ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  866   Friday, March 26, 2021, 17:04 Carla Babcock       Beam line vented for emittance meter exchangeVented beamline and removed ARIEL emittance
meter. In the process of swapping components,
beamline left vented until Monday when we
  
  867   Tuesday, March 30, 2021, 13:19 Carla Babcock       Second emittance meter testingEmittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening,
 Carla_tune_tracking.docx 
  868   Sunday, April 04, 2021, 14:16 Carla Babcock       Water leak problem persistsIG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there.
  
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done.
  
  870   Wednesday, April 14, 2021, 10:21 Luca Egoriti P2N test - Apr 2021HP-SIS    In progress P2N test - Electrical reconfiguration Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod
 ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png 
  871   Monday, April 19, 2021, 14:58 Anders Mjos P2N-SIS    Problems/SolutionsWater leak on coil neg (H and F)Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water
  
  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
 HV_test_-_Online_HS_&_parasitic_mods.docx 
  874   Wednesday, May 26, 2021, 14:29 Aaron SchmidtUC#33 (HS)LP-SISITWTM2 44378-3In progressUC#33 HS conditioningHS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B
 Conditioning_UC#33_HS.docx 
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  878   Wednesday, June 09, 2021, 11:51 Aaron Schmidt      Problems/SolutionsTPS:CB2 issue.Tuesday, June 08, 2021, 08:25: IV4 open.
Optics set minus TPS:CB2. Shows  as green
'on', set to 500V, however read back shows
  
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  
  884   Wednesday, June 30, 2021, 19:08 Fernando Maldonado LP-FEBIAD    FailedFEBIAD parameter scan - efficiency measurements Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021,
08:57: Turbos on 
 anomalous-ionization-regime.pngFernando_screenshots.docx 
  889   Friday, July 30, 2021, 15:34 Carla Babcock      FailedTSG:RP1 failureTP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below
  
  891   Tuesday, August 03, 2021, 11:55 Fernando Maldonado      Problems/SolutionsSwapped emmittance meter voltage cables.After not being able to get beam through
the emittance meter. I diagnosed that the
plates was not biased (reason yet unknow).
  
  892   Thursday, August 05, 2021, 08:49 Fernando Maldonado      Problems/SolutionsCANBUS snooper set up to investigate random optics turnining offProblem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only
 Annotation_2021-08-06_144737.png20210806_150334.jpg 
  893   Saturday, August 07, 2021, 18:07 Fernando Maldonado      Problems/SolutionsFC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself]Saturday, August 07, 2021, 18:02: As mentions
in previous entries, the FC0 current oscillates
with no change on ion source parameters.
  
  894   Monday, August 23, 2021, 09:55 Fernando Maldonado      Problems/SolutionsRP1 changed back Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log
  
  895   Monday, August 23, 2021, 10:49 Aaron Schmidt - Fernando Maldonado      Problems/SolutionsRGA replaced with a blind flangeMonday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  