Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 48 of 53  Not logged in ELOG logo
Entry  Thursday, November 04, 2021, 11:55, Fernando Maldonado, , , , , , , Done, Opening vacuum chamber for thesis pictures :p 
Entry  Tuesday, November 16, 2021, 13:45, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Entry  Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown 
Entry  Tuesday, January 04, 2022, 13:00, Aaron Schmidt, , , , , , , , Post water leak 
Entry  Wednesday, January 05, 2022, 15:12, Carla Babcock, , , , , , , , Modifications to test stand for mass marker tests 
Entry  Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG
Entry  Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2 
Entry  Monday, March 21, 2022, 13:59, Carla Babcock, , , , , , , , 3rd mass marker test 
Entry  Monday, April 04, 2022, 20:44, Carla Babcock, , , , , , , , Change from 9-pin connectors to 5-pin connectors 5pin_pinout_April42022.png
Entry  Monday, April 04, 2022, 20:56, Carla Babcock, , , , , , , , wiring reverted for cathode-bias FEBIAD 
Entry  Monday, April 11, 2022, 14:52, Aaron Schmidt, , , , , , , Problems/Solutions, TP6 controller  
Entry  Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak 
Entry  Wednesday, April 20, 2022, 13:42, Aaron Schmidt, , , , , , , , Vent Beamline half 
Entry  Thursday, April 21, 2022, 13:38, Aaron Schmidt, , , , , , , Problems/Solutions, Leak checks 
Entry  Monday, May 02, 2022, 14:10, Aaron Schmidt, , P2N-SIS, , , , , , Empty Chamber PS test. 
Entry  Thursday, May 05, 2022, 14:43, Aaron Schmidt, , P2N-SIS, , , 45241-1, 45240-1, In progress, P2N assembly conditioning. 
Entry  Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links) 
Entry  Monday, June 20, 2022, 11:49, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Entry  Thursday, June 30, 2022, 13:50, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Entry  Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue 
ELOG V2.9.2-2455