  332   Monday, September 09, 2013, 09:14 Anders Mjos      Problems/SolutionsGround Electrode cleanedMonday, September 16, 2013, 17:04: Cleaned
GE. Copper shavings were removed from below
the guide pins for the Heat Shield. The shavings
 Dirty_GE.pdf 
  976   Monday, August 14, 2023, 12:11 Aaron Schmidt LP-SIS  45220-1145235-3 Graphite target test 2 (C2023B)Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded,
 Graphitetesting_Aug102023.xlsx 
  975   Wednesday, August 09, 2023, 14:29 Aaron Schmidt LP-SIS  45220-645235-3In progressGraphite target test 1 (C2023A)Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
 Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx 
  710   Friday, March 01, 2019, 14:51 Aaron Schmidt LP-FEBIAD     Gas lines test & Emissions measurement prepFriday, March 01, 2019, 14:50:
SV5 replaced with a new valve.
SV1 disconnected from the He line
 gas-lines-changes.jpgGas_line_backing_pump_test_2019.docxTS-2019-03-05-09-45.rgaTS-2019-03-06-08-00.rga 
  148   Tuesday, July 17, 2012, 10:10 Anders Mjos      Problems/SolutionsGas lines leak checked - air supply leak on manifoldLeak found on the Ne supply line. 1E-4
- 1E-5 range. Replaced fittings. Had to use
one brass piece. Leak rate 6E-9 (probably
  
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  709   Friday, February 22, 2019, 11:11 Aaron Schmidt LP-FEBIAD     Gas line backing pump testsBacking "mini pump" testing.
-Open gas lines & auto ramp (If
using HV, close up the back)
  
  825   Wednesday, December 02, 2020, 16:18 Fernando Maldonado      DoneGas delivery system upgradeYesterday, December 1st, I successfully
installed and tested the gas system inside
the faraday cage.
  
  838   Thursday, January 14, 2021, 08:31 Fernando Maldonado      In progressGas delivery system upgrade

    

       
            
 new-gauge.png 
  591   Wednesday, June 07, 2017, 12:49 Aaron Schmidt       Gas bottles Gas bottles for FEBIAD testing were
exchanged yesterday around 1:30. One Neon
& one Argon bottle were removed.
  
  608   Tuesday, October 10, 2017, 13:10 Aaron Schmidt       Gas bottlesTuesday, October 10, 2017, 09:30: 
Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon
  
  415   Thursday, December 18, 2014, 14:34 Anders Mjos      Problems/SolutionsGE cooling water lines disconnected In preparation for leak check
Thursday, December 18, 2014, 16:37:
Reconnected after leak check
  
  787   Monday, March 02, 2020, 14:42 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressFull TS testing w/ HV using Ta#60Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on.
  
  823   Tuesday, December 01, 2020, 17:04 Carla Babcock      Problems/SolutionsFound another burned jumper cableBetween feedthroughs F (magnet coil) and
B (tube heater negative), I found a jumper
with two resistors that has been burned up.
 20201201_115557.jpg 
  355   Thursday, January 16, 2014, 15:00 Anders Mjos      Problems/SolutionsFlow and temperature meterFlow and temperature meter previously installed
on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10
 Vortex_Flow_Meter_Config.docx 
  539   Wednesday, September 07, 2016, 15:51 Aaron Schmidt       Flexible waterlines test.Wednesday, September 07, 2016, 15:35: Roughing

Thursday, September 08, 2016,
08:33: Turbo pumps started.
 Flexible_Line_Test.docxTS-2016-09-08-08-47.rga 
  13   Monday, September 26, 2011, 16:14 Anders Mjos      Problems/SolutionsFixed leak on water line for HS, added Kapton insulation
    While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see
 Water_Leak.pdfKapton.pdf 
  8   Tuesday, September 20, 2011, 19:00 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6DoneFinished testing TaC#1Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20
  
  17   Friday, September 30, 2011, 18:03 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneFinished testing SiC#26 at the Test StandToday, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm,
  
  190   Friday, August 31, 2012, 11:12 Aurelia Laxdal HP-FEBIADITETM4  DoneFinished testing NiO#1Turned off the HV and the optics in the
first section. Couldn't turn off the optics
in the second section: left a message for
  