|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
|
733
|
Wednesday, June 19, 2019, 17:25 |
Fernando Maldonado | | | | | | | Done | Thermocouple connection | Wednesday, June 19, 2019, 17:13 Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
|
|
736
|
Monday, June 24, 2019, 15:41 |
Fernando Maldonado | | | | | | | Problems/Solutions | TMS:Q3 polarity | Monday, June 24, 2019, 15:25: Current quadrupole polarities:
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Negative |
Positive |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
Monday, June 24, 2019, 15:35 : The polarity on TMS:Q3 is reversed. The top and bottom poles should be at a positive voltage similar to TMS:Q4, however a negative tagged cable is connected to it.
Monday, June 24, 2019, 15:39 : Swapping the cables on TMS:Q3.
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Positive |
Negative |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
|
|
737
|
Tuesday, June 25, 2019, 17:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Burnt cables on top of the test stand | Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Attachment 1: 20190625_154015.jpg
|
|
Attachment 2: 20190625_153834.jpg
|
|
Attachment 3: 20190625_165001.jpg
|
|
|
740
|
Thursday, June 27, 2019, 09:51 |
Fernando Maldonado | | | | | | | Problems/Solutions | Melted cables changed | See elog 737
Fernando Maldonado wrote: |
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Thursday, June 27, 2019, 09:45: The cables showing burnt marks were changed with new ones on Wednesday 26th. The grounding cables were insulated with yellow heatshrink. The anode wire connection was redone. |
|
741
|
Tuesday, July 02, 2019, 18:25 |
Fernando Maldonado | | | | | | | Done | Blank on FEBIAD gas line installed | Tuesday, July 02, 2019, 18:24: A blind is installed on the FEBIAD gas line (see attached picture) to rule out the possibility of gases entering the TIS. |
Attachment 1: 20190702_182254.jpg
|
|
|
743
|
Thursday, July 04, 2019, 15:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | TBHT insulator changed | Thursday, July 04, 2019, 15:00: TBHT insulator was swapped out on the source tray side.
The old one is very chipped. |
|
747
|
Friday, July 19, 2019, 13:48 |
Fernando Maldonado | | | | | | | Problems/Solutions | RMP0A and FC6 gains signal redirection to another channel | After submitting a fault report (FR - ISAC Fault 12461) a Work Permit was issued (WP - C2019-07-19-1),
Controls tunnel the faulty signal to another ADC by removing signal no longer used at the Test Stand.
Test successful with a constant current power supply in the range 1 nA-40 nA.
TBD: does this work with beam? |
|
752
|
Wednesday, August 07, 2019, 15:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Test stand inspection | Wednesday, August 07, 2019, 15:12: Arthur helped inspected the electric connections on the TS.
One of the coil positive waterlines was touching a HS waterline. Manually adjusted them to have a better clearance.
|
|
753
|
Thursday, August 08, 2019, 09:12 |
Aaron Schmidt | | LP-FEBIAD | | | | 42752-7 | In progress | P2N Setup - LP-FEBIAD target | Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil / TGHT connections were added.
Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.
-Heat the TGHT only, observe, then ramp down.
-Heat Coil only, observe, then ramp down.
-Heat TGHT w/ Coil, observe, then ramp down.
Note* Heating should be even across the target. Elog & take pictures.
NO HV ALLOWED!!!!
Thursday, August 08, 2019, 09:05: Roughing.
Thursday, August 08, 2019, 09:14: BV1A closed to allow pressure stabilization. Opened about within 2 seconds later with BV1B.
Thursday, August 08, 2019, 09:41: Turbo pumps on.
Thursday, August 08, 2019, 09:47: Ion gauge on.
Thursday, August 08, 2019, 10:37: RGA on.
TSG:CG1A & TSG:CG1B do not appear to be pumping down efficiently - May need to swap out TSG:RP1 after this test. Last done April 18, 2018. elog: 655.
Friday, August 09, 2019, 08:49: Power on.
Friday, August 09, 2019, 08:51: Waterlines opened. No response on RGA. Vacuum ok @ 3.03e-06T
Friday, August 09, 2019, 08:56: Auto-ramping TGHT @ 4 @ per min to 150 A.
Friday, August 09, 2019, 10:10: Ramping the TGHT down from 150 A to 0A.
Friday, August 09, 2019, 10:39: Anode Current @ 200 mA w/ 19V? Anode PS on. Voltage & current dropped off.
Friday, August 09, 2019, 11:18: TGHT and TBHT power supplies ramped to 150A each, total of 300A in the target
Friday, August 09, 2019, 13:12: Target glows symmetrically. TGHT and TBHT ramped from 150A to 200A each for a total of 400A on the target
Friday, August 09, 2019, 14:05: RGA error.
Friday, August 09, 2019, 14:08: RGA Restarted.
Friday, August 09, 2019, 14:08: Target heating evenly on total 400 A.
Friday, August 09, 2019, 15:57: Auto-ramping TGHT/TBHT @ 4 @ per min to 250/250 A.
Friday, August 09, 2019, 16:28: Vacuum limit reach at 241 and 238 A for TGHT and TBHT, respectively.
Friday, August 09, 2019, 16:28: Auto-cooling started at 4A/min
Monday, August 12, 2019, 09:22: Sources off. RGA off.
Monday, August 12, 2019, 10:04: Power off. Ion gauge off. Turbos off. |
Attachment 1: 20190808_085752.jpg
|
|
Attachment 2: 20190808_085758.jpg
|
|
Attachment 3: 20190809_135736.jpg
|
|
Attachment 4: 20190809_135747.jpg
|
|
Attachment 5: 20190809_135820.jpg
|
|
Attachment 6: Aug_2019_test_target_-_P2N_-_LP-FEBIAD_setup.docx
|
Attachment 7: TS-2019-08-08-10-37.rga
|
Attachment 8: TS-2019-08-09-14-07.rga
|
|
754
|
Tuesday, August 13, 2019, 12:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace RP1 | Tuesday, August 13, 2019, 11:55: Close PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: RP1 replaced.
Tuesday, August 13, 2019, 13:24: TS exhaust / screen cleaned out.
Tuesday, August 13, 2019, 13:25: RP1 on
Tuesday, August 13, 2019, 13:59: Turbo pumps on.
Tuesday, August 13, 2019, 14:05: IG1 on.
Wednesday, August 14, 2019, 09:17: Revising the archiver, on July 8th at around 4 am, the vacuum on GC1A increased from normal levels to around 0.2 T. This happened while the target was held at a high combined current from both TGHT PS and Coil PS. See screenshots attached.
Thursday, August 15, 2019, 09:57: Vacuum is only around 1.06e-06T. Turbo pumps off. Ion gauge off.
Tuesday, August 20, 2019, 08:59: Ion gauge acting funny. CG1A unplugged & re-plugged in. Seems to work now? |
Attachment 1: vac.PNG
|
|
Attachment 2: curr.PNG
|
|
|
755
|
Thursday, August 15, 2019, 16:33 |
Fernando Maldonado | | | | | | | Problems/Solutions | 9-pin connection modification | Thursday, August 15, 2019, 16:17: Q FT undone to remove the connection to the 9-pin
The idea is to change the cables to have individual signals. This will allow 4 thermocouple readings.
NB: The FT is not vacuum tight as of now (gasket needs to be replaced and flange needs to be tight) |
|
756
|
Thursday, August 29, 2019, 14:47 |
Fernando Maldonado | | | | | | Ferran's heat shield | Problems/Solutions | Rewiring-Baking out | Thursday, August 29, 2019, 14:47 : Changing back to the nominal wiring
Thursday, August 29, 2019, 17:01: TIS changed to Ferran's heat shield.
Thursday, August 29, 2019, 17:02: 9-pin FT redone.
Friday, August 30, 2019, 00:28: Turbos on
Friday, August 30, 2019, 00:36: IG1 on.
Tuesday, September 03, 2019, 09:09: RGA on. Vacuum stable @ 2.1e-6T
Tuesday, September 03, 2019, 15:00. Wire redone. Crosschecked by Arthur Leung.
Tuesday, September 03, 2019, 15:16: Turbos tripped. TSG:CG1A above 50 mTorr
Wednesday, September 04, 2019, 09:34 : Turbos on. After the bakeout it will be better to have TSG:CG1A checked.
Wednesday, September 04, 2019, 09:43: IG1 on
Wednesday, September 04, 2019, 09:45: RGA on
Wednesday, September 04, 2019, 12:42 : Waterlines opened. No response on RGA. Vaccum stable @ 3.1e-6 T
Wednesday, September 04, 2019, 14:53 : Auto-ramping TGHT / TBHT to 100/ 100 A @ 4 A/min.
Wednesday, September 04, 2019, 16:04: Auto-ramping TGHT / TBHT to 250/ 250 A @ 4 A/min.
Wednesday, September 04, 2019, 17:33: Final auto-ramping of the day TGHT / TBHT to 290/ 290 A @ 4 A/min. Vacuum stable@2.7e-7T
NB: Ferran's HS doesn't have an extraction electrode. Since the purpose of the heating is to "baked-out" the system, this is actually great as the shine will go downstream the beamline.
Thursday, September 05, 2019, 08:05: Auto-ramping TGHT to 580 A @ 2 A/min. Vacuum stable @2.97e-7T
Thursday, September 05, 2019, 09:30: TGHT PS is voltage-limited @440A and 5.2V. Stopping auto-ramping to increase the voltage limit to 7.7 (from previous screenshots).
Thursday, September 05, 2019, 09:31: Auto-ramping TGHT to 580A @ 2A/min.
Wednesday, May 15, 2019, 08:58: Optics/ HV on.
Monday, September 09, 2019, 16:05: Optics set. IV4 open.
Monday, September 09, 2019, 17:26: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Twenty minutes w/o sparks
Monday, September 09, 2019, 17:52 Optics/HV off
Tuesday, September 10, 2019, 10:05: Auto-cooling 4A/min
Tuesday, September 10, 2019, 13:27: IV4 closed.
Tuesday, September 10, 2019, 13:27: IG1 off. RGA off
Tuesday, September 10, 2019, 13:28: Turbos off
Wednesday, September 11, 2019, 09:21: Venting.
Wednesday, September 11, 2019, 09:24 HS waterline purged
Wednesday, September 11, 2019, 10:54: Cleaned the interior of chamber with methanol and Kim-wipes. Some dust and debris were removed with
Wednesday, September 11, 2019, 10:54 : Adding EE to the Assy.
Wednesday, September 11, 2019, 11:03: Roughing.
Wednesday, September 11, 2019, 11:35: Turbos on
Wednesday, September 11, 2019, 11:47: Turbos at speed.
Wednesday, September 11, 2019, 11:48: IG1 on
Wednesday, September 11, 2019, 11:54: RGA on
Friday, September 13, 2019, 08:56: RGA off. IG1 off.
Friday, September 13, 2019, 08:56: Turbos off
Monday, September 16, 2019, 08:11: Venting
Monday, September 16, 2019, 09:58: Assembly removed. |
|
757
|
Monday, September 16, 2019, 10:05 |
Fernando Maldonado | | | | | | | Problems/Solutions | Alignment pin reinstalled | Monday, September 16, 2019, 10:03: The rightmost alignment pin has been reinstalled (see picture attached). It was previously removed for Ferran's test. |
Attachment 1: 20190916_095937.jpg
|
|
|
759
|
Thursday, September 26, 2019, 11:30 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace CANBUS board TSG:CB1 | Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced.
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful. |
|
760
|
Friday, September 27, 2019, 11:54 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-6 | | Conditioning UC#(29) HS | Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53: Roughing.
Friday, September 27, 2019, 13:14: Turbo pumps on.
Friday, September 27, 2019, 13:20: Ion gauge on.
Friday, September 27, 2019, 13:24: RGA on.
Monday, September 30, 2019, 07:30: Waterlines Opened. No response on RGA. Vacuum ok @ 5.39e-07T.
Monday, September 30, 2019, 07:34: Power / Sources on.
Monday, September 30, 2019, 07:35: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, October 01, 2019, 14:29: Auto-Cooling TGHT @ 2A per min.
Wednesday, October 02, 2019, 08:24: Power / sources off.
Wednesday, October 02, 2019, 08:25: RGA off.
Wednesday, October 02, 2019, 08:26: Ion gauge & Turbo pumps off.
Wednesday, October 02, 2019, 12:50: Venting & Waterlines purged. |
|
761
|
Wednesday, October 02, 2019, 13:42 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Conditioning UC#(30) HS | Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13: Turbo Pumps started.
Wednesday, October 02, 2019, 14:19: Ion gauge on.
Wednesday, October 02, 2019, 14:24: RGA on.
Thursday, October 03, 2019, 07:35: Waterlines opened. No response on RGA. Vacuum ok @ 7.53e-07T
Thursday, October 03, 2019, 07:37: Power / Sources on.
Thursday, October 03, 2019, 07:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 04, 2019, 14:53: Auto-cooling @ 2 A per min.
Wednesday, October 16, 2019, 10:17: RGA off.
Wednesday, October 16, 2019, 10:19: Power / Sources off. IG1 off. Turbo pumps off. |
Attachment 1: UC#30.docx
|
|
763
|
Wednesday, October 23, 2019, 09:51 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak in Magnet PS | Wednesday, October 23, 2019, 09:50:
Fault: 12797
WP: C2019-10-23-2
ISAC test stand power supply MB-1 leak.
Water can be seen underneath and behind power supply cabinet. Repairs as per WP.
Friday, October 25, 2019: Power supply operational. AM |
|
764
|
Friday, October 25, 2019, 12:04 |
Anders Mjos | | | | | | | Problems/Solutions | ISG:TP1A found stopped | Restarted TP. Note that CG1A is above 50 mTorr. CG1B shows 15 mTorr |
|
765
|
Monday, October 28, 2019, 09:24 |
Fernando Maldonado | | | | | | | Problems/Solutions | TSG:CG1A checked with local reader | Monday, October 28, 2019, 09:22: The local reader indicated 42 mTorr while EPICS showed 51mTorr.
CG1B showed 8.9mTorr while EPICS shows 14mTorr.
After reconnecting CG1A, EPICS shows 16mTorr. Anthony suggest replacing the gauge. |
|
766
|
Wednesday, October 30, 2019, 14:50 |
Fernando Maldonado | | | | | | | Problems/Solutions | Cathode bias mode configuration | Wednesday, October 30, 2019, 14:49: John C. changed the polarity of the anode power supply to negative, and Fernando M. rewired the cabling on the service cap. |
|