Entry  Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS  
Entry  Monday, January 04, 2021, 08:17, Aaron Schmidt, , , , , , , , Restart TS 
Entry  Friday, January 29, 2021, 09:13, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, In progress, TS settings ok. 
Entry  Monday, February 08, 2021, 09:20, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, Failed, Energy spread calibration with SIS. No PE ESC_-_Feb_8_Start.docx
Entry  Tuesday, February 09, 2021, 14:02, Aaron Schmidt, , , , , , , Problems/Solutions, DI water loss 
Entry  Wednesday, February 10, 2021, 09:49, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-2 / 44378-3, Failed, Energy spread calibration with SIS spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png
Entry  Thursday, February 18, 2021, 10:47, Aaron Schmidt, , , , , , , , Optics loss / CANBUS failure. 
Entry  Thursday, February 18, 2021, 11:03, Aaron Schmidt, , , , , , , Problems/Solutions, DI water pump configuration 
Entry  Tuesday, March 02, 2021, 11:42, Aaron Schmidt, , , , , , , , TS Tripped. 
Entry  Wednesday, March 10, 2021, 14:28, Aaron Schmidt, , , , , , , In progress, RP2 swap. 
Entry  Wednesday, March 10, 2021, 14:57, Aaron Schmidt, , HP-FEBIAD, , , , 42752-5, In progress, Emittance meter test with FEBIAD 
Entry  Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak) Mar_2021_-_FS#3_leak..docx
Entry  Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3 
Entry  Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning  HV_test_-_Online_HS_&_parasitic_mods.docx
Entry  Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning Conditioning_UC#33_HS.docx
Entry  Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning 
Entry  Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning Ta#62_Conditioning_-_1.docx
Entry  Monday, June 07, 2021, 14:40, Aaron Schmidt, , , , , , , Done, FC6 re-installed 
Entry  Wednesday, June 09, 2021, 11:51, Aaron Schmidt, , , , , , , Problems/Solutions, TPS:CB2 issue. 
Entry  Wednesday, June 09, 2021, 14:31, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Install MB1 window & 9 pin for V test. Ta#62_voltage_tests.docx