Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 40 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgasCheck achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in.
 Empty_Chamber_-_Silver_bolts_removed.docxTS-2017-12-12-09-00.rgaTS-2017-12-13-06-50.rga 
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut DownPower/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07:
  
  621   Monday, January 22, 2018, 09:04 Aaron Schmidt      DonePower outage & Controller replacement.Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. 
  
  622   Friday, January 26, 2018, 11:10 Aaron Schmidt      DoneHelium tank replacementFriday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank
  
  623   Friday, January 26, 2018, 13:59 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 1Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06:
 2018_HV_test_1.docx 
  624   Monday, January 29, 2018, 10:07 Aaron Schmidt LP-SIS  (Blank)42752-3DonePower outage / HV test 2HV test 2 cancelled.  9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly)
 2018_HV_test_2.docx 
  625   Tuesday, January 30, 2018, 06:51 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 3Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52:
 2018_HV_test_3.docx 
  626   Wednesday, January 31, 2018, 09:53 Aaron Schmidt    (Blank)42752-3DoneWire moved.Wednesday, January 31, 2018, 09:50: A wire
(B - F) was too close (Almost touching) to
the EZL and had visible sparks during HV
  
  627   Wednesday, January 31, 2018, 12:58 Aaron Schmidt LP-SIS  (Blank)42752-3In progressHV test 4Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58:
 2018_HV_test_4.docx 
  628   Monday, February 05, 2018, 09:17 Aaron Schmidt      Problems/SolutionsEpics lossMonday, February 05, 2018, 09:10: the epics
program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
  
  629   Wednesday, February 07, 2018, 08:46 Aaron Schmidt       BIAS Power supply installationWednesday, February 07, 2018, 08:40: A
75 kV Glassman power supply was installed
in the rack for use in further HV testing.
 BIAS_PS_off_top_switch.jpgBIAS_PS_70kV_rear_bottom.jpgBIAS_PS_70kV_Front_bottom.jpg 
  639   Friday, February 23, 2018, 08:50 Aaron Schmidt       New Al Corona Friday, February 23, 2018, 08:50    
  641   Wednesday, February 28, 2018, 11:50 Aaron Schmidt       HV Test NpNew parts installed. Corona Shield, brackets,
and board/spark gap orientation.
Wednesday, February 28, 2018, 11:48:
 2018_HV_test_Np.docx 
  646   Monday, March 12, 2018, 10:07 Aaron Schmidt       HV Test w-gasMonday, March 12, 2018, 09:45: Gas lines
opened. Leak rate set. Vacuum @ 1.16e-06T
Monday, March 12, 2018, 10:00: RGA
  
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  649   Friday, March 16, 2018, 08:15 Aaron SchmidtNb#8HP-SISITWTM238817-242738-12In progressConditioning Nb#08Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started.
 6x 
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issueTuesday, March 20, 2018, 09:11: TMS:Q5
& TMS:Q2 controllers require repair.
Unable to hold a negative voltage.
  
  653   Wednesday, April 11, 2018, 10:19 Aaron Schmidt       Pump down empty chamberWednesday, April 11, 2018, 10:19: Roughing   
  654   Tuesday, April 17, 2018, 09:59 Aaron Schmidt LP-FEBIAD  41790-9  Test FEBIADNew assembly & target. Same silver
bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
  
  655   Tuesday, April 17, 2018, 11:02 Aaron Schmidt      DoneRoughing pump issue.Tuesday, April 17, 2018, 10:57: Vacuum
not coming down. @ 1.514T . Backing valves
have been closed.
  
ELOG V2.9.2-2455