521
|
Monday, July 11, 2016, 13:51 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - NEW EE w/insulators | Monday, July 11, 2016, 13:49: Begin roughing.
10 µL: K & Rb added
5 µL: Cs added
Monday, July 11, 2016, 14:59 : Turbo pumps started.
Monday, July 11, 2016, 15:33 : Ion gauge on.
Tuesday, July 12, 2016, 08:13 : RGA on.
Tuesday, July 12, 2016, 08:18 : Water, power/sources on. Vacuum stable at 3.2E-7 T. No response on RGA.
Tuesday, July 12, 2016, 08:35: Auto-ramping TBHT only @ 1A/min to 110A. EZL/EE/BIAS to 13/1.5/30 kV.
Wednesday, July 13, 2016, 08:17: Reduced TBHT to 100 A -AM
Wednesday, July 13, 2016, 18:15: Auto-cool @ 1.5A/min
Thursday, July 14, 2016, 08:20: Sources/power off
Thursday, July 14, 2016, 08:27: RGA off, IV4 closed, Ion gauge off. Turbo pumps off. Water lines closed.
Thursday, July 14, 2016, 12:57: Venting
|
522
|
Thursday, July 14, 2016, 13:22 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - NEW EE w/insulators - No PE | Thursday, July 14, 2016, 14:41: Roughing started.
Thursday, July 14, 2016, 15:41: Turbo pumps started.
Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.
Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.
Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV
Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min
Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min
Friday, July 15, 2016, 11:21: IV4 opened
Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min
Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.
Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.
Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.
Monday, July 18, 2016, 11:25: Water purged. Power off/lockout. |
523
|
Monday, July 18, 2016, 12:20 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - No EE - No PE | Monday, July 18, 2016, 12:19: Roughing.
Monday, July 18, 2016, 13:13: Turbo pumps on.
Monday, July 18, 2016, 13:18: Ion gauge on.
Tuesday, July 19, 2016, 08:28: Power/Water on. No response on RGA. Vacuum stable @ 2.63E-7 T.
Tuesday, July 19, 2016, 08:43: Optics on. BIAS/EZL/EE on 30/13/0 kV. Auto-ramp TBHT to 110A @ 2 A/min.
Tuesday, July 19, 2016, 10:15: Auto-ramp TBHT to 130A @ 2 A/min.
Tuesday, July 19, 2016, 13:325: Auto-ramp down TBHT @ 2 A/min - AM
Tuesday, July 19, 2016, 13:36: Optics and BIAS / EZL / EE off -AM.
Tuesday, July 19, 2016, 14:28: Turbos off/Turbo vent.
Tuesday, July 19, 2016, 14:33: Venting.
|
524
|
Tuesday, July 19, 2016, 15:15 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - No EE - With PE | Tuesday, July 19, 2016, 15:14: Roughing.
Tuesday, July 19, 2016, 15:48: Turbo pumps started.
Tuesday, July 19, 2016, 15:55: Ion Gauge on.
Wednesday, July 20, 2016, 08:15: RGA On.
Wednesday, July 20, 2016, 08:25: Power/water on. No response on RGA. Vacuum stable @ 2.7E-7 T
Wednesday, July 20, 2016, 08:28: Sources on BIAS/EZL/EE @ 30/13/0 Kv
Wednesday, July 20, 2016, 08:31: Auto-ramping TBHT @ 2A/min.
Wednesday, July 20, 2016, 13:01: Auto-Cooling TBHT @ 3A/min.
Wednesday, July 20, 2016, 14:45: Sources off.
Wednesday, July 20, 2016, 14:47: RGA off. IV4 Closed.
Wednesday, July 20, 2016, 14:49: Turbos off.
Wednesday, July 20, 2016, 14:53: Power off. Water line purged.
Thursday, July 21, 2016, 07:52: Venting |
525
|
Thursday, July 21, 2016, 09:51 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Febiad Test - NEW COIL - No PE | Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on.
Thursday, July 21, 2016, 11:12: RGA on.
Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T
Friday, July 22, 2016, 08:40: Opening gas lines.
Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.
Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm
Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM
Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM
Monday, July 25, 2016, 09:39:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.0 |
3.82 |
TBHT |
27.9 |
2.96 |
COIL + EE |
27.7 |
4.94 |
TGHT |
29.7 |
5.51 |
Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.
Wednesday, July 27, 2016, 14:37: Spark tripped off IG6
Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV
Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV
Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV
Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)
Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target
Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.
Thursday, July 28, 2016, 09:09: Source gas control off. Venting.
|
527
|
Thursday, July 28, 2016, 11:12 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Thursday, July 28, 2016, 10:00 Roughing. |
528
|
Wednesday, August 03, 2016, 13:47 |
Aaron Schmidt | Ta#49 | HP-SIS | ITW | TM2 | | 41751-10 | | Conditioning Ta#49 | Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17: Turbo pumps started.
Wednesday, August 03, 2016, 14:22: Ion gauge on.
Thursday, August 04, 2016, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 2.96E-7T
Thursday, August 04, 2016, 08:20: Power/Sources on.
Thursday, August 04, 2016, 08:30: BIAS/EZL/EE @ 30/ 13/ 1.5 kV .
Thursday, August 04, 2016, 08:35: IV4 open. Auto ramping TGHT/TBHT to 580/200 A @ 2A/1A per min.
Thursday, August 04, 2016, 15:06:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.3 |
3.85 |
TBHT |
28.8 |
3.00 |
COIL + EE |
27.6 |
4.89 |
TGHT |
29.6 |
5.50 |
Friday, August 05, 2016, 10:12: RGA lost connection. Restarting.
Friday, August 05, 2016, 13:25: Graham Waters contacted. Constant voltage on emittance rig power supply. 10V? Spark from a while ago? Unable to scan.
Friday, August 05, 2016, 14:13: Auto cooling TGHT/TBHT @ 2A/1A per min.
Friday, August 05, 2016, 16:02: BIAS/ EZL/ EE @ 0/ 0/ 0 kV. Cooling continued.
Monday, August 08, 2016, 08:22 : RGA off. IV4 Closed.
Monday, August 08, 2016, 08:23: Turbo pumps off.
Monday, August 08, 2016, 08:26: Waterlines purged. Power off.
Monday, August 08, 2016, 09:27: Venting.
|
529
|
Monday, August 08, 2016, 09:48 |
Aaron Schmidt | | | | | 41882-4 | 41751-1 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-1 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.
Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.
Monday, August 08, 2016, 10:10: Roughing.
Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.
Monday, August 08, 2016, 10:40: Both Turbo pumps started.
Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.
Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T
Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 08:19: Power/sources on.
Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A
Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T
Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T
Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 10, 2016, 09:14: Venting. |
530
|
Wednesday, August 10, 2016, 08:09 |
Aaron Schmidt | | | | | 41882-4 | 41751-2 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-2 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 10, 2016, 09:47: 41751-1 removed from test stand. Exchange target & End plates to 41751-2
Wednesday, August 10, 2016, 10:07: 41751-2 placed into test stand. Door open for 20 minutes.
Wednesday, August 10, 2016, 10:10: Roughing.
Wednesday, August 10, 2016, 10:13: Doors finally sealed for roughing.
Wednesday, August 10, 2016, 10:23: BV1B OPEN. Opened @ 59T.
Wednesday, August 10, 2016, 10:45: Both Turbo pumps started.
Wednesday, August 10, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 10, 2016, 10:53: TP1A @ speed 38 KRPM
Wednesday, August 10, 2016, 11:45: RGA on. Vacuum @ 3.56E-6T
Thursday, August 11, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.34E-7T
Thursday, August 11, 2016, 08:19: Power/sources on
Thursday, August 11, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.36E-7T
Thursday, August 11, 2016, 11:15: Screen shots and check made @ 329-330A.
Thursday, August 11, 2016, 13:25: TGHT @ 580A. Vacuum @4.16E-7T
Thursday, August 11, 2016, 15:54: Screen shots and check made @ 580A. Vacuum @4.43E-7T and increasing. Cool in Am.
Friday, August 12, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 12, 2016, 13:20: Cooling Complete. Vacuum @ 2.16E-7T.
Friday, August 12, 2016, 13:33: Water lines purged. Power/sources off.
Monday, August 15, 2016, 08:07: Turbo pumps, Ion gauge, and RGA off.
Monday, August 15, 2016, 09:14: Venting. |
531
|
Friday, August 12, 2016, 14:40 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner communications | Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05
Emittance rig communications affected.
Enter 100 on Dac -- Reads: -500
Enter -100 on Dac -- Reads: -500. No response
@ 10V
Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications
Calibrate
test scan & park
Enter: 100 on Dac -- Reads 100
Enter: 200 on Dac -- Reads 200
Enter: 0 on Dac -- Reads 0
Enter: -200 on Dac -- Reads -200
Fixed |
532
|
Monday, August 15, 2016, 08:09 |
Aaron Schmidt | | | | | 41882-4 | 41751-4 | | HS Test OR Clean | Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-4 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 15, 2016, 09:45: 41751-2 removed from test stand. Exchange target & End plates to 41751-2
Monday, August 15, 2016, 10:07: 41751-4 placed into test stand. Door open for 22 minutes.
Monday, August 15, 2016, 10:10: Roughing.
Monday, August 15, 2016, 10:12: Doors sealed for roughing.
Monday, August 15, 2016, 10:21: BV1B OPEN. Opened @ 104T.
Monday, August 15, 2016, 10:44: Both Turbo pumps started.
Monday, August 15, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 15, 2016, 10:52: TP1A @ speed 38 KRPM.
Monday, August 15, 2016, 11:45: RGA on. Vacuum @ 4.20E-6T.
Tuesday, August 16, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.43E-7T
Tuesday, August 16, 2016, 08:20: Power/sources on
Tuesday, August 16, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T
Tuesday, August 16, 2016, 11:15: Screen shots and check made @ 329-330A.
Tuesday, August 16, 2016, 13:20: TGHT @ 580A. Vacuum @4.16E-7T.
Tuesday, August 16, 2016, 16:00: Auto-cooling started @ 2A/min. Vacuum @ 4.25E-7T
Wednesday, August 17, 2016, 08:11: Vacuum @ 1.90E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 17, 2016, 08:16: Water lines purged. Power/sources off.
Wednesday, August 17, 2016, 09:09: Venting. |
533
|
Wednesday, August 17, 2016, 08:19 |
Aaron Schmidt | | | | | 41882-4 | 41751-5 | | HS Test OR Clean | Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-5 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 17, 2016, 09:45: 41751-4 removed from test stand. Exchange target & End plates to 41751-5
Wednesday, August 17, 2016, 10:08: 41751-5 placed into test stand. Door open for 22 minutes.
Wednesday, August 17, 2016, 10:10: Roughing.
Wednesday, August 17, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 17, 2016, 10:18: BV1B OPEN. Opened @ 136T.
Wednesday, August 17, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 17, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 17, 2016, 10:50: TP1A @ speed 38 KRPM.
Wednesday, August 17, 2016, 11:47: RGA on. Vacuum @ 3.65E-6T.
Thursday, August 18, 2016, 08:19: Water lines opened. No response on RGA. Vacuum stable @ 2.53E-7T.
Thursday, August 18, 2016, 08:22: Power/sources on.
Thursday, August 18, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T.
Thursday, August 18, 2016, 11:39: Screen shots and check made @ 380-381A.
Thursday, August 18, 2016, 13:20: TGHT @ 580A. Vacuum @4.21E-7T.
Friday, August 19, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 19, 2016, 13:20: Cooling Complete. Vacuum @ 2.25E-7T.
Friday, August 19, 2016, 13:42: Water lines purged. Power/sources off.
Monday, August 22, 2016, 08:17: Vacuum @ 1.37E-7T. RGA off. Ion gauge off. Turbos off.
Monday, August 22, 2016, 09:16: Venting.
Flat Head screw on bottom end plate stripped. Warping found on cup Blank/plate. Discoloration noted on heat shield |
534
|
Monday, August 22, 2016, 08:20 |
Aaron Schmidt | | | | | 41882-4 | 41751-3 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-3 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate (Warped from 41751-5). No source cup.
Monday, August 22, 2016, 09:50: 41751-5 removed from test stand. Exchange target & End plates to 41751-3
Monday, August 22, 2016, 10:15: 41751-3 placed into test stand. Door open for 25 minutes.
Monday, August 22, 2016, 10:18: Roughing.
Monday, August 22, 2016, 10:19: Doors sealed for roughing.
Monday, August 22, 2016, 10:25: BV1B OPEN. Opened @ 151T.
Monday, August 22, 2016, 10:50: Both Turbo pumps started.
Monday, August 22, 2016, 10:54: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 22, 2016, 10:58: TP1A @ speed 38 KRPM.
Monday, August 22, 2016, 11:50: RGA on. Vacuum @ 3.91E-6T.
Tuesday, August 23, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.45E-7T
Tuesday, August 23, 2016, 08:19: Power/sources on.
Tuesday, August 23, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.45E-7T.
Tuesday, August 23, 2016, 13:20: TGHT @ 580A. Vacuum @3.79E-7T.
Tuesday, August 23, 2016, 16:06: Auto-cooling started @ 2A/min. Vacuum @ 3.96E-7T.
Wednesday, August 24, 2016, 08:08: RGA off. Ion gauge and Turbos off.
Wednesday, August 24, 2016, 08:14; Power/sources off.
Wednesday, August 24, 2016, 08:25: Waterlines purged.
Wednesday, August 24, 2016, 09:14: Venting. |
535
|
Wednesday, August 24, 2016, 09:16 |
Aaron Schmidt | | | | | 41882-4 | 41751-6 | | HS Test OR Clean | Heat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-6 . OR only.
No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.
Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6
Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.
Wednesday, August 24, 2016, 10:10: Roughing.
Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.
Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.
Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.
Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T
Thursday, August 25, 2016, 08:20: Power/sources on.
Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.
Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.
Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.
Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T
Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T
Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.
Monday, August 29, 2016, 09:28: Venting.
Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged. |
536
|
Monday, August 29, 2016, 10:08 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Monday, August 29, 2016, 10:07: Roughing.
Friday, September 02, 2016, 14:33: Venting |
537
|
Friday, September 02, 2016, 15:47 |
Aaron Schmidt | SiC#34 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | 41751-9 | | Conditioning SiC# 34 | Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18: Turbos started -AM
Friday, September 02, 2016, 16:28: Turbos at speed. Vacuum at 2.0E-5 T.
Tuesday, September 06, 2016, 08:13: RGA on.
Tuesday, September 06, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.62E-7T
Tuesday, September 06, 2016, 08:19: Power/sources on.
Tuesday, September 06, 2016, 08:30: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, September 06, 2016, 08:34: IV4 open. Auto ramping TGHT / TBHT to 580 / 250 A @ 2A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.3 |
2.96 |
COIL + EE |
28.0 |
4.89 |
TGHT |
29.6 |
5.50 |
Tuesday, September 06, 2016, 13:56: Auto ramping TBHT to 270A @ 2A per min
Tuesday, September 06, 2016, 14:05: Turbo pump TP1A found off. Restarted.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.4 |
0.07 |
TBHT |
28.5 |
2.98 |
COIL + EE |
28.0 |
4.92 |
TGHT |
30.0 |
5.54 |
Tuesday, September 06, 2016, 20:49: Ramping down TGHT / TBHT at 2 / 1 A/min
Wednesday, September 07, 2016, 08:46: Sources off. RGA error out. RGA off
Wednesday, September 07, 2016, 08:53: IV4 closed. Ion gauge off.
Wednesday, September 07, 2016, 08:54: Turbo pumps off.
Wednesday, September 07, 2016, 09:06: Power off. Water lines purged.
Wednesday, September 07, 2016, 09:54: Venting. |
538
|
Wednesday, September 07, 2016, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 running uneven | Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233. |
539
|
Wednesday, September 07, 2016, 15:51 |
Aaron Schmidt | | | | | | | | Flexible waterlines test. | Wednesday, September 07, 2016, 15:35: Roughing
Thursday, September 08, 2016, 08:33: Turbo pumps started.
Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.
Thursday, September 08, 2016, 08:47: RGA on.
Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T
DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.
Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.6 |
2.96 |
COIL + EE |
28.2 |
4.89 |
TGHT |
28.4 |
5.49 |
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.6 |
3.68 |
TBHT |
28.6 |
3.02 |
COIL + EE |
28.2 |
4.91 |
TGHT |
28.2 |
5.51 |
Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T
Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.7 |
3.71 |
TBHT |
28.8 |
3.06 |
COIL + EE |
28.2 |
4.94 |
TGHT |
28.4 |
5.56 |
Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
29.0 |
3.09 |
COIL + EE |
28.2 |
4.95 |
TGHT |
28.4 |
5.48 |
Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.72 |
TBHT |
29.1 |
3.06 |
COIL + EE |
28.2 |
4.87 |
TGHT |
28.4 |
5.51 |
Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
28.7 |
3.07 |
COIL + EE |
28.0 |
4.91 |
TGHT |
28.2 |
5.51 |
Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.
Tuesday, September 13, 2016, 08:24: Waterlines purged.
Wednesday, September 14, 2016, 11:33: Venting -AM |
543
|
Friday, September 30, 2016, 11:11 |
Aaron Schmidt | SiC#35 | HP-FEBIAD | ITW | TM2 | 39530-9 | 41120-8 | Done | Conditioning SiC#35 | Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |
544
|
Friday, September 30, 2016, 11:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 Replacement | Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2.
Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested. |
|