ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  847   Tuesday, February 09, 2021, 14:02 Aaron Schmidt      Problems/SolutionsDI water loss

Tuesday, February 09, 2021, 13:43: DI water flow completely stopped.

Control room contacted. DI water loss confirmed.

Tuesday, February 09, 2021, 13:52: DI water flow returned.

Control room contacted. DI water loss due to a "seamless" pump change over for the DI water supply & mechanical services. The supply was transferred over to a new pump which overloaded and failed. They had to switch back over to the (old) pump. Mechanical services will still try to do the switch over again. Either tomorrow or the day after. Running the TS up to 580A until then is not recommended.  Control room to update tomorrow morning.

Fault# 13773: Cu-LCW south SA3-03 tripped on motor overload.

  848   Wednesday, February 10, 2021, 09:49 Aaron Schmidt LP-SIS  44691-844378-2 / 44378-3FailedEnergy spread calibration with SIS

Note* target has a ring on the TGHT - Right leg. EE & PE placed. Target to HS OL - OK.

Wednesday, February 10, 2021, 09:37: Roughing.

Wednesday, February 10, 2021, 09:45: Bypass / Force applied on IG1 to test Anode.

Wednesday, February 10, 2021, 09:46: Anode @ 10 V. Ok.

Wednesday, February 10, 2021, 09:47: Anode @ 200 V. Ok. No current.

Wednesday, February 10, 2021, 09:48: Anode to 0V & off. Bypass / Force removed from IG1.

Wednesday, February 10, 2021, 10:06: TP1B on.

Wednesday, February 10, 2021, 10:46: TP1A on.

Wednesday, February 10, 2021, 13:42: Vacuum @ 9.08e-06T. open FS#5

Wednesday, February 10, 2021, 13:46: Vacuum increased to 9.70e-06T as well as the backing pressure increased. Turbo pumps off. Going to swap the assembly out completely however continue with the same LP-SIS oven.

Wednesday, February 10, 2021, 15:20: HS 44378-3 Installed w/ LP-SIS oven #44691-8. Roughing

Wednesday, February 10, 2021, 15:48: TP1B on. 

Wednesday, February 10, 2021, 16:02: TP1A on.

Wednesday, February 10, 2021, 16:11: Bypass / Force applied on IG1 to test Anode. Anode @ 200 V. Ok. No current.

Wednesday, February 10, 2021, 16:13: Anode to 0V & off. Bypass / Force removed from IG1. EZL & EE check ok. IG1 on for real.

Wednesday, February 10, 2021, 16:14: Vacuum @ 6.12e-05T & Dropping.

Wednesday, February 10, 2021, 16:16: FS#5 open. Both IG1 & the backing lines are pumping down quickly.

Contacted MCR. Reminder, mechanical services still intends to service the DI water pump. Constant DI water flow is not guaranteed.

https://elog.triumf.ca/TIS/Test-Stand/847


Thursday, February 11, 2021, 00:13: : Anode to 10V. Auto-ramping TGHT/TBHT to 200/100 A @ 2 A/min

 Thursday, February 11, 2021, 09:03: Auto-ramping TGHT/TBHT to 400/200 A @ 2 A/min


From: Jas Uppal <juppal@triumf.ca>Sent: February 11, 2021 9:12 AM
To: Fernando Maldonado Millan <maldonado@triumf.ca>
Subject: Re: Cu-LCW water lines status for the ISAC test stand

Hi Fernando,

  There are no plans for Cu-LCW system to be switched off today.  I believe they are still working on correcting the issue that caused the trip two days ago.  Once it is corrected and we are ready to switch to the secondary pump, the switch over "should" be relatively invisible with possibly a slight drop in line pressure.

Jas Uppal 


 Thursday, February 11, 2021, 10:31: TGHT/TBHT at 400/200 A. Anode still at 10 V 

Thursday, February 11, 2021, 10:33: Auto-ramping TGHT/TBHT to 580/230 A @ 2 A/min

Thursday, February 11, 2021, 10:42: BIAS/EZL/EE @ 30/13/1.5 kV. 

Thursday, February 11, 2021, 13:42: Uncapable of holding HV. Maybe the new heatshield needs more time to outgas.

Thursday, February 11, 2021, 13:44: BIAS/EZL/EE @ 0.000 kV


Friday, February 12, 2021, 10:07: In order to trouble shoot the ISAC TS, I  let the sparks to continue. Initially, they occurred in the extraction electrode spark gap and were both visible and audible. However, they stop and the instabilitiy was present.

I rise the voltage again and let the spark happen for a longer period of time.

I saw how the collimator wire on the far back of the source tray was moving as if a hurricane was inside, which is very strange. I followed up the wire and I saw how it was sparking to something (see attached photo)

I say something because from the angle is difficult to say if it was going to the chamber itself or to the HS waterlines. Both scenarios are concerning

First of all the collimator is never biased and it if any case the jacket  (MHV cable) is on ground ground

In case the discharge happened from wire to the chamber, then the collimator wire was charging up, it is extremely important o note that the jacketed cable goes outside the box very close to one of the turbos.

In the other scenario where the discharge was happening from the wire to the HS waterlines, that is, HV to ground, the simply creating a clearance should be enough. In this case as well is relevant to know that this jackted cable leaves the farday cage.

I will create clearance from collimator wire to HS waterlines.

Friday, February 12, 2021, 10:33: BIAS/EZL/EE @ 0.000 kV

Friday, February 12, 2021, 10:35: Auto-cooling TGHT/TBHT to 0 A @ 4A/min.

Friday, February 12, 2021, 11:05: Discharge confirmed visually to go into the HS waterlines, (HV to ground) (see second photo attached)

Friday, February 12, 2021, 11:06: Inside the blue rack,  I could hear ticks that match the discharges, probably  the collimator PS is there. Will check later with things  off.

 Friday, February 12, 2021, 13:17: Turbos off.

 Friday, February 12, 2021, 14:36: Venting.

Attachment 1: spark_inside_chamber_roof.png
spark_inside_chamber_roof.png
Attachment 2: spark_inside_chamber_front_view.png
spark_inside_chamber_front_view.png
  852   Thursday, February 18, 2021, 10:47 Aaron Schmidt       Optics loss / CANBUS failure.

Thursday, February 18, 2021, 10:45: TPS:Q3 & the TSB CBC CANBUS controllers had failed yesterday, as well as a cable was incorrectly seated. This was fixed this morning.

Image previewBefore

After.

 

  853   Thursday, February 18, 2021, 11:03 Aaron Schmidt      Problems/SolutionsDI water pump configuration

https://elog.triumf.ca/TIS/Test-Stand/847

There was a previous DI CU-LCW  pump trip as per the above elog. The CU-LCW pump was configured this morning. The water pressure is set to 80 PSI as per the MCR. Any further can overload & trip the pump. 

Thursday, February 18, 2021, 10:55: Current flow rates & pressure read at the TS

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.30 3.8
 TBHT 22.14

6.27

 COIL + EE 22.08 1.74
 TGHT 22.16 5.04

DI water pressure as per the gauge on the supply side of the FS#2-5 manifold @ 85 PSI.

Noticeable flow rate reduction based on previous target conditioning logs. Previous pressure was around 100 PSI.

  860   Tuesday, March 02, 2021, 11:42 Aaron Schmidt       TS Tripped.

Tuesday, March 02, 2021, 11:40: Fully reset

TGHT / TBHT set to 20 A ok. Anode w/ 30 V. ok.

Tuesday, March 02, 2021, 11:42: 10 A on coil. Increment was at 75 A. Set back to 1 A.

Tuesday, March 02, 2021, 11:44: BIAS / EE / EZL @ 1 / 0.5 / 1 kV.

  862   Wednesday, March 10, 2021, 14:28 Aaron Schmidt      In progressRP2 swap.

Swapped RP2 out from a Varian SH-110 to a Varian PTS06001.

Wednesday, March 10, 2021, 14:20: RP2 on.

Wednesday, March 10, 2021, 14:27: Turbo pumps on

  863   Wednesday, March 10, 2021, 14:57 Aaron Schmidt HP-FEBIAD   42752-5In progressEmittance meter test with FEBIAD

Wednesday, March 10, 2021, 14:54: Roughing.

Wednesday, March 10, 2021, 14:57: BV1A open.


Thursday, March 11, 2021, 09:41: TP1B on. 

Thursday, March 11, 2021, 09:44: TP1A on. 

Thursday, March 11, 2021, 09:52: IG1 on. 


Monday, March 15, 2021, 07:50: Vacuum @ 6.91e-07T. Open waterlines.

Monday, March 15, 2021, 07:52: Vacuum ok.

Monday, March 15, 2021, 07:55: Power / sources on.

Monday, March 15, 2021, 07:56: TGHT / TBHT @ 10 A.

Monday, March 15, 2021, 07:57: BIAS / EE / EZL @ 1 / 0.5 / 1 kV. Anode @ 25 V. Coil @ 5 A.

Monday, March 15, 2021, 08:02: All sources ok. Set back to 0. Ready for remote operation. Await word from MCR on Cu DI water system.

ref: https://elog.triumf.ca/TIS/Test-Stand/864


Tuesday, March 16, 2021, 09:53: IV4 Open

  865   Thursday, March 25, 2021, 08:11 Aaron Schmidt       Test Stand Tripped. (Water leak)

Lot's of water visually present in the chamber.

Wednesday, March 24, 2021, 13:17: Water lines purged.

Vent & wipe out the water inside the chamber. Setup a fan to aid in drying. Manually purge the water from the RP1 Scroll pump through the exhaust.


Thursday, March 25, 2021, 08:06: Gradually open each line to check the water blocks & fittings for a visual leak. Open the ballast plug on RP1, as well as manually purge the water from the RP1 Scroll pump through the exhaust again.

Thursday, March 25, 2021, 08:34: Leak found on FS#3 - Left Coil return (G) water block.

Thursday, March 25, 2021, 09:15: FEBIAD assembly & L-Coil line removed.

Thursday, March 25, 2021, 11:38: Re-connect RP1 to the exhaust port & re-insert the ballast plug.

Thursday, March 25, 2021, 11:40: RP1 Ok. CG1A & CG1 B around 0.048T & dropping. Chamber still open.


Indium gasket installed on G, C-Seal on E.

Friday, March 26, 2021, 08:21: Roughing.

Friday, March 26, 2021, 09:08: Vacuum @ 2.001 T. Opened FS#3 waterline. Quick test.

Friday, March 26, 2021, 09:11: Vacuum @ 1.901 T. No observable spike on CG1.

Friday, March 26, 2021, 09:12: Close FS#3 & purge

Friday, March 26, 2021, 09:27: Quickly open ballast plug.

Friday, March 26, 2021, 09:30: Re-insert plug.

Friday, March 26, 2021, 09:38: CG1 @ 2.253 T.

Friday, March 26, 2021, 09:41: Close BV1A & B.

Friday, March 26, 2021, 09:45: Manually purge water from the RP1 Scroll pump through the exhaust.

Friday, March 26, 2021, 09:51: Re-open BV1A & B.

Friday, March 26, 2021, 10:17: Close BV1A & B. Manually purge water from the RP1 Scroll pump through the exhaust.

Friday, March 26, 2021, 10:26: Close the exhaust & give the pump time to recover.

Friday, March 26, 2021, 10:36: Briefly vent the chamber to 30 T. Re-open BV1A & B.

Friday, March 26, 2021, 11:20: Vacuum @ 1.706T. Open FS#3. Allow to fill with water, then close off. No observable spike on CG1.

Friday, March 26, 2021, 11:25: Opened ballast cap. Close BV1A & B.

Friday, March 26, 2021, 11:26: Close ballast.

Friday, March 26, 2021, 11:29: Briefly vent the chamber to 30 T. Re-open BV1A & B.

Friday, March 26, 2021, 12:11: Vacuum @ 2.75T. Close BV1A & B. Vent chamber to setup a fan.


Monday, March 29, 2021, 09:00: LD & He attached. LD#2 as supplied via Vacuum group.

Monday, March 29, 2021, 09:01: Sniffer set. Leak Rate @ 2.0E-07 to 2.3E-07 atm-cc/sec

Monday, March 29, 2021, 09:03: Pressurize (E)(G) to 75 PSI.

Monday, March 29, 2021, 09:05: No major spike seen on LD.

Monday, March 29, 2021, 09:06: Pressurize (E)(G) to 100 PSI.

Monday, March 29, 2021, 09:09: No major spike seen on LD. Purge He from the lines.

Monday, March 29, 2021, 09:12: Roughing.

Monday, March 29, 2021, 09:22: Opened ballast cap to release water vapour while roughing.

Monday, March 29, 2021, 09:42: Closed the ballast cap. Purge cycle RP1 on & off for the next hour or so.

To purge cycle RP1 for water vapour. Close BV1A & B. Disconnect exhaust line from RP1 & open the upper ballast. Close PV1, Vent with TSG:VV1A till the line reaches atmosphere with dry nitrogen.

Close VV1 & open PV1. Water should spew out of the exhaust. Rough the backing lines down. Open BV1A & B to rough then chamber. Repeat leaving the upper ballast open.

Monday, March 29, 2021, 14:00: Purge RP1. Close upper ballast, re-connect exhaust.

Monday, March 29, 2021, 14:36: TP1B on.

Monday, March 29, 2021, 19:47: TP1A on. 

Monday, March 29, 2021, 19:55: IG1 on. 


Tuesday, March 30, 2021, 08:52: Vacuum @ 4.48e-06T.

LD to TP1B base @ 1.4E-08 to 1.9E-08 atm-cc/sec.

Tuesday, March 30, 2021, 08:58: He @ 55 PSI

Tuesday, March 30, 2021, 09:04: LD to TP1B base @ 2.4E-08 atm-cc/sec.

Tuesday, March 30, 2021, 09:12: Reconnect FS#3 to DI.

Tuesday, March 30, 2021, 09:14: Opened FS#3 w/ DI

Tuesday, March 30, 2021, 09:20: Vacuum @ 4.40e-06T.

Tuesday, March 30, 2021, 09:33: FS#2, 4, & 5 open. Vacuum ok @ 4.40e-06T

Tuesday, March 30, 2021, 09:34: Power/sources on.

Tuesday, March 30, 2021, 09:37: Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 A per min.

Tuesday, March 30, 2021, 12:12: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min. 

Tuesday, March 30, 2021, 13:50: Vacuum @ 4.66e-06T. Auto-ramping TGHT / TBHT to 450 / 150 A @ 2 A per min.

Tuesday, March 30, 2021, 21:59: Vacuum @ 5.01e-06T. TGHT / TBHT @ 393 / 150 A. Reset Auto-ramping TGHT / TBHT to 550 / 200 A @ 2 A per min.


Wednesday, March 31, 2021, 11:46: IV4 opened. Optics & HV power switched on.

Wednesday, March 31, 2021, 11:52: HV check ok. Optics reset. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. Coil @ 4 A. Anode @ 100 V

Wednesday, March 31, 2021, 11:54: Optics remain on. HV & coil back to 0. Ready to run once the Vacuum returns to a reasonable level. Vacuum @ 5.45e-06T.

Wednesday, March 31, 2021, 15:05: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Attachment 1: Mar_2021_-_FS#3_leak..docx
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3

Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.

Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.

Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.

Tuesday, April 13, 2021, 13:31: Visual leak present on (F). Purge the line.

Change the gasket.

Tuesday, April 13, 2021, 14:42: FS#3 Waterline opened.

Tuesday, April 13, 2021, 14:55: No water leak noticed visually or on the gloves.

Tuesday, April 13, 2021, 14:58: Roughing. Will leak check under vacuum tomorrow morning.

Tuesday, April 13, 2021, 16:01: TP1B on. 

Tuesday, April 13, 2021, 20:53: TP1A on. 

Tuesday, April 13, 2021, 20:58: IG1 on. 

 

 

  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning

Parasitic assemblies on the lid & end plate included. Online HS.

Wednesday, May 19, 2021, 16:00: Roughing.


Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.

Thursday, May 20, 2021, 08:44: FS#5 open. Vacuum ok.

Thursday, May 20, 2021, 08:45: Power / sources on.

Thursday, May 20, 2021, 09:34: Turbos OFF

Thursday, May 20, 2021, 10:37: Venting.

Thursday, May 20, 2021, 11:28: P2N legs no longer touching. Roughing.

Thursday, May 20, 2021, 12:05: Turbo pump TP1B on.

Thursday, May 20, 2021, 12:10: Turbo pump TP1A on.

LE:

Thursday, May 20, 2021, 15:00: Ramping stared at high warming rate. 10 or 5 A every 15 seconds


Friday, May 21, 2021, 01:31: Around midnight, the P2NHT current was very noisy for few hours, and then it dropped to zero. Turbos are now stopped to open up and investigate.

Friday, May 21, 2021, 05:45 P2N assembly removed, water lines closed and purged - one leg is fully broken

 

FBP:

HV tests Monday 24/05/2021 and Tuesday 25/05/2021

HS was ramped up to 30KV on monday, only 1 spark seen over night. BIAS/EZL/EE : 30KV/14KV/-1.5

Ramping to max HV on Tuesday.

40KV

AS:

Tuesday, May 25, 2021, 11:5: HV tapped down to 0 kV on BIAS / EE / EZL.


Wednesday, May 26, 2021, 07:23: Power / sources off. IG1 off. Turbo pumps off.

Wednesday, May 26, 2021, 09:04: Venting. Waterlines purged.

LE:

Wednesday, May 26, 2021, 10:37 Target removed from test stand and brought to cold lab

 

Attachment 1: HV_test_-_Online_HS_&_parasitic_mods.docx
  874   Wednesday, May 26, 2021, 14:29 Aaron SchmidtUC#33 (HS)LP-SISITWTM2 44378-3In progressUC#33 HS conditioning

HS waterlines were very tight to line up.

Wednesday, May 26, 2021, 14:29: Roughing.

Wednesday, May 26, 2021, 15:09: TP1B on. 

Wednesday, May 26, 2021, 15:36: TP1B off. 

Wednesday, May 26, 2021, 16:37: Venting. 

Wednesday, May 26, 2021, 18:03: VV1 closed. 


Thursday, May 27, 2021, 07:05: Gaskets swapped. Connections inspected. Roughing.

Thursday, May 27, 2021, 07:47: TP1B on. 

Thursday, May 27, 2021, 08:00: TP1A started.

Thursday, May 27, 2021, 08:16: IG1 on. 


Monday, May 31, 2021, 08:08: Vacuum @ 7.29e-07T.

Monday, May 31, 2021, 08:10: Waterlines opened. Vacuum ok @ 7.26e-07T

Monday, May 31, 2021, 08:12: Power/Sources on.

Monday, May 31, 2021, 08:15: No response on TGHT. TBHT ok.

Monday, May 31, 2021, 11:30: Loose control cable found on the PS. Connected. Manually set TGHT / TBHT to 10 A & back ok. Checked FS#5 interlocks - OK.

Monday, May 31, 2021, 11:50: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.

Monday, May 31, 2021, 18:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, June 01, 2021, 15:40: Auto-cooling @ 1 A per min.


Wednesday, June 02, 2021, 07:57: Power / sources off. Ion gauge & turbo pumps off. 

Wednesday, June 02, 2021, 07:58: FS#5 purged.

Wednesday, June 02, 2021, 10:12: Venting.

 

Attachment 1: Conditioning_UC#33_HS.docx
  875   Wednesday, June 02, 2021, 10:45 Aaron SchmidtUC#34 HSLP-SIS TM243044-1344378-1In progressUC#34 HS conditioning

 Straight tube target / TGHT for outgassing.

Wednesday, June 02, 2021, 11:06: Roughing.

Wednesday, June 02, 2021, 12:15: TP1B on. 

Wednesday, June 02, 2021, 12:54: TP1 A on. IG1 on. 

Wednesday, June 02, 2021, 14:58: Vacuum @ 2.24e-06T

Wednesday, June 02, 2021, 15:01: Waterlines opened. vacuum remained stable.

Wednesday, June 02, 2021, 15:02: Power / sources on.


Thursday, June 03, 2021, 11:18: Auto-ramping TGHT @ 2 A per min to 580A. 


Sunday, June 06, 2021, 21:26: Auto-cooling @ 1 A per min. 


Monday, June 07, 2021, 08:33: Power/sources off. IG1 off. Turbo pumps off.

  876   Monday, June 07, 2021, 13:45 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressTa#62 Conditioning

Monday, June 07, 2021, 13:44: Roughing.

Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)

Monday, June 07, 2021, 14:32: Unstable. Venting.

Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.

Monday, June 07, 2021, 15:35: TP1B on.

Monday, June 07, 2021, 15:42: TP1B up to speed.

Monday, June 07, 2021, 15:45: TP1A on.

Monday, June 07, 2021, 16:01: IG1 on.

Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.


Tuesday, June 08, 2021, 08:01: Power / sources on.

Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.

Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 21.9 4.02
 TBHT 22.4

3.15

 COIL + EE 21.9 4.99
 TGHT 22.0 5.58

Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.

Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.

Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.

Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min. 

Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.

Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A. 


Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min. 

Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.

Wednesday, June 09, 2021, 10:33: Power /  sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.

Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.

 

Attachment 1: Ta#62_Conditioning_-_1.docx
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installed

Monday, June 07, 2021, 14:39: Roughing beam line section.

Monday, June 07, 2021, 14:46: TMS:TP6 on.

Monday, June 07, 2021, 14:49: TMS:TP2 on.


Wednesday, June 09, 2021, 10:00: FC6 wiring reconnected. 

 

  878   Wednesday, June 09, 2021, 11:51 Aaron Schmidt      Problems/SolutionsTPS:CB2 issue.

Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.


Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.

Wednesday, June 09, 2021, 11:49: Card replaced by controls. Verified "Ok"  in " LB Mode": RDVOL, RDCUR, RDDAC all similar. Operational again.

  879   Wednesday, June 09, 2021, 14:31 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressInstall MB1 window & 9 pin for V test.

Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6

https://elog.triumf.ca/TIS/Test-Stand/721

ST 9-pin                       HV rack

Pin to L TGHT - 1 - Black / COM / 5

Pin to R TGHT - 6 - Red / 9

Pin to L TBHT - 4 - Black / COM / 2

Pin to R TBHT - 5 - Red / 1


Wednesday, June 09, 2021, 14:29: Window installed. Roughing -  Beam line side.

Wednesday, June 09, 2021, 14:41: TP6 on.

Wednesday, June 09, 2021, 14:45: TP2 on.

Wednesday, June 09, 2021, 14:55: Roughing.

Wednesday, June 09, 2021, 16:09: TP1 on.


Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\

TGHT reading ok , TBHT odd? Internal connection.

Thursday, June 10, 2021, 14:45: Turbo pumps off.

Thursday, June 10, 2021, 15:25: Venting.

Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.

Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.

Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.

Thursday, June 10, 2021, 16:43: TP1B on.

Thursday, June 10, 2021, 16:48: TP1A on.

Thursday, June 10, 2021, 16:55: IG1 on


Tests Complete as per Aurelia.

Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.

Monday, June 21, 2021, 09:40: Venting both ends.

Attachment 1: Ta#62_voltage_tests.docx
  880   Monday, June 21, 2021, 11:53 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4FailedTa#62 Conditioning - 2

Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)

Monday, June 21, 2021, 11:30: Roughing chamber.

Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.

Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.

Monday, June 21, 2021, 12:02: TP1B on.

Monday, June 21, 2021, 12:13: TP1A on.

Monday, June 21, 2021, 12:21: IG1 on.

Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5

Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.

Monday, June 21, 2021, 14:42: Power / Sources on.

Monday, June 21, 2021, 14:43; IV4 opened & Optics on


Tuesday, June 22, 2021, 07:40: Quick system check ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.7 4.02
 TBHT 24.2

3.18

 COIL + EE 23.6 5.11
 TGHT 23.8 5.64

Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.

Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.

Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.

Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.

Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.

Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.

Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.

Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.

Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.


Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off. 

Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged.

Attachment 1: Ta#62_Conditioning_-_2.docx
  881   Wednesday, June 23, 2021, 12:24 Aaron SchmidtSiC#40HP-SISITETM442218-843515-8In progressSiC#40 Conditioning-2

Wednesday, June 23, 2021, 12:22: Roughing.

Wednesday, June 23, 2021, 13:22: TP1B on.

TP1B tripped.

Wednesday, June 23, 2021, 15:05: TP1B was restarted.

Wednesday, June 23, 2021, 15:15: TP1B on.

Wednesday, June 23, 2021, 16:21: TP1A started.

Wednesday, June 23, 2021, 16:30: IG1 on.

Wednesday, June 23, 2021, 17:53: FS#5 opened. Vacuum @ 7.52e-06T

Wednesday, June 23, 2021, 17:56: Vacuum Stable. Power on. TGHT / TBHT on.


Thursday, June 24, 2021, 05:40: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. 

Thursday, June 24, 2021, 09:00: IV4 Opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.9 4.02
 TBHT 24.2

3.21

 COIL + EE 23.4 5.08
 TGHT 24.4 5.69

Thursday, June 24, 2021, 09:02: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Thursday, June 24, 2021, 09:10: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Optics on & set

Thursday, June 24, 2021, 12:52: Mass / Wire scans complete

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 30.2 3.99
 TBHT 25.0

3.20

 COIL + EE 24.1 5.05
 TGHT 25.3 5.71

 Thursday, June 24, 2021, 14:00: Auto-cooling @ 2 A per min.

 Thursday, June 24, 2021, 14:08: Auto-cooling aborted. TGHT / TBHT back to 580 / 230 A. Checking the emittance rig.

Thursday, June 24, 2021, 22:20: Auto-Cooling & HV off. - CB


Friday, June 25, 2021, 05:32: Sources off. IV4 closed. IG1 & Turbo pumps off.  

Friday, June 25, 2021, 07:09: IV4 reset. Power off. Venting.

Attachment 1: SiC#40_Conditioning_-_2.docx
Attachment 2: ER-580-230-30kV-m7_-_2.txt
value (Voltage offset      40.0000)
     75.0000
      1.0000
     95.0000
  29978.0220
21
21
./emit.dat
 -0.0012 -0.0003 -0.0006 -0.0006 -0.0003 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006
 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006 -0.0003 -0.0006
 -0.0003 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0003 -0.0006 -0.0006 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0003 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006
 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006
 -0.0009 -0.0009 -0.0006 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0003 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009
 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0003 -0.0009 -0.0009 -0.0009 -0.0009 -0.0003 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006
 -0.0003 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006
 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0003 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0006 -0.0009 -0.0006 -0.0012 -0.0009 -0.0006
 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006
 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006
 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0003 -0.0009 -0.0003 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006
 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0003 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009
 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009
 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0003 -0.0006
 -0.0006 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006
 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006
 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0003 -0.0006 -0.0006 -0.0006
 -0.0009 -0.0003 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0003 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - New

Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880

Friday, June 25, 2021, 11:16: Roughing.

Friday, June 25, 2021, 11:55: TP1B started.

Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.

Friday, June 25, 2021, 12:08: IG1 on.

Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.

Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.

Friday, June 25, 2021, 12:30: Power / sources PS on.

Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)

Vacuum @ 6.70e-06T

TGHT / TBHT @ 10 / 10 A

BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.

Ready for operation.

Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.


Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.

Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV. 

Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.  

Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.

Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.

Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.  


Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off 

Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting.

Attachment 1: Ta#62_44691-4_Conditioning_-_R.docx
Attachment 2: Ta#62_44691-4_Conditioning..docx
Attachment 3: ITE-TM4-Ta#62-LP-SIS_Test_Stand.docx
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty Chamber

Monday, June 28, 2021, 09:22: Roughing.

Monday, June 28, 2021, 10:10: TP1B on.

Monday, June 28, 2021, 10:22: TP1A on (Tripped)

Monday, June 28, 2021, 10:30: Both turbo pumps off. Leave it under a rough vacuum.


Fernando

Wednesday, June 30, 2021, 15:09 : Venting