  Test-Stand, Page 45 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  835   Monday, December 21, 2020, 07:58 Aaron Schmidt       Shutdown TS Shutting down the ISAC TS for the planned
outage on Dec 22.
Monday, December 21, 2020, 07:50:
  
  836   Monday, January 04, 2021, 08:17 Aaron Schmidt       Restart TSRestarting TS after holidays & planned
power outage.
Monday, January 04, 2021, 08:17:
  
  837   Monday, January 11, 2021, 14:20 Carla Babcock       Test stand wiring reverted to anode bias modeI have rewired the test stand (service
cap wiring only, not power supply wiring)
to anode bias mode as shown in the diagram.
  
  838   Thursday, January 14, 2021, 08:31 Fernando Maldonado      In progressGas delivery system upgrade

    

       
            
 new-gauge.png 
  839   Wednesday, January 20, 2021, 11:30 Fernando Maldonado      DoneCathode bias mode configuration confirmed

    

       
            
  
  840   Thursday, January 21, 2021, 10:10 Fernando Maldonado LP-SIS  44139-1044378-2DoneEnergy spread calibration - SIS with TBHT negatively biased Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion 
Source, or ANBOSIS (still working on the
  
  841   Thursday, January 21, 2021, 10:55 Fernando Maldonado      DoneUpdated Good Vac value for TSG:IG1On Tuesday the hard good vacuum level was
changed from 7e-6 T to 1e-5 T
to allow larger leak rates when testing FEBIAD.
  
  842   Friday, January 29, 2021, 09:13 Aaron Schmidt LP-SIS  44139-1044378-2In progressTS settings ok.Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good.
  
  843   Monday, February 01, 2021, 08:38 Fernando Maldonado LP-SIS  44139-10 44378-2 FailedEnergy spread calibrationMonday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the  amount of dispersion at the
 ESC_-_Jan_29_start.docxESC_-__Feb_3_start.docxER-580-230-30kV-m7.txtEr-580-230-30kV-m133.txt 
  844   Thursday, February 04, 2021, 18:48 Fernando Maldonado LP-SIS  44139-10 44378-2 Problems/SolutionsEnergy spread calibration with SISThe system was vented to  make clearance
on the waterlines as a very small continuous
discharge was observed.
 6x 
  845   Thursday, February 04, 2021, 19:22 Fernando Maldonado LP-SIS   44139-10 44378-2DoneEnergy spread calibration with SISSee e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing
 ESC_-_Feb_5_Start.docx 
  846   Monday, February 08, 2021, 09:20 Aaron Schmidt LP-SIS  44139-1044378-2FailedEnergy spread calibration with SIS. No PERe-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing.
 ESC_-_Feb_8_Start.docx 
  847   Tuesday, February 09, 2021, 14:02 Aaron Schmidt      Problems/SolutionsDI water lossTuesday, February 09, 2021, 13:43: DI water
flow completely stopped.
Control room contacted. DI water
  
  848   Wednesday, February 10, 2021, 09:49 Aaron Schmidt LP-SIS  44691-844378-2 / 44378-3FailedEnergy spread calibration with SISNote* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK.
 spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png 
  849   Friday, February 12, 2021, 12:16 Fernando Maldonado      Problems/SolutionsGrounding collimator cable from outside Friday, February 12, 2021, 12:13:
Since the collimator is not used, Carla and
I installed a BNC short outside the cage.
 20210212_121227.jpg 
  850   Friday, February 12, 2021, 16:38 Fernando Maldonado      FailedFEBIAD parameter scan - efficiency measurements - energy spread.Friday, February 12, 2021, 16:37: FEBIAD
installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38:
  
  851   Tuesday, February 16, 2021, 14:52 Fernando Maldonado      Problems/SolutionsLeak checking gas lines.Vacuum side
Tuesday, February 16, 2021, 13:42:
The gas lines inside have been check. The
  
  852   Thursday, February 18, 2021, 10:47 Aaron Schmidt       Optics loss / CANBUS failure.Thursday, February 18, 2021, 10:45: TPS:Q3
& the TSB CBC CANBUS controllers had
failed yesterday, as well as a cable was
  
  853   Thursday, February 18, 2021, 11:03 Aaron Schmidt      Problems/SolutionsDI water pump configurationhttps://elog.triumf.ca/TIS/Test-Stand/847
There was a previous DI CU-LCW 
pump trip as per the above elog. The CU-LCW
  
  854   Thursday, February 18, 2021, 15:15 Fernando Maldonado      DoneHLA testsThursday, February 18, 2021, 15:01: With
the help of Spencer Kiy, we tested the proper
communication from python to epics.
  