Friday, January 26, 2018, 13:59, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 1
|
Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.
Spark at BIAS 30 kV and 40kV
Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.
Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.
Audible sparks, but none showing on the strip tool.
Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.
Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.
Sparks observed on EE feed through in cage.
Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.
Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.
Bias controls 55 kV Actual @ 50 kV.
Friday, January 26, 2018, 14:44: Spark free 5 min.
Friday, January 26, 2018, 14:49: Spark free 10 min. |
Monday, January 29, 2018, 10:07, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Power outage / HV test 2
|
HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS
Monday, January 29, 2018, 10:07:Turbos on.
Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T
Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.
Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.
Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.
Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.
Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.
Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.
Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.
SPARKS*
Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.
Sparks
Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.
Monday, January 29, 2018, 14:03: Holding.
Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.
Monday, January 29, 2018, 14:14: Spark*
Monday, January 29, 2018, 14:45: Holding
Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete |
Tuesday, January 30, 2018, 06:51, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 3
|
Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set
Tuesday, January 30, 2018, 06:59: IV4 opened.
RGA switched completely off and unplugged.
Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2
Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5
Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.
Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8
15 minute wait. No sparks.
Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1
Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1
Tuesday, January 30, 2018, 14:35: No sparks.
Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0
Tuesday, January 30, 2018, 15:06: Auto-cooling started.
Wednesday, January 31, 2018, 06:59: Power/sources off.
|
Wednesday, January 31, 2018, 09:53, Aaron Schmidt, , , , , (Blank), 42752-3, Done, Wire moved.
|
Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire was adjusted to sit higher. and away from the EZL |
Wednesday, January 31, 2018, 12:58, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, HV test 4
|
Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:05: BIAS / EZL / EE @ 50 / 22 / 2.5
Wednesday, January 31, 2018, 13:08: BIAS / EZL / EE @ 55 / 24 / 2.8
Wednesday, January 31, 2018, 13:10: BIAS / EZL / EE @ 57.5 / 27 / 3.0
Wednesday, January 31, 2018, 13:14: BIAS / EZL / EE @ 60 / 28 / 3.1
Wednesday, January 31, 2018, 13:34: No Sparks.
Wednesday, January 31, 2018, 14:14: No sparks after one hour.
Wednesday, January 31, 2018, 14:44: Spark free at 1-1/2 hours.
Wednesday, January 31, 2018, 14:45: Bringing down voltage.
Wednesday, January 31, 2018, 14:56: BIAS / EZL / EE @ 0
Wednesday, January 31, 2018, 14:57: Sources off. |
Monday, February 05, 2018, 09:17, Aaron Schmidt, , , , , , , Problems/Solutions, Epics loss
|
Monday, February 05, 2018, 09:10: the epics program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
Monday, February 05, 2018, 09:16: Restart Turbo pumps on chamber & beamline.
Monday, February 05, 2018, 09:21: Ion gauges on.
Tuesday, February 06, 2018, 09:00: TSG:CB1 noted to be red. Attempts to restart/reconfigure failed. Alive displays red MAJOR. Fault submitted. |
Wednesday, February 07, 2018, 08:46, Aaron Schmidt, , , , , , , , BIAS Power supply installation
|
Wednesday, February 07, 2018, 08:40: A 75 kV Glassman power supply was installed in the rack for use in further HV testing.
-The 75kV power supply is linked into the keyed interlock system. The key & switch labelled BIAS/EZL will unlock it.
-The PS is currently not connected to the epics controls and can only be adjusted manually.
-The old Glassman supply is disconnected and removed from the cage. |
Friday, February 23, 2018, 08:50, Aaron Schmidt, , , , , , , , New Al Corona
|
Friday, February 23, 2018, 08:50
Friday, February 23, 2018, 08:53: BIAS / EZL / EE @ 62.5 / 29 / -1 kV
Friday, February 23, 2018, 08:56: Spark* Turbo pump TMS:TP6 restarted,
Friday, February 23, 2018, 09:13: Bias sitting at 61kV for about 15mins now. Still corona discharges from the area of the EE, but the area of the duct seems fine. |
Wednesday, February 28, 2018, 11:50, Aaron Schmidt, , , , , , , , HV Test Np
|
New parts installed. Corona Shield, brackets, and board/spark gap orientation.
Wednesday, February 28, 2018, 11:48: Power on. Ready to test
Wednesday, February 28, 2018, 14:00: BIAS / EZL / EE @ 30 / 13 / 1.5 kV
Wednesday, February 28, 2018, 14:06: BIAS / EZL / EE @ 40 / 17 / 2.0 kV
Wednesday, February 28, 2018, 14:11: BIAS / EZL / EE @ 55 / 24 / 2.8 kV
Wednesday, February 28, 2018, 14:16: BIAS / EZL / EE @ 60 / 28 / 3.1 kV
Wednesday, February 28, 2018, 14:18: BIAS / EZL / EE @ 62 / 30 / 3.2 kV
Wednesday, February 28, 2018, 14:21: BIAS / EZL / EE @ 63 / 31 / 3.2 kV
Wednesday, February 28, 2018, 14:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV
Wednesday, February 28, 2018, 14:32: BIAS / EZL / EE @ 66 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:35: BIAS / EZL / EE @ 66.5 / 33.5 / 3.3 kV ***2 sparks***
Wednesday, February 28, 2018, 14:37: BIAS / EZL / EE @ 66 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:41: BIAS / EZL / EE @ 66.5 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:44: BIAS / EZL / EE @ 67 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:47: BIAS / EZL / EE @ 68 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:49: BIAS / EZL / EE @ 68.75 / 33 / 3.3 kV ***Spark***
Wednesday, February 28, 2018, 14:51: BIAS / EZL / EE @ 68 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:57: *** 2 sparks ***
The BIAS was pushed to 69 kV however the resulting sparks shut down the communications with the test stand computer.
RPM0B was put into a continuous running cycle and had to be shut off manually.
The voltage was brought back down remotely via a separate computer. Turbo pump TMS : TP2 was also restarted. |
Monday, March 12, 2018, 10:07, Aaron Schmidt, , , , , , , , HV Test w-gas
|
Monday, March 12, 2018, 09:45: Gas lines opened. Leak rate set. Vacuum @ 1.16e-06T
Monday, March 12, 2018, 10:00: RGA on
Monday, March 12, 2018, 10:07: RGA off. Manually shut off power as well |
Tuesday, March 13, 2018, 06:00, Aaron Schmidt, UC#22, LP-SIS, ITE, TM4, , , In progress, Conditioning Heat Shield for UC#22
|
Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo Pumps started.
Tuesday, March 13, 2018, 09:15: Ion gauge on.
Tuesday, March 13, 2018, 10:17: RGA started.
Tuesday, March 13, 2018, 13:15: Check Vacuum @ 6.56e-07T
Wednesday, March 14, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum ok @ 2.69e-07T
Wednesday, March 14, 2018, 07:30: Power/sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.7 |
3.61 |
TBHT |
21.4 |
2.82 |
COIL + EE |
21.5 |
4.64 |
TGHT |
21.7 |
5.23 |
Wednesday, March 14, 2018, 07:35: Auto ramping TGHT to 580 A @ 2A per min.
Wednesday, March 14, 2018, 13:18: Vacuum ok @ 5.48e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.6 |
3.72 |
TBHT |
22.5 |
2.86 |
COIL + EE |
22.6 |
4.75 |
TGHT |
24.9 |
5.08 |
Wednesday, March 14, 2018, 13:29: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV.
BIAS current: 40uA
EZL current: 49uA
EE current: 518uA
Thursday, March 15, 2018, 08:00: Check, Vacuum @ 4.76e-07T
Thursday, March 15, 2018, 13:19: Check, Vacuum @ 4.65e-07T
Thursday, March 15, 2018, 15:13: Started cool down. Vacuum at 4.76e-7 by AM
Friday, March 16, 2018, 06:24: Power/sources off.
Friday, March 16, 2018, 06:27: Waterlines purged
Friday, March 16, 2018, 06:28: RGA, ion gauge, and turbos off.
Friday, March 16, 2018, 07:57: Venting.
|
Friday, March 16, 2018, 08:15, Aaron Schmidt, Nb#8, HP-SIS, ITW, TM2, 38817-2, 42738-12, In progress, Conditioning Nb#08 6x
|
Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo pumps started.
Friday, March 16, 2018, 10:40: Ion gauge on.
Friday, March 16, 2018, 10:45: RGA on.
Friday, March 16, 2018, 13:10: Check. Vacuum @ 7.37e-7T
Monday, March 19, 2018, 06:44: Waterlines opened: Vacuum stable @ 2.16e-07T
Monday, March 19, 2018, 06:46: Power/sources on.
Monday, March 19, 2018, 06:49: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.6 |
3.68 |
TBHT |
22.2 |
2.97 |
COIL + EE |
21.4 |
4.73 |
TGHT |
21.5 |
5.39 |
Monday, March 19, 2018, 06:51: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Monday, March 19, 2018, 06:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, March 19, 2018, 07:02: Optics on & reset.
Monday, March 19, 2018, 10:53: Drops in BIAS voltage from 30kV to below 22.5 kV and spikes to the BIAS current (282 uA) observed. Unstable.
Monday, March 19, 2018, 12:56: Communications issue noted with the mass separator magnet. Increase in Amp achieves no change in Gauss. Kyle L notified.
TMS:HALLMB1:RDFIELD Communication error.
Monday, March 19, 2018, 14:00: MB1 Communication error fixed. However the negative voltage on Q2 & Q5 in unavailable.
Monday, March 19, 2018, 15:07: Auto cooling TGHT / TBHT to 500 / 150 A @ 6A/4A per min.
Monday, March 19, 2018, 15:17: Auto cooling halted. TGHT / TBHT @ 501 / 152 A. Manually put to 500 / 150 A.
Controller for TMS:Q5 & TMS:Q2 off for repair.
Tuesday, March 20, 2018, 09:09: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, March 20, 2018, 12:58: The controller was fixed. Nb#08 conditioning continues with tests.
Wednesday, March 21, 2018, 06:24: Auto-cooling @ 2A per min.
Wednesday, March 21, 2018, 11:23: Sources at 0. Off.
Wednesday, March 21, 2018, 11:29: Power off. Waterlines purged.
Wednesday, March 21, 2018, 11:32: RGA off. IV4 closed/reset.
Wednesday, March 21, 2018, 11:33: Ion gauge off. Turbos off.
Wednesday, March 21, 2018, 13:15: Venting. |
Tuesday, March 20, 2018, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Optics issue
|
Tuesday, March 20, 2018, 09:11: TMS:Q5 & TMS:Q2 controllers require repair. Unable to hold a negative voltage.
+ @ 680V
- @ 0V (Should be 680V as well)
Kyle L. & Rod N notified.
Tuesday, March 20, 2018, 12:58: The controller was fixed. |
Wednesday, April 11, 2018, 10:19, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, April 11, 2018, 10:19: Roughing |
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
See* elog entry for roughing pump issue 04/17/2018
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
Friday, April 20, 2018, 13:45: Power/sources on. RGA restarted
Friday, April 20, 2018, 13:46: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.1 |
3.61 |
TBHT |
24.2 |
2.80 |
COIL + EE |
23.9 |
5.06 |
TGHT |
24.1 |
5.72 |
Friday, April 20, 2018, 13:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, April 20, 2018, 13:56: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark @ Bias 28 kV knocked out RGA.
Friday, April 20, 2018, 13:59: RGA restarted.
Friday, April 20, 2018, 14:03: Optics on. Set
Friday, April 20, 2018, 14:40: Auto cooling TGHT / TBHT from 97 A @ 4A per min. Odd noise on (BIAS*) PS
Friday, April 20, 2018, 14:44: BIAS / EZL / EE @ 0 / 0 / 0 kV . Sources being turned off except TBHT and TGHT.
Monday, April 23, 2018, 10:46: FEBIAD TEST halted. See BIAS PS issue.
Tuesday, April 24, 2018, 10:46: Power off.
Tuesday, April 24, 2018, 10:48: RGA off.
Tuesday, April 24, 2018, 10:49: Ion gauge TSG:IG1 & Evap side turbos off,
Tuesday, April 24, 2018, 10:50: Ion gauge TMS:IG6 & beam side turbos off.
Tuesday, April 24, 2018, 10:54: Waterlines purged.
|
Tuesday, April 17, 2018, 11:02, Aaron Schmidt, , , , , , , Done, Roughing pump issue.
|
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
TSG:CG1A @ 1.515T
TSG:CG1B @ 1.529T.
Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.
Vacuum group notified.
Wednesday, April 18, 2018: Replace pump & adapters. Clean.
Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A & BV1B
Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
RP status ok.
Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T |
Wednesday, April 25, 2018, 09:50, Aaron Schmidt, Ta (test), LP-SIS, , , 41177-3, , In progress, Ta test and window change
|
Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.
Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.
Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.
Wednesday, April 25, 2018, 10:49: Both Ion gauges on.
Wednesday, April 25, 2018, 14:56: RGA on.
Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T
Thursday, April 26, 2018, 06:56: Power/sources on.
Thursday, April 26, 2018, 07:00: Auto ramping TGHT to 300 @ 2A per min.
Thursday, April 26, 2018, 07:05: IV4 opened.
Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.
Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.
Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.
Monday, April 30, 2018, 07:05: IV4 closed, RGA off.
Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.
Monday, April 30, 2018, 11:00: Venting. Purging water lines. |
Monday, April 30, 2018, 12:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test ready
|
Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo pumps on.
Monday, May 07, 2018, 15:02: RGA, ion gauge, and turbo pumps off. |
Tuesday, May 08, 2018, 10:36, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, C-seal Test
|
2 C-Seals installed with SS springs on water blocks. The SS springs are also used in the module.
Long pkg seal (A):
T: 0.098" x 0.429" Diameter.
Installed on line FS#5 , Block L, Heat shield cooling block. (Top seal, bottom seal of 2 is still the rubber O-ring)
Short pkg seal (B):
T: 0.095" x 0.424" Diameter.
Installed on line FS#3 , Block G, Coil cooling block.
All the waterlines are purged and shut. Open individually and monitor for leaks.
Tuesday, May 08, 2018, 10:27: Roughing
Tuesday, May 08, 2018, 10:31: Both BV1A & BV1B are open.
Tuesday, May 08, 2018, 10:57: Turbo Pumps started.
Tuesday, May 08, 2018, 11:03: Ion gauge on.
Tuesday, May 08, 2018, 11:15: RGA started.
Tuesday, May 08, 2018, 13:30: Vacuum @ 3.14e-06T
Wednesday, May 09, 2018, 06:48: Vacuum 5.13E-07T. RGA ok.
Wednesday, May 09, 2018, 06:50: Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Valve to chamber opened. LD connection clear.
LD: 1.3e-08 atm-cc/sec
He TEST:
Wednesday, May 09, 2018, 07:00: Purge both lines with He. Do not pressurize.
Vacuum @ 5.13e-07T. RGA status:
Water @ 3.22e-007
He:-1.93e-009
LD: 1.3e-08 atm-cc/sec
Wednesday, May 09, 2018, 07:15: Open line FS#5 to heat shield. Pressurize to 30 PSI.
Wednesday, May 09, 2018, 07:40: Vacuum @ 5.02e-07T. RGA status:
Water @ 3.13e-007
He:-1.67e-009
LD: 9.3e-08 atm-cc/sec. Purge and close FS#5.
Wednesday, May 09, 2018, 07:45: Open line FS#3 to Coil block. Pressurize to 30 PSI.
08:10: Vacuum @ 4.9e-07T. RGA status:
Water @ 3.08e-007
He:-1.61e-009
LD: 1.5e-07 atm-cc/sec
Wednesday, May 09, 2018, 08:15: Depressurize lines. Connect HPA.
Wednesday, May 09, 2018, 08:20: Vacuum @ 4.76e-07T. RGA status:
Water @ 3.05e-007
He:-1.68e-009
LD: 1.7e-07 atm-cc/sec
08:25: LD: 1.7e-07 atm-cc/sec. Close Valve & disconnect LD
Water & Cycling TEST:
Wednesday, May 09, 2018, 08:45: Vacuum @ 4.67e-07T. RGA status:
Water: 3.02e-007
Open lines FS#2 and FS#4
Wednesday, May 09, 2018, 08:55: Vacuum @ 4.65e-07T. RGA status: Water @ 2.97e-007
Close lines FS#2 and FS#4. Water filled.
Open line FS#5 to heat shield. Vacuum and RGA ok.
09:00: Begin C-Seal (A) shock cycling. 20 cycles @ 5 min apart.
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
09:00 |
4.65e-07 |
2.94e-007 |
09:50 |
4.58e-07 |
2.87e-007 |
09:05 |
4.58e-07 |
2.93e-007 |
09:55 |
4.58e-07 |
2.88e-007 |
09:10 |
4.58e-07 |
2.93e-007 |
10:00 |
4.58e-07 |
2.87e-007 |
09:15 |
4.65e-07 |
2.92e-007 |
10:05 |
4.56e-07 |
2.87e-007 |
09:20 |
4.65e-07 |
2.92e-007 |
10:10 |
4.56e-07 |
2.85e-007 |
09:25 |
4.65e-07 |
2.90e-007 |
10:15 |
4.56e-07 |
2.86e-007 |
09:30 |
4.65e-07 |
2.89e-007 |
10:20 |
4.49e-07 |
2.83e-007 |
09:35 |
4.56e-07 |
2.89e-007 |
10:25 |
4.49e-07 |
2.84e-007 |
09:40 |
4.65e-07 |
2.89e-007 |
10:30 |
4.49e-07 |
2.84e-007 |
09:45 |
4.58e-07 |
2.89e-007 |
10:35 |
4.47e-07 |
2.83e-007 |
Wednesday, May 09, 2018, 10:40: Close line FS#5. Vacuum @ 4.49e-07T. RGA status: Water @ 2.84e-007
Open line FS#3 to Coil block. Vacuum and RGA ok
10:45: Begin C-Seal (B) shock cycling. 20 cycles @ 5 min apart
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
10:45 |
4.47e-07 |
2.80e-007 |
11:35 |
4.32e-07 |
2.77e-007 |
10:50 |
4.47e-07 |
2.80e-007 |
11:40 |
4.38e-07 |
2.75e-007 |
10:55 |
4.47e-07 |
2.81e-007 |
11:45 |
4.38e-07 |
2.75e-007 |
11:00 |
4.38e-07 |
2.80e-007 |
11:50 |
4.38e-07 |
2.75e-007 |
11:05 |
4.38e-07 |
2.78e-007 |
11:55 |
4.38e-07 |
2.75e-007 |
11:10 |
4.40-e07 |
2.79e-007 |
12:00 |
4.40e-07 |
2.75e-007 |
11:15 |
4.38e-07 |
2.77e-007 |
12:05 |
4.38e-07 |
2.73e-007 |
11:20 |
4.47e-07 |
2.77e-007 |
12:10 |
4.40e-07 |
2.73e-007 |
11:25 |
4.40e-07 |
2.78e-007 |
12:15 |
4.30e-07 |
2.71e-007 |
11:30 |
4.38e-07 |
2.76e-007 |
12:20 |
4.32e-07 |
2.73e-007 |
12:25: Open FS#5 and leave FS#3 open. Status Vacuum @ 4.32e-07T . RGA status: Water @ 2.70e-007
13:00: Status Vacuum @ 4.30e-07T . RGA status: Water @ 2.67e-007
Wednesday, May 09, 2018, 14:24: Status Vacuum @ 4.21e-07T . RGA status: Water @ 2.52e-007
Thursday, May 10, 2018, 07:41: Status Vacuum @ 3.24e-07T . RGA status: Water @ 1.76e-007.
Purge all water from lines. Prep for He.
Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Thursday, May 10, 2018, 08:00: Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Vacuum @ 3.15e-07T . RGA status: Water @ 1.65e-007.
Valve to chamber opened. LD connection clear.
Leak rate: 1.6e-08 atm-cc/sec
He TEST #2:
Thursday, May 10, 2018, 08:13: Purge both lines with He. Do not pressurize.
Vacuum @ 3.15e-07T. RGA status:
Water @ 1.76e-007
He: -1.51e-009
LD: 1.5e-08 atm-cc/sec
Thursday, May 10, 2018, 08:15: Open line FS#3 to Coil Block. Pressurize to 30 PSI.
Thursday, May 10, 2018, 08:40: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.80e-007
He:-1.98e-009
LD: 7.1e-08 atm-cc/sec. Purge and close FS#3.
Thursday, May 10, 2018, 08:45: Open line FS#5 to Heat Shield. Pressurize to 30 PSI.
Thursday, May 10, 2018, 09:10: Vacuum @ 3.22e-07T. RGA status:
Water @ 1.79e-007
He:-1.39e-009
LD: 1.5e-07 atm-cc/sec
09:15: Depressurize lines. Connect HPA.
09:30: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.78e-007
He:-1.56-009
LD: 1.7e-07 atm-cc/sec
Thursday, May 10, 2018, 09:32: Close Valve & disconnect LD
Thursday, May 10, 2018, 09:35: Opened all waterlines completely. Vacuum stable @3.22e-07T and no response on the RGA.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
2.83 |
TBHT |
24.7 |
3.09 |
COIL + EE |
24.7 |
5.08 |
TGHT |
24.9 |
5.77 |
Tuesday, May 15, 2018, 06:06: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, May 15, 2018, 06:13: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, May 15, 2018, 06:17: Optics set. IV4 opened.
Tuesday, May 15, 2018, 08:35: RGA Restarted. Spikes noticed on BIAS current. Vacuum @ 2.57E-06T
Wednesday, May 16, 2018, 06:40: TMS:IG6 (between 3-4pm yesterday) and the RGA were both knocked out. Restarting both.
Wednesday, May 16, 2018, 06:48: Repeated attempts to reset/restart IG6 have failed. Closing IV4
Friday, May 18, 2018, 10:55: Auto-cooling @ 1A per min. IG6 still non-responsive. |
Monday, May 28, 2018, 08:46, Aaron Schmidt, , LP-FEBIAD, , TM2, 41790-9, 42752-5, In progress, New TM source tray swap out.
|
Monday, May 28, 2018, 08:45: Venting. Prep For removal.
Close FS#8. Clean up water
Adjust
Tuesday, May 29, 2018, 08:30: Test Stand source tray & Optics tray removed
Clean EZL on optics tray.
Tuesday, May 29, 2018, 11:30: New Source tray installed w/ Original TS optics tray. Connect.
Tuesday, May 29, 2018, 13:30: Roughing.
Tuesday, May 29, 2018, 14:38: Turbos on
Tuesday, May 29, 2018, 14:47: Ion gauge on.
Tuesday, May 29, 2018, 14:49: Exterior line FS# 8 opened.
Wednesday, May 30, 2018, 06:29: RGA on. Vacuum @ 3.38e-06T
He Leak TEST #1:
Vacuum Group Leak detector LD#2.
Friday, June 01, 2018, 08:30: Vacuum @ 9.15e-07T
LD Base line before opening valve to turbo pumps: 3.5e-10 atm-cc/sec
Friday, June 01, 2018, 08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec
Full open base:
Vacuum @ 3.24e-07T. RGA status:
Water @ 7.76e-007
He: -2.31e-009
LD: 2.6e-09 atm-cc/sec
Friday, June 01, 2018, 10:30: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T . RGA status:
Water @ 7.91e-007
He:-1.87e-009
LD: 2.8e-09 atm-cc/sec. Purge and close FS#2.
Friday, June 01, 2018, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.97e-007
He:-1.92e-009
LD: 3.0e-09 atm-cc/sec. Purge and close FS#3.
Friday, June 01, 2018, 11:00: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.21e-07T. RGA status:
Water @ 7.92e-007
He:-1.85e-009
LD: 4.7e-09 atm-cc/sec. Purge and close FS#4.
Friday, June 01, 2018, 11:15: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.919e-007
He:-1.81e-009
LD: 4.0e-09 atm-cc/sec. Purge and close FS#5
Friday, June 01, 2018, 11:30: Depressurize lines. Connect HPA & Purge all lines.
After 5 minutes: Vacuum @ 9.24e-07T . RGA status:
Water @ 7.87e-007
He:-1.86-009
LD: 4.6e-09 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Friday, June 01, 2018, 11:41: Open water supply and return mainlines. Vacuum @ 9.15e-07T.
Friday, June 01, 2018, 11:45: Open line FS#2. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:46: Open line FS#3. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:47: Open line FS#4. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:48: Open line FS#5. Vacuum ok. RGA ok.
Friday, June 01, 2018, 12:05: Power/sources switched on.
Friday, June 01, 2018, 12:11: Auto ramping TGHT / TBHT to 300 / 150 A @ 2A per min.
Friday, June 01, 2018, 12:53: Power bump. Lights flickered, however TS ok.
Friday, June 01, 2018, 12:58: Monitored for 5 minutes. ok.
Friday, June 01, 2018, 15:08: Auto ramping TGHT to 350 A @ 2A per min.
Monday, June 04, 2018, 07:27: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, June 04, 2018, 07:28: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, June 04, 2018, 07:30: Optics reset / Switched on. IV4 opened.
Monday, June 04, 2018, 10:00: FC0 GAIN on 1 uA = 1.65e-09. Wire scans no reading. Adjust steering.
Monday, June 04, 2018, 10:34: Anode @ 200V. Coil @ 10A.
Monday, June 04, 2018, 13:30: Optics tune changed with EZL off. Brad. S.
Monday, June 04, 2018, 13:45: Resetting tunes. COIL @ 50 A. Auto ramping TBHT to 300 A @ 2A per min. (310 A on read back)
Monday, June 04, 2018, 13:51: EZL / EE @ 13 / -1.5 kV.
Monday, June 04, 2018, 13:54: Optics reset to EZL on.
Tuesday, June 05, 2018, 08:00: RGA off.
Tuesday, June 05, 2018, 08:10: Auto ramping TBHT to 310 A @ 2A per min. (320 A on read back)
E-rig issue. Not scanning. Proceed with HV testing.
Tuesday, June 05, 2018, 09:00: BIAS / EZL / EE @ 35 / 15 / 1.75 kV.
Tuesday, June 05, 2018, 09:06: BIAS / EZL / EE @ 40 / 17.5 / 2 kV.
Tuesday, June 05, 2018, 09:13: Small spark knocked out optics & TMS:TP6
Tuesday, June 05, 2018, 09:21: IV4 closed/opened/reset. TP6 restarted.
Tuesday, June 05, 2018, 09:30: Spark*. Knocked out optics. Reset.
Tuesday, June 05, 2018, 10:37: BIAS / EZL / EE @ 45 / 19.5 / 2.25 kV.
Tuesday, June 05, 2018, 10:44: BIAS / EZL / EE @ 50 / 22 / 2.5 kV.
Tuesday, June 05, 2018, 10:47: Spark. Optics & CBC reset.
Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 11:35: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 12:46: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 13:06: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6. IV4 closed/opened/reset. Turbo/optics restarted. Magnet still off. Anode @ 200V (reads 9V, shorted)
Tuesday, June 05, 2018, 13:16: TBHT brought down to 300A. Anode brought to 0V.
Tuesday, June 05, 2018, 13:20: Attempted to bring up to 30V. (30 input) Actual: 8V & 50.061 mA. Possible short, post spark*
Tuesday, June 05, 2018, 13:47: Auto-cooling @ 2A/min
Tuesday, June 05, 2018, 13:56: BIAS / EZL / EE @ 50 / 22 / 2.5 kV. Continue down to 30 kV settings.
Tuesday, June 05, 2018, 14:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, June 06, 2018, 06:49: Anode still unresponsive cold. Short*
Wednesday, June 06, 2018, 11:09: Vacuum @ 4.30e-07T ok. Test EZL
Wednesday, June 06, 2018, 11:16: BIAS / EZL / EE @ 30 / 20 / 1.5 kV.
Wednesday, June 06, 2018, 11:20: BIAS / EZL / EE @ 30 / 25 / 1.5 kV.
Wednesday, June 06, 2018, 11:24: BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 11:30: Coil @ 0A.
Wednesday, June 06, 2018, 12:51: No sparks* BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 12:53: Move Steerers to zero.
TSG:CB1: 0V
TSG:VCB1: 0V
TSG:CBC(2): 0V
Increase each one to 1000V individually. Hold 5 minutes and bump back to zero on each.
Wednesday, June 06, 2018, 12:55: TSG:CB1: 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:01: TSG:VCB1: 0 - 1000V. Goes red @ 1000V, stays blue @ 999V Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:06: TSG:CBC(2): 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped. The magnet is back.
Wednesday, June 06, 2018, 13:50: Sources to 0V.
Wednesday, June 06, 2018, 14:05: IV4 closed. Turbo pumps off. Ion gauge off.
Wednesday, June 06, 2018, 14:08: Power to the sources off.
Thursday, June 07, 2018, 06:35: Venting & waterlines purged. |
|