ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
536
|
Monday, August 29, 2016, 10:08 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Monday, August 29, 2016, 10:07: Roughing.
Friday, September 02, 2016,
14:33: Venting |
|
538
|
Wednesday, September 07, 2016, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 running uneven | Fault report was submitted.
Anders informed Anthony on Tuesday,
Sept 6, 2016. |
|
539
|
Wednesday, September 07, 2016, 15:51 |
Aaron Schmidt | | | | | | | | Flexible waterlines test. | Wednesday, September 07, 2016, 15:35: Roughing
Thursday, September 08, 2016,
08:33: Turbo pumps started. |
|
540
|
Thursday, September 08, 2016, 09:12 |
Anders Mjos | | | | | | | Problems/Solutions | Filament change on IG6 | Thursday, September 08, 2016, 08:20: Vacuum
group changed to the other filament to investigate
vacuum spikes on IG6 |
|
541
|
Tuesday, September 13, 2016, 14:38 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 replaced |
|
|
542
|
Wednesday, September 14, 2016, 13:58 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 latched breaker |
|
|
544
|
Friday, September 30, 2016, 11:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 Replacement | Friday, September 30, 2016, 10:01: Roughing
pump RP1 failed during roughing. Breaker
was tripped to RP1 & RP2.
Friday, September |
|
545
|
Tuesday, October 11, 2016, 14:55 |
Anders Mjos | | | | | | | In progress | Empty | Breaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55: |
|
546
|
Friday, October 14, 2016, 13:17 |
Anders Mjos | | | | | | | Problems/Solutions | Powerbump tripped off turbos | Friday, October 14, 2016, 13:17: Restarted
pumps
Friday, October 14, 2016, 13:4: Another |
|
548
|
Monday, October 24, 2016, 16:02 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber/Clean Exhaust/Test | Monday, October 24, 2016, 15:45: Remove
metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8" |
|
549
|
Thursday, October 27, 2016, 13:37 |
Aaron Schmidt | UC#18 | LP-SIS | ITW | TM2 | | 41751-3 | In progress | Conditioning Heat shield for UC#18 | Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started. |
|
550
|
Wednesday, November 16, 2016, 10:50 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Wednesday, November 16, 2016, 10:50: Begin
roughing.
Wednesday, November 16, 2016, 11:52: |
|
551
|
Thursday, November 24, 2016, 10:36 |
Aaron Schmidt | | | | | | | | Camera Container test 1. | Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA. |
|
552
|
Thursday, November 24, 2016, 10:39 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:TP2 | Thursday, November 24, 2016, 08:05: Whining
sound (high pitch) heard from TMS:TP2
Thursday, November 24, 2016, 10:37: |
|
553
|
Friday, November 25, 2016, 14:28 |
Anders Mjos | | | | | | | | Camera Container test 2 | Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started |
|
554
|
Monday, November 28, 2016, 15:39 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber/Check Exhaust | Monday, November 28, 2016, 15:35: Begin
roughing. Monitor exhaust mesh cover.
*Cover was found on the ground earlier |
|
555
|
Tuesday, November 29, 2016, 11:20 |
Anders Mjos | | | | | | | Problems/Solutions | TSH:UHV1 remvoed | The variable leak rate valve will be used
for TM3 HV spark tests in TCS |
|
556
|
Wednesday, November 30, 2016, 07:25 |
Aaron Schmidt | | | | | | | | Camera Container test 3. | Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing. |
|
557
|
Wednesday, November 30, 2016, 10:16 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (Close off for holidays) | Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05:
Turbo pumps on. |
|
558
|
Tuesday, January 03, 2017, 08:27 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (Restart. Post holidays) | Tuesday, January 03, 2017, 08:26: TSG :
RP1 & TMS : RP2 restarted.
Wednesday, January 04, 2017, |
|
|