651
|
Wednesday, March 21, 2018, 14:11 |
Fernando Maldonado | | LP-FEBIAD | | | 395530-3 | 42752-2 | In progress | Test FEBIAD | Tests on coil, temperature and the use
of silver bolts.
(3) Vented silver bolts on the TBHT |
10x |
652
|
Thursday, March 29, 2018, 10:58 |
Carla Babcock | | | | | | | | | Started with Anode at 25V and coil at 0A,
bias at 30kV. (attachment 1)
Ramped coil to 60A (0.4V) (attachment |
6x |
653
|
Wednesday, April 11, 2018, 10:19 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, April 11, 2018, 10:19: Roughing |
|
654
|
Tuesday, April 17, 2018, 09:59 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | | | Test FEBIAD | New assembly & target. Same silver
bolts.
Tuesday, April 17, 2018, 09:56: Roughing. |
|
655
|
Tuesday, April 17, 2018, 11:02 |
Aaron Schmidt | | | | | | | Done | Roughing pump issue. | Tuesday, April 17, 2018, 10:57: Vacuum
not coming down. @ 1.514T . Backing valves
have been closed. |
|
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1
was reconnected into the anode power supply.
All jumpers were put back to remote control. |
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making
a terrible noise - keep an eye on it, it
sounds like it might give up soon. |
|
658
|
Wednesday, April 25, 2018, 09:50 |
Aaron Schmidt | Ta (test) | LP-SIS | | | 41177-3 | | In progress | Ta test and window change | Window changed on view port. Ta target
prepared for Aurelia's tests.
***Note*** No Ta window foils |
|
659
|
Monday, April 30, 2018, 12:07 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test ready | Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo |
|
660
|
Tuesday, May 08, 2018, 10:36 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | C-seal Test | 2 C-Seals installed with SS springs
on water blocks. The SS springs are also
used in the module. |
|
661
|
Tuesday, May 22, 2018, 08:48 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A not running | Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A |
|
662
|
Thursday, May 24, 2018, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beamline for IG6 replacement | Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 |
|
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration. |
|
664
|
Monday, May 28, 2018, 08:46 |
Aaron Schmidt | | LP-FEBIAD | | TM2 | 41790-9 | 42752-5 | In progress | New TM source tray swap out. | Monday, May 28, 2018, 08:45: Venting. Prep
For removal.
Close FS#8. Clean up water |
|
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not |
|
667
|
Thursday, June 07, 2018, 09:21 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber. Anode check | TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo |
|
668
|
Tuesday, June 12, 2018, 11:38 |
Aaron Schmidt | | | | | | | In progress | Source Tray re-installation | Re-installation of the ISAC Test Stand
Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect |
|
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found |
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping |
|
|