|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
555
|
Tuesday, November 29, 2016, 11:20 |
Anders Mjos | | | | | | | Problems/Solutions | TSH:UHV1 remvoed | The variable leak rate valve will be used
for TM3 HV spark tests in TCS |
|
|
556
|
Wednesday, November 30, 2016, 07:25 |
Aaron Schmidt | | | | | | | | Camera Container test 3. | Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing. |
|
|
557
|
Wednesday, November 30, 2016, 10:16 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (Close off for holidays) | Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05:
Turbo pumps on. |
|
|
558
|
Tuesday, January 03, 2017, 08:27 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (Restart. Post holidays) | Tuesday, January 03, 2017, 08:26: TSG :
RP1 & TMS : RP2 restarted.
Wednesday, January 04, 2017, |
|
|
560
|
Thursday, January 19, 2017, 13:23 |
Anders Mjos | | | | | | | Problems/Solutions | TSH:UHV1 remvoed |
|
|
|
561
|
Friday, January 20, 2017, 08:45 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1A & TSG:BV1A tripped | Friday, January 20, 2017, 08:25: TSG :
TP1A and TSG : BV1A were noticed to be tripped
around 6am. |
|
|
562
|
Monday, January 23, 2017, 15:30 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Monday, January 23, 2017, 15:30: Roughing
Wednesday, January 25, 2017,
09:05: Venting |
|
|
563
|
Tuesday, January 24, 2017, 14:14 |
Aaron Schmidt | | | | | | | | Calibrated leak tanks removed | Tuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their |
|
|
564
|
Wednesday, January 25, 2017, 09:48 |
Aaron Schmidt | | | | | 41882-4 | 41751-6 | Done | Out gas Heat Shield for Target cleaning test | No EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in |
7x |
|
565
|
Wednesday, January 25, 2017, 14:54 |
Aaron Schmidt | | | | | 42218-9 | 41751-6 | Done | Target cleaning test HP-SIS CC Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
566
|
Wednesday, January 25, 2017, 14:55 |
Aaron Schmidt | | | | | 42218-6 | 41751-6 | Done | Target cleaning test (Long) HP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
567
|
Wednesday, January 25, 2017, 14:56 |
Aaron Schmidt | | | | | 42218-14 | 41751-6 | Done | Target cleaning test LP-SIS CC Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
568
|
Wednesday, January 25, 2017, 14:57 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Done | Target cleaning test LP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
569
|
Monday, February 06, 2017, 09:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage. | Weekend power outage. All turbos were tripped.
Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: |
|
|
570
|
Wednesday, February 15, 2017, 13:42 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Vacuum Check (Water leak) | *Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.* |
|
|
571
|
Tuesday, February 21, 2017, 10:35 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Water leak (E)(G) | Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water |
|
|
572
|
Friday, March 10, 2017, 15:42 |
Aaron Schmidt | UC#19 | | | | 41882-4 | 41751-2 | In progress | Conditioning Heat shield for UC#19 | Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo
pumps started. |
|
|
573
|
Wednesday, March 22, 2017, 09:37 |
Anders Mjos | | | | | | | | Pump down empty chamber | Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05:
Turbos started |
|
|
575
|
Tuesday, April 04, 2017, 14:33 |
Aaron Schmidt | | | | | | | | Power supply failure to E-rig | Wednesday, March 29, 2017, 15:15: DAC power
supply appears to have failed. Pop sound
and electrical smoke/smell noticed. |
|
|
577
|
Monday, April 10, 2017, 15:12 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum leak on front door | The vacuum behaved erratic over night with
excursion up into the mid 10^-6 Torr range.
To investigate the chamber was vented. With |
|