics.png
ITS_short_plasma_electrode_schematics.png
  925   Tuesday, May 10, 2022, 10:09 Aaron Schmidt P2N-SISITETM445241-145240-1In progressP2N assembly conditioning - 2

 Ref: https://elog.triumf.ca/TIS/Test-Stand/924. During testing, it was noted one leg was glowing vs the other. P2N assembly was removed & inspected. No contact or defects were found.

Tuesday, May 10, 2022, 10:05: Roughing.

Tuesday, May 10, 2022, 10:42: TP1 on.

Tuesday, May 10, 2022, 10:50: TP1A on.

Tuesday, May 10, 2022, 10:58: IG1 on. Vacuum @ 1.77e-05T & dropping.

Tuesday, May 10, 2022, 13:45: Vacuum @ 5.63e-06T. FS#5 Opened.

Tuesday, May 10, 2022, 13:58: Vacuum @ 5.27e-06T.

 

  926   Wednesday, May 11, 2022, 10:05 Aaron Schmidt P2N-SISITETM444812-245240-1 P2N assembly conditioning - 3

Target oven #45241-1 swapped out. SS bolts were in use on the legs.

Molybdenum screws in the legs on oven #44812-2. No target to ion source cup interference. 3mm gap - OK.

TGHT - R: 1.215

TGHT - L: 1.206

TBHT - R: 2.014

TBHT - L: 2.013

Cathode cable detached from feed-through (B).

Wednesday, May 11, 2022, 10:04: Roughing.

Wednesday, May 11, 2022, 10:33: TP1B on.

Wednesday, May 11, 2022, 10:43: TP1A on.

Wednesday, May 11, 2022, 10:51: IG1 on.

Wednesday, May 11, 2022, 13:43: Vacuum @ 5.43e-06T. FS#5 Open.

Wednesday, May 11, 2022, 13:45: Vacuum @ 5.36e-06T. OK.

  927   Thursday, May 12, 2022, 10:50 Aaron Schmidt P2N-SISITETM444812-245240-1In progressP2N assembly conditioning - 4

PE shimmed & extended 1mm due to likely ion source contact.

Thursday, May 12, 2022, 10:41: Roughing.

Thursday, May 12, 2022, 11:26: TP1B on. 

Thursday, May 12, 2022, 11:35: TP1A on.

Thursday, May 12, 2022, 11:43: IG1 on.

Thursday, May 12, 2022, 11:48: Vacuum @ 2.65e-05T. FS#5 Opened. No immediate spike.

Thursday, May 12, 2022, 11:50: Vacuum @ 2.47e-05T & dropping.


Friday, May 13, 2022, 07:32: TP/IG off.

Friday, May 13, 2022, 09:51: Venting.

  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)

A web-app for systematic FEBIAD parametrizations has been develop and  now includes the ISAC Test Stand (ITS) :

https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/

Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of the ITS beamline.

To run a similar scan but on the total source current (FC0) the field has to change from TMS:FC6:SCALECUR to TMS:FC0:SCALECUR.

 

Each measurement will create a unique id (measurement_id), and the data can be retrieved from

https://beta.hla.triumf.ca/jaya/data/get/measure_id

 

Plot and analysis routines for the data generated by the FEBIAD-scan can be found in 

https://jupyter.triumf.ca/hub/login

for which you need a TRCOMP account. The routines are located in the group folder 

/group/ionsrc/fernando

  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamber

Monday, June 20, 2022, 11:49: Water line loop installed. Roughing.


Thursday, June 23, 2022, 09:25: Venting.

  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamber

Thursday, June 30, 2022, 13:46: Roughing.


Thursday, July 07, 2022, 15:00: Venting.

  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assembly

No UCx target installed. Straight / blank oven in use for out gassing.

Thursday, July 07, 2022, 16:50: Roughing.

Thursday, July 07, 2022, 16:53: BV1A Open.

Thursday, July 07, 2022, 17:31: TP1B on.

Thursday, July 07, 2022, 17:36: TP1A on.

Thursday, July 07, 2022, 17:46: IG1 on. Vacuum @ 2.31e-05T

Thursday, July 07, 2022, 17:47: Waterline FS#5 Opened. Vacuum @ 2.05e-05T & continuing down.

Thursday, July 07, 2022, 18:00: Bypass on IG1. 10A TGHT Check. Ok. Back to 0A. Removed bypass. Ready for remote operation.


Friday, July 08, 2022, 10:44: Started autoramping TGHT 580A/TBHT 0A

Friday, July 08, 2022, 15:37: Autoramping complete


Saturday, July 09, 2022, 07:34 : ramp down started


Sunday, July 10, 2022, 22:14: IG1, TP1B & A off. TP6 has tripped. Sources off.  
 

  937   Sunday, July 10, 2022, 22:19 Aaron Schmidt      Problems/SolutionsTP2 Trip / TMS:RP2 issue

 Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.


Monday, July 11, 2022, 06:01: Venting.

Monday, July 11, 2022, 08:12: RP1 off.

Monday, July 11, 2022, 09:01: RP changed. SN#LPA49885

Monday, July 11, 2022, 09:02: Down to 0.032T Fast. TP2 & TP6 on.

Monday, July 11, 2022, 09:08: Pumps up to speed. IG6 on.

  938   Monday, July 11, 2022, 09:17 Aaron Schmidt      In progressPump down empty chamber

Monday, July 11, 2022, 09:15: Roughing.

  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assembly

Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).

Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.

Tuesday, August 30, 2022, 14:00: BV1A open.


Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on. 

Wednesday, August 31, 2022, 07:35: TP1 A on. 

Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.

Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.


Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T. 

Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.

Limit increased on TGHT parameter setup to 5.500e-06T.

Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min. 


Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min. 


Monday, September 26, 2022, 10:52: Turbo pumps off.

Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged.

  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamber

Water loop installed.

Thursday, September 29, 2022, 13:50: Roughing


Tuesday, October 18, 2022, 11:17: Venting

  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changed

genepicsas.triumf.ca

x11 enabled.

Then use login credentials.

 

Wednesday, October 19, 2022, 12:10: Login. Success


Monday, November 07, 2022, 13:13 Use ATTS on putty page.

New ramping program:

Monday, November 07, 2022, 13:15: Auto-ramping TGHT /  TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)

Monday, November 07, 2022, 13:19: Ramping complete:

  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating test

Heated up sample 01 for the second time and measured the temperature with increasing current. Used pyrometre to measure temperature and calibrated it with the emmissivity values from cassidy

  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced

 See elog 944

Wednesday, November 16, 2022, 13:23: TP1 A replaced

Wednesday, November 16, 2022, 13:25: Roughing.

Wednesday, November 16, 2022, 14:53: TP1B on

Wednesday, November 16, 2022, 14:56: TP1B at speed.

Wednesday, November 16, 2022, 14:58: TP1A on.

Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on. Vacuum @ 3.32e-05T

 

 

  947   Wednesday, November 23, 2022, 13:52 Aaron Schmidt     44378-14In progressFEBIAD Coil Tests

Sam G. & Navid N.

Work Permit# C2022-11-23--1

Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)

Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on

Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.

Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.

 Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A

end test


 Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on

Monday, November 28, 2022, 13:17: start collecting data at 8 amps

Monday, November 28, 2022, 16:11: end test


 Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps

Taking measurements of temperature at 8A 9A and 10A

Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet

end test


Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.

taking data with 8A of current

Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off


 

  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement

 Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced. 

Torqued @ 75 in-lbs. (Reference image attached)

 

Attachment 1: TBHT_Glow_-__Before.jpg
TBHT_Glow_-__Before.jpg
Attachment 2: TBHT_Insulator_-_Removed.jpg
TBHT_Insulator_-_Removed.jpg
Attachment 3: Torque_references.jpg
Torque_references.jpg
Attachment 4: TGHT_Insulator_-_Before.jpg
TGHT_Insulator_-_Before.jpg
Attachment 5: TGHT_Insulator_-_After.jpg
TGHT_Insulator_-_After.jpg
Attachment 6: TBHT_Insulator_-_After.jpg
TBHT_Insulator_-_After.jpg
Attachment 7: Finished.jpg
Finished.jpg
  949   Tuesday, December 06, 2022, 11:20 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Tests

Thermocouples installed:

O - O

O - Anode

O - X

X - X

X - O

Multi-pin left side w/ TGHT left end cap thermocouple. TS1 on datalogger

Multi-pin right side w Center Block thermocouple. TS2 on datalogger

Megger check ok. Thermocouples checked with a heat gun ok.

Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL.

Tuesday, December 06, 2022, 11:13: Roughing.

Tuesday, December 06, 2022, 11:56: TP1B on.

Tuesday, December 06, 2022, 12:02: IG1 on. TP1A on.

Tuesday, December 06, 2022, 14:57: Vacuum @ 8.98e-06T.

Tuesday, December 06, 2022, 15:06: Waterline FS#5 open. 8.59e-06T

Tuesday, December 06, 2022, 15:09: Gas line pressurized with argon. SV5 opened.

Tuesday, December 06, 2022, 15:10: No change on vacuum pressure. SV5 closed.


Wednesday, December 07, 2022, 08:14: Power  / Sources on.

Wednesday, December 07, 2022, 08:16: Vacuum @ 2.68e-06T Open SV5. Vacuum remains stable.

Wednesday, December 07, 2022, 08:21: Optics set - Timed out TMS:Q5 & TMS:Q3 re-configured - reset

Wednesday, December 07, 2022, 08:23: TGHT / TBHT / Coil manually set @ 10 / 10 / 5 A. Ok.

Wednesday, December 07, 2022, 08:25: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Anode to 100 V. Ok.

Wednesday, December 07, 2022, 08:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 1 spark between 27-28 kV while tapping up.

Wednesday, December 07, 2022, 10:28: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. 

Wednesday, December 07, 2022, 10:35: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Two sparks occurred while taping up.

Wednesday, December 07, 2022, 10:59: HV reduced. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, December 07, 2022, 11:06: 27.0C - 66.0C Begin coil tap. Vacuum @ 2.59e-06T

Wednesday, December 07, 2022, 11:25: 27.8C - 67.8C. Coil to 80 A. Vacuum @ 2.96e-06T.

Wednesday, December 07, 2022, 11:38: 29.0C - 67.6C. Vacuum @ 3.23e-06T.

Wednesday, December 07, 2022, 11:41: Coil @ 0A.

Wednesday, December 07, 2022, 11:43: Anode @ 200V

Wednesday, December 07, 2022, 11:46: Anode @ 300V

Wednesday, December 07, 2022, 11:48: Anode - BIAS spark @ 364V while tapping up. Anode current jumped from 0 mA to 3.66mA

Wednesday, December 07, 2022, 11:49: Anode @ 400V. Anode Current @ 4.884 mA

Wednesday, December 07, 2022, 11:55: Anode @ 500V. Anode Current @ 6.105 mA

Wednesday, December 07, 2022, 13:05: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min.

Wednesday, December 07, 2022, 13:08: IV4 Open.

Wednesday, December 07, 2022, 13:23: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min.

Wednesday, December 07, 2022, 13:39: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min.

Wednesday, December 07, 2022, 14:12: Auto-ramping TGHT / TBHT to 120 / 70 A @ 2 A per min.

Wednesday, December 07, 2022, 14:24: Auto-ramping TGHT / TBHT to 140 / 90 A @ 2 A per min.

Wednesday, December 07, 2022, 14:37: Auto-ramping TGHT / TBHT to 150 / 100 A @ 2 A per min.


Thursday, December 08, 2022, 08:06: Auto-ramping TGHT / TBHT to 170 / 120 A @ 2 A per min.

Thursday, December 08, 2022, 08:19: Auto-ramping TGHT / TBHT to 190 / 140 A @ 2 A per min.

Thursday, December 08, 2022, 08:36: Auto-ramping TGHT / TBHT to 210 / 160 A @ 2 A per min.

Thursday, December 08, 2022, 08:52: Auto-ramping TGHT / TBHT to 230 / 180 A @ 2 A per min.

Thursday, December 08, 2022, 09:09: Anode @ 100 V

Thursday, December 08, 2022, 09:11: Auto-ramping TGHT / TBHT to 250 / 200 A @ 2 A per min.

Thursday, December 08, 2022, 09:23: Auto-ramping TGHT / TBHT to 270 / 220 A @ 2 A per min.

Thursday, December 08, 2022, 09:38: Auto-ramping TGHT / TBHT to 290 / 230 A @ 2 A per min.

Thursday, December 08, 2022, 09:52: Auto-ramping TGHT / TBHT to 310 / 250 A @ 2 A per min.

Thursday, December 08, 2022, 10:05: Auto-ramping TGHT / TBHT to 330 / 270 A @ 2 A per min.

Thursday, December 08, 2022, 10:19: Auto-ramping TGHT 350 A @ 2 A per min.

Thursday, December 08, 2022, 10:43: Auto-ramping TGHT 370 A @ 2 A per min. Pyrometer is setup. Reading @ 1067.9C.

Thursday, December 08, 2022, 10:56: Auto-ramping TGHT 390 A @ 2 A per min.

Thursday, December 08, 2022, 11:09: Auto-ramping TGHT 400 A @ 2 A per min.

Thursday, December 08, 2022, 12:06: Auto-ramping TGHT 420 A @ 2 A per min.

Thursday, December 08, 2022, 12:19: Auto-ramping TGHT 440 A @ 2 A per min.

Thursday, December 08, 2022, 12:34: Auto-ramping TGHT 460 A @ 2 A per min.

Thursday, December 08, 2022, 12:46: Auto-ramping good vacuum limit reached. TGHT @ 453 A. Vacuum @ 5.12e-06T.

Thursday, December 08, 2022, 13:00: TGHT @ 460 A. Vacuum @ 4.95e-06T

Thursday, December 08, 2022, 13:15: Auto-ramping TGHT 470 A @ 2 A per min.


Friday, December 09, 2022, 06:54: Auto-ramping TGHT 490 A @ 2 A per min. Vacuum @ 2.33e-06T.

Friday, December 09, 2022, 07:08: Auto-ramping TGHT 510 A @ 2 A per min

Friday, December 09, 2022, 07:23: Auto-ramping TGHT 530 A @ 2 A per min

Friday, December 09, 2022, 07:36: Auto-ramping TGHT 550 A @ 2 A per min

Friday, December 09, 2022, 07:50: Auto-ramping TGHT 570 A @ 2 A per min

Friday, December 09, 2022, 08:07: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Friday, December 09, 2022, 08:50: Coil @ 10A - Anode @ 200 V

Friday, December 09, 2022, 10:14: Coil manually tapped up to 50 A

Friday, December 09, 2022, 10:20: Anode to 400 V.

Friday, December 09, 2022, 10:27: Vacuum @ 6.70e-06T

Friday, December 09, 2022, 12:51: Auto-cooling TGHT to 480 A @ 2 A per min

Friday, December 09, 2022, 13:59: Auto-cooling TBHT to 230 A @ 2 A per min

Friday, December 09, 2022, 14:26: Stopped TBHT auto-cooling at 255 A

Friday, December 09, 2022, 14:46 : Auto-ramping TBHT to 290 @ 2 A per min

Friday, December 09, 2022, 15:25 : Auto-ramping TGHT to 580 @ 5 A per min

Friday, December 09, 2022, 16:16 : Auto-cooling TGHT & TBHT to 0 @ 2 A per min

Friday, December 09, 2022, 16:38: Ramped down Anode Voltage to 94 V and coil current to 44.05 A


Monday, December 12, 2022, 08:11: Coil @ 0 A. HV @ 0 V.

Monday, December 12, 2022, 08:15: IV4 closed. SV5 closed. Sources off.

Monday, December 12, 2022, 10:09: IG1 off. TP off.

Monday, December 12, 2022, 11:17: Venting.

 

Attachment 1: Re-routed_Anode_FEBIAD_12-2022_Test_1.docx
Attachment 2: ITS_FEBIAD_measurements_12-2022_Test_1.xlsx
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2

Thermocouples installed (X):

O - O

O - Anode

O - X

O - X

O - O

Megger check ok. Thermocouples checked with a heat gun ok.

Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL on the center block. Edge fins exposed.

Tuesday, December 13, 2022, 16:10: Roughing.

Tuesday, December 13, 2022, 16:40: TP1 B on.

Tuesday, December 13, 2022, 16:49: TP1 A on.

Tuesday, December 13, 2022, 16:58: IG1 on Vacuum @ 7.00e-05T & dropping.


Wednesday, December 14, 2022, 06:49: Waterline FS#5 opened. Vacuum @ 2.42e-06T.

Wednesday, December 14, 2022, 06:53: Power / Sources / Optics on.

Wednesday, December 14, 2022, 06:54: BIAS / EE / EZL / Anode to 1 / 0.5 1 / 0.1 kV.

Wednesday, December 14, 2022, 06:59: TGHT / TBHT / Coil @ 10 A.

Wednesday, December 14, 2022, 07:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, December 14, 2022, 07:21: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. 

Wednesday, December 14, 2022, 07:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Wednesday, December 14, 2022, 07:47: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.

Wednesday, December 14, 2022, 07:49: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min

Wednesday, December 14, 2022, 07:52: IV4 open.

Wednesday, December 14, 2022, 08:01: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:05: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:49 : Auto-ramping TGHT & TBHT to 200 A & 100 A @ 2A er min

Wednesday, December 14, 2022, 10:49 :Auto-ramping TGHT & TBHT to 220 A & 120 A @ 2A er min

Wednesday, December 14, 2022, 11:05 :Auto-ramping TGHT & TBHT to 240 A & 140 A @ 2A er min

Wednesday, December 14, 2022, 11:19 :Auto-ramping TGHT & TBHT to 260 A & 160 A @ 2A er min

Wednesday, December 14, 2022, 11:33 :Auto-ramping TGHT & TBHT to 280 A & 180 A @ 2A er min

Wednesday, December 14, 2022, 11:48 :Auto-ramping TGHT & TBHT to 300 A & 200 A @ 2A er min

Wednesday, December 14, 2022, 12:05 :Auto-ramping TGHT & TBHT to 320 A & 220 A @ 2A er min

Wednesday, December 14, 2022, 12:29: Auto-ramping TGHT & TBHT to 340 A & 240 A @ 2A er min

Wednesday, December 14, 2022, 13:08 : Auto-ramping TGHT & TBHT to 360 A & 260 A @ 2A er min

Wednesday, December 14, 2022, 13:14 : Pyrometer reading shows up after adjustment in focussing

Wednesday, December 14, 2022, 13:22 : Auto-ramping TGHT & TBHT to 380 A & 270 A @ 2A er min

Wednesday, December 14, 2022, 13:35 : Auto-ramping TGHT to 400 A @ 2A per min

Wednesday, December 14, 2022, 13:49: Auto-ramping TGHT to 420 A @ 2 A per min.

Wednesday, December 14, 2022, 14:01: Auto-ramping TGHT to 440 A @ 2 A per min.

Wednesday, December 14, 2022, 14:16: Auto-ramping TGHT to 460 A @ 2 A per min.

Wednesday, December 14, 2022, 14:31: Auto-ramping TGHT to 480 A @ 2 A per min.

Wednesday, December 14, 2022, 14:44: Auto-ramping TGHT to 500 A @ 2 A per min.

Wednesday, December 14, 2022, 14:56: Auto-ramping TGHT to 520 A @ 2 A per min.

Wednesday, December 14, 2022, 15:08: Auto-ramping TGHT to 540 A @ 2 A per min.

Wednesday, December 14, 2022, 15:21: Auto-ramping TGHT to 560 A @ 2 A per min.

Wednesday, December 14, 2022, 15:35 : Auto-ramping TGHT & TBHT to 580 A & 290 A @ 2A er min

Wednesday, December 14, 2022, 16:08 : Auto-ramping TGHT to 600 A @ 2 A per min.

Thursday, December 15, 2022, 10:00 : Auto-ramping TBHT to 300 A @ 2 A per min.

Thursday, December 15, 2022, 13:19 : Auto-ramping TBHT to 330 A @ 2 A per min.

Thursday, December 15, 2022, 14:25 : Increased anode voltage to 400 V.

Thursday, December 15, 2022, 14:50: Reducing TGHT & TBHT to 0 A @ 2 A per min.

Thursday, December 15, 2022, 14:59 : Ramped down anode voltage to 0 V & coil current to 0 A.


Friday, December 16, 2022, 06:59: IV4 & power off. 

Friday, December 16, 2022, 07:01: IG1 off. Turbo pumps off.

Friday, December 16, 2022, 08:15: Venting.

 

 

Attachment 1: Re-routed_Anode_FEBIAD_12-2022_Test_2.docx