905
|
Thursday, November 04, 2021, 11:55 |
Fernando Maldonado | | | | | | | Done | Opening vacuum chamber for thesis pictures :p | Thursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39: |
|
|
907
|
Tuesday, November 16, 2021, 13:45 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed. |
|
|
908
|
Tuesday, December 21, 2021, 13:34 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-6 | In progress | Salts test HS & Holiday Shutdown | LP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS. |
|
|
909
|
Tuesday, January 04, 2022, 13:00 |
Aaron Schmidt | | | | | | | | Post water leak | December 30th, 2021: Water poured
down around Isac test stand and probes lab |
|
|
910
|
Wednesday, January 05, 2022, 15:12 |
Carla Babcock | | | | | | | | Modifications to test stand for mass marker tests | Connection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket. |
|
|
911
|
Wednesday, January 12, 2022, 16:12 |
Carla Babcock | | | | | | | | Ramp up of the mass marker target | Wednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A |
|
|
912
|
Monday, February 28, 2022, 08:08 |
Aaron Schmidt | | LP-SIS | | | | | | Mass marker / Coil-Tube target Test #2 | Installed & roughing Friday.
Monday, February 28, 2022, 08:07:
Turbopump TP1B on. |
|
|
913
|
Monday, March 21, 2022, 13:59 |
Carla Babcock | | | | | | | | 3rd mass marker test | 3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic |
|
|
914
|
Monday, April 04, 2022, 20:44 |
Carla Babcock | | | | | | | | Change from 9-pin connectors to 5-pin connectors | Swapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules. |
|
|
915
|
Monday, April 04, 2022, 20:56 |
Carla Babcock | | | | | | | | wiring reverted for cathode-bias FEBIAD | Wiring which was changed to run the mass
marker tests has been reverted:
anode bias cable connected |
|
|
918
|
Monday, April 11, 2022, 14:52 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP6 controller | Monday, April 11, 2022, 13:58: Controller
for TP6 is dead. Literally smokes if you
try to use it. |
|
|
919
|
Wednesday, April 13, 2022, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak | Wednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already |
|
|
920
|
Wednesday, April 20, 2022, 13:42 |
Aaron Schmidt | | | | | | | | Vent Beamline half | Aurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off. |
|
|
921
|
Thursday, April 21, 2022, 13:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak checks | https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded |
|
|
922
|
Monday, May 02, 2022, 14:10 |
Aaron Schmidt | | P2N-SIS | | | | | | Empty Chamber PS test. | No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has |
|
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
|
929
|
Friday, May 27, 2022, 07:19 |
Fernando Maldonado | | | | | | | Done | FEBIAD parameter scan web-app and brief description (with links) | A web-app for systematic FEBIAD parametrizations
has been develop and now includes the
ISAC Test Stand (ITS) : |
|
|
933
|
Monday, June 20, 2022, 11:49 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, June 20, 2022, 11:49: Water line
loop installed. Roughing.
Thursday, June 23, 2022, |
|
|
935
|
Thursday, June 30, 2022, 13:50 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022,
15:00: Venting. |
|
|
937
|
Sunday, July 10, 2022, 22:19 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP2 Trip / TMS:RP2 issue | Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps |
|