ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  745   Monday, July 15, 2019, 15:59 Fernando MaldonadoP2N     DoneRe-wiring on service cap.Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.
Coil high current cables moved to
  
  797   Thursday, June 25, 2020, 08:57 Fernando MaldonadoTest FEBIADHP-FEBIAD  38295-842752-5DoneFEBIAD development part 1/3 Reminder. Mini
pump still linked to SV1. DO NOT OPEN SV2!!!
  
  798   Tuesday, June 30, 2020, 21:59 Fernando MaldonadoTest FEBIADHP-FEBIAD  38295-8 42752-5 DoneFEBIAD development part 2/3 Reminder. Mini pump
still linked to SV1. DO NOT OPEN SV2!!!
  
  799   Monday, July 06, 2020, 05:28 Fernando MaldonadoTest FEBIAD HP-FEBIAD  38295-8 42752-5 DoneFEBIAD development part 3/3Reminder. Mini pump still linked
to SV1. DO NOT OPEN SV2!!!
  
  811   Tuesday, September 01, 2020, 14:01 Aaron Schmidt      DoneNew tubing installed on loopsTuesday, September 01, 2020, 14:00: 
New tubing installed.
Blue on FS#4 loop (A)(B)
  
  825   Wednesday, December 02, 2020, 16:18 Fernando Maldonado      DoneGas delivery system upgradeYesterday, December 1st, I successfully
installed and tested the gas system inside
the faraday cage.
  
  828   Friday, December 04, 2020, 13:39 Alexander Shkuratoff      DoneTM3 service tray prototype preparatory HV testsFriday, December 04, 2020, 13:34
Vacuum is at 3.6e-6 Torr and possibly
still dropping. Starting HV tests with just
  
  839   Wednesday, January 20, 2021, 11:30 Fernando Maldonado      DoneCathode bias mode configuration confirmed

    

       
            
  
  840   Thursday, January 21, 2021, 10:10 Fernando Maldonado LP-SIS  44139-1044378-2DoneEnergy spread calibration - SIS with TBHT negatively biased Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion 
Source, or ANBOSIS (still working on the
  
  841   Thursday, January 21, 2021, 10:55 Fernando Maldonado      DoneUpdated Good Vac value for TSG:IG1On Tuesday the hard good vacuum level was
changed from 7e-6 T to 1e-5 T
to allow larger leak rates when testing FEBIAD.
  
  845   Thursday, February 04, 2021, 19:22 Fernando Maldonado LP-SIS   44139-10 44378-2DoneEnergy spread calibration with SISSee e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing
 ESC_-_Feb_5_Start.docx 
  854   Thursday, February 18, 2021, 15:15 Fernando Maldonado      DoneHLA testsThursday, February 18, 2021, 15:01: With
the help of Spencer Kiy, we tested the proper
communication from python to epics.
  
  857   Monday, February 22, 2021, 18:25 Fernando Maldonado HP-FEBIAD    DoneFEBIAD parameter scansMonday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17:
Turbos on.
 ESC_-_Feb_23_FEBAID_parameter_initial_checks.docxER-580-290-30kV-m28_2021-2-23.txt 
  858   Monday, March 01, 2021, 12:58 Fernando Maldonado LP-FEBIAD    DoneFEBIAD parameter scans v2 Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos
on. Started a bit late as I was distracted.
  
  859   Monday, March 01, 2021, 16:13 Fernando Maldonado      DoneTemporary RGA installation Monday, March 01, 2021, 16:03: An
ExTorr RGA has been installed in the ISAC
test stand.
 EXTorr.PNG 
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - NewReplacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
 Ta#62_44691-4_Conditioning_-_R.docxTa#62_44691-4_Conditioning..docxITE-TM4-Ta#62-LP-SIS_Test_Stand.docx 
  890   Friday, July 30, 2021, 16:28 Fernando Maldonado LP-FEBIAD  41790-1044378-5DoneFEBIAD parameter scan - efficiency measurements Restarting everything after swapping
RP1 (see elog 889).
  
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  905   Thursday, November 04, 2021, 11:55 Fernando Maldonado      DoneOpening vacuum chamber for thesis pictures :pThursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39:
  