  521   Monday, July 11, 2016, 13:51 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulators

Monday, July 11, 2016, 13:49: Begin roughing.

10 µL: K & Rb added

5 µL: Cs added

Monday, July 11, 2016, 14:59 : Turbo pumps started.

Monday, July 11, 2016, 15:33 : Ion gauge on.


Tuesday, July 12, 2016, 08:13 : RGA on.

Tuesday, July 12, 2016, 08:18 : Water, power/sources on. Vacuum stable at 3.2E-7 T. No response on RGA.

Tuesday, July 12, 2016, 08:35: Auto-ramping TBHT only @ 1A/min to 110A. EZL/EE/BIAS to 13/1.5/30 kV.


Wednesday, July 13, 2016, 08:17: Reduced TBHT to 100 A -AM

Wednesday, July 13, 2016, 18:15: Auto-cool @ 1.5A/min


Thursday, July 14, 2016, 08:20: Sources/power off

Thursday, July 14, 2016, 08:27: RGA off, IV4 closed, Ion gauge off. Turbo pumps off. Water lines closed.

Thursday, July 14, 2016, 12:57: Venting

 

  522   Thursday, July 14, 2016, 13:22 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulators - No PE

Thursday, July 14, 2016, 14:41:  Roughing started.

Thursday, July 14, 2016, 15:41: Turbo pumps started.

Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.


Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.

Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV

Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min

Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min

Friday, July 15, 2016, 11:21: IV4 opened


Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min

Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.

Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.

Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.

Monday, July 18, 2016, 11:25: Water purged. Power off/lockout.

  523   Monday, July 18, 2016, 12:20 Aaron Schmidt     41751-7 Tube only - No EE - No PE

Monday, July 18, 2016, 12:19: Roughing.

Monday, July 18, 2016, 13:13: Turbo pumps on.

Monday, July 18, 2016, 13:18: Ion gauge on.


Tuesday, July 19, 2016, 08:28: Power/Water on. No response on RGA. Vacuum stable @ 2.63E-7 T.

Tuesday, July 19, 2016, 08:43: Optics on. BIAS/EZL/EE on 30/13/0 kV. Auto-ramp TBHT to 110A @ 2 A/min.

Tuesday, July 19, 2016, 10:15: Auto-ramp TBHT to 130A @ 2 A/min.

Tuesday, July 19, 2016, 13:325: Auto-ramp down TBHT @ 2 A/min - AM

Tuesday, July 19, 2016, 13:36: Optics and BIAS / EZL / EE off -AM.

Tuesday, July 19, 2016, 14:28: Turbos off/Turbo vent.

Tuesday, July 19, 2016, 14:33: Venting.

 

  524   Tuesday, July 19, 2016, 15:15 Aaron Schmidt     41751-7 Tube only - No EE - With PE

Tuesday, July 19, 2016, 15:14: Roughing.

Tuesday, July 19, 2016, 15:48: Turbo pumps started.

Tuesday, July 19, 2016, 15:55: Ion Gauge on.


Wednesday, July 20, 2016, 08:15: RGA On.

Wednesday, July 20, 2016, 08:25: Power/water on. No response on RGA. Vacuum stable @ 2.7E-7 T

Wednesday, July 20, 2016, 08:28: Sources on BIAS/EZL/EE @ 30/13/0 Kv

Wednesday, July 20, 2016, 08:31: Auto-ramping TBHT @ 2A/min.

Wednesday, July 20, 2016, 13:01: Auto-Cooling TBHT @ 3A/min.

Wednesday, July 20, 2016, 14:45: Sources off.

Wednesday, July 20, 2016, 14:47: RGA off. IV4 Closed.

Wednesday, July 20, 2016, 14:49: Turbos off.

Wednesday, July 20, 2016, 14:53: Power off. Water line purged.


Thursday, July 21, 2016, 07:52: Venting

  525   Thursday, July 21, 2016, 09:51 Aaron Schmidt LP-FEBIAD     Febiad Test - NEW COIL - No PE

Thursday, July 21, 2016, 08:55: Roughing.

Thursday, July 21, 2016, 09:50: Turbo pumps started.

Thursday, July 21, 2016, 09:54: Ion Gauge on.

Thursday, July 21, 2016, 11:12: RGA on.

Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T


Friday, July 22, 2016, 08:40: Opening gas lines.

Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.

Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.

Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm

Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM

Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM


Monday, July 25, 2016, 09:39:

Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP  38.0 3.82
 TBHT 27.9 2.96
 COIL + EE  27.7 4.94
 TGHT  29.7 5.51

Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.


Wednesday, July 27, 2016, 14:37: Spark tripped off IG6

Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV

Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV

Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)

Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target


Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.

Thursday, July 28, 2016, 09:09: Source gas control off. Venting.

  527   Thursday, July 28, 2016, 11:12 Aaron Schmidt       Pump down empty chamber.

Thursday, July 28, 2016, 10:00 Roughing.

  528   Wednesday, August 03, 2016, 13:47 Aaron SchmidtTa#49HP-SISITWTM2 41751-10 Conditioning Ta#49

Wednesday, August 03, 2016, 13:47: Roughing

Wednesday, August 03, 2016, 14:17: Turbo pumps started.

Wednesday, August 03, 2016, 14:22: Ion gauge on.


Thursday, August 04, 2016, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 2.96E-7T

Thursday, August 04, 2016, 08:20: Power/Sources on.

Thursday, August 04, 2016, 08:30: BIAS/EZL/EE @ 30/ 13/ 1.5 kV .

Thursday, August 04, 2016, 08:35: IV4 open. Auto ramping TGHT/TBHT to 580/200 A @ 2A/1A per min.

Thursday, August 04, 2016, 15:06:

Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP  33.3 3.85
 TBHT  28.8 3.00
 COIL + EE  27.6 4.89
 TGHT  29.6 5.50

Friday, August 05, 2016, 10:12: RGA lost connection. Restarting.

Friday, August 05, 2016, 13:25: Graham Waters contacted. Constant voltage on emittance rig power supply. 10V? Spark from a while ago? Unable to scan.

Friday, August 05, 2016, 14:13: Auto cooling TGHT/TBHT  @ 2A/1A per min.

Friday, August 05, 2016, 16:02: BIAS/ EZL/ EE @ 0/ 0/ 0 kV. Cooling continued.


Monday, August 08, 2016, 08:22 : RGA off. IV4 Closed.

Monday, August 08, 2016, 08:23: Turbo pumps off.

Monday, August 08, 2016, 08:26: Waterlines purged. Power off.

Monday, August 08, 2016, 09:27: Venting.

  529   Monday, August 08, 2016, 09:48 Aaron Schmidt    41882-441751-1 HS Test Full Clean

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-1 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.

Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.

Monday, August 08, 2016, 10:10: Roughing.

Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.

Monday, August 08, 2016, 10:40: Both Turbo pumps started.

Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.

Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T


Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T

Tuesday, August 09, 2016, 08:19: Power/sources on.

Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T

Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A

Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T

Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T


Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.

Wednesday, August 10, 2016, 09:14: Venting.

  530   Wednesday, August 10, 2016, 08:09 Aaron Schmidt    41882-441751-2 HS Test Full Clean

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-2 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Wednesday, August 10, 2016, 09:47: 41751-1 removed from test stand. Exchange target & End plates to 41751-2

Wednesday, August 10, 2016, 10:07: 41751-2 placed into test stand. Door open for 20 minutes.

Wednesday, August 10, 2016, 10:10: Roughing.

Wednesday, August 10, 2016, 10:13: Doors finally sealed for roughing.

Wednesday, August 10, 2016, 10:23: BV1B OPEN. Opened @ 59T.

Wednesday, August 10, 2016, 10:45: Both Turbo pumps started.

Wednesday, August 10, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 10, 2016, 10:53: TP1A @ speed 38 KRPM

Wednesday, August 10, 2016, 11:45: RGA on. Vacuum @ 3.56E-6T


Thursday, August 11, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.34E-7T

Thursday, August 11, 2016, 08:19: Power/sources on

Thursday, August 11, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.36E-7T

Thursday, August 11, 2016, 11:15: Screen shots and check made @ 329-330A.

Thursday, August 11, 2016, 13:25: TGHT @ 580A. Vacuum @4.16E-7T

Thursday, August 11, 2016, 15:54: Screen shots and check made @ 580A. Vacuum @4.43E-7T and increasing. Cool in Am.


Friday, August 12, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T

Friday, August 12, 2016, 13:20: Cooling Complete. Vacuum @ 2.16E-7T.

Friday, August 12, 2016, 13:33: Water lines purged. Power/sources off.


Monday, August 15, 2016, 08:07: Turbo pumps, Ion gauge, and RGA off.

Monday, August 15, 2016, 09:14: Venting.

  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communications

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed

  532   Monday, August 15, 2016, 08:09 Aaron Schmidt    41882-441751-4 HS Test OR Clean

Heat Shield Test (OR Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-4 . OR only. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Monday, August 15, 2016, 09:45: 41751-2 removed from test stand. Exchange target & End plates to 41751-2

Monday, August 15, 2016, 10:07: 41751-4 placed into test stand. Door open for 22 minutes.

Monday, August 15, 2016, 10:10: Roughing.

Monday, August 15, 2016, 10:12: Doors sealed for roughing.

Monday, August 15, 2016, 10:21: BV1B OPEN. Opened @ 104T.

Monday, August 15, 2016, 10:44: Both Turbo pumps started.

Monday, August 15, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 15, 2016, 10:52: TP1A @ speed 38 KRPM.

Monday, August 15, 2016, 11:45: RGA on. Vacuum @ 4.20E-6T.


Tuesday, August 16, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.43E-7T

Tuesday, August 16, 2016, 08:20: Power/sources on

Tuesday, August 16, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T

Tuesday, August 16, 2016, 11:15: Screen shots and check made @ 329-330A.

Tuesday, August 16, 2016, 13:20: TGHT @ 580A. Vacuum @4.16E-7T.

Tuesday, August 16, 2016, 16:00: Auto-cooling started @ 2A/min. Vacuum @ 4.25E-7T


Wednesday, August 17, 2016, 08:11: Vacuum @ 1.90E-7T. RGA off. Ion gauge off. Turbos off.

Wednesday, August 17, 2016, 08:16: Water lines purged. Power/sources off.

Wednesday, August 17, 2016, 09:09: Venting.

  533   Wednesday, August 17, 2016, 08:19 Aaron Schmidt    41882-441751-5 HS Test OR Clean

Heat Shield Test (OR Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-5 . OR only. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Wednesday, August 17, 2016, 09:45: 41751-4 removed from test stand. Exchange target & End plates to 41751-5

Wednesday, August 17, 2016, 10:08: 41751-5 placed into test stand. Door open for 22 minutes.

Wednesday, August 17, 2016, 10:10: Roughing.

Wednesday, August 17, 2016, 10:10: Doors sealed for roughing.

Wednesday, August 17, 2016, 10:18: BV1B OPEN. Opened @ 136T.

Wednesday, August 17, 2016, 10:41: Both Turbo pumps started.

Wednesday, August 17, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 17, 2016, 10:50: TP1A @ speed 38 KRPM.

Wednesday, August 17, 2016, 11:47: RGA on. Vacuum @ 3.65E-6T.


Thursday, August 18, 2016, 08:19: Water lines opened. No response on RGA. Vacuum stable @ 2.53E-7T.

Thursday, August 18, 2016, 08:22: Power/sources on.

Thursday, August 18, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T.

Thursday, August 18, 2016, 11:39: Screen shots and check made @ 380-381A.

Thursday, August 18, 2016, 13:20: TGHT @ 580A. Vacuum @4.21E-7T.


Friday, August 19, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T

Friday, August 19, 2016, 13:20: Cooling Complete. Vacuum @ 2.25E-7T.

Friday, August 19, 2016, 13:42: Water lines purged. Power/sources off.

Monday, August 22, 2016, 08:17: Vacuum @ 1.37E-7T. RGA off. Ion gauge off. Turbos off.

Monday, August 22, 2016, 09:16: Venting.

Flat Head screw on bottom end plate stripped. Warping found on cup Blank/plate. Discoloration noted on heat shield

  534   Monday, August 22, 2016, 08:20 Aaron Schmidt    41882-441751-3 HS Test Full Clean

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-3 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate (Warped from 41751-5). No source cup.

Monday, August 22, 2016, 09:50: 41751-5 removed from test stand. Exchange target & End plates to 41751-3

Monday, August 22, 2016, 10:15: 41751-3 placed into test stand. Door open for 25 minutes.

Monday, August 22, 2016, 10:18: Roughing.

Monday, August 22, 2016, 10:19: Doors sealed for roughing.

Monday, August 22, 2016, 10:25: BV1B OPEN. Opened @ 151T.

Monday, August 22, 2016, 10:50: Both Turbo pumps started.

Monday, August 22, 2016, 10:54: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 22, 2016, 10:58: TP1A @ speed 38 KRPM.

Monday, August 22, 2016, 11:50: RGA on. Vacuum @ 3.91E-6T.


Tuesday, August 23, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.45E-7T

Tuesday, August 23, 2016, 08:19: Power/sources on.

Tuesday, August 23, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.45E-7T.

Tuesday, August 23, 2016, 13:20: TGHT @ 580A. Vacuum @3.79E-7T.

Tuesday, August 23, 2016, 16:06: Auto-cooling started @ 2A/min. Vacuum @ 3.96E-7T.


Wednesday, August 24, 2016, 08:08: RGA off. Ion gauge and Turbos off.

Wednesday, August 24, 2016, 08:14; Power/sources off.

Wednesday, August 24, 2016, 08:25: Waterlines purged.

Wednesday, August 24, 2016, 09:14: Venting.

  535   Wednesday, August 24, 2016, 09:16 Aaron Schmidt    41882-441751-6 HS Test OR Clean

Heat Shield Test (OR only).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-6 . OR only.

No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.

Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6

Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.

Wednesday, August 24, 2016, 10:10: Roughing.

Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.

Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.

Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.

Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.

Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.


Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T

Thursday, August 25, 2016, 08:20: Power/sources on.

Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.

Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.

Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.


Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T

Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T


Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.

Monday, August 29, 2016, 09:28: Venting.

Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged.

  536   Monday, August 29, 2016, 10:08 Aaron Schmidt       Pump down empty chamber.

Monday, August 29, 2016, 10:07: Roughing.


Friday, September 02, 2016, 14:33: Venting

  537   Friday, September 02, 2016, 15:47 Aaron SchmidtSiC#34LP-IG-LISITETM439814-V2-141751-9 Conditioning SiC# 34

Friday, September 02, 2016, 15:47: Roughing.

Friday, September 02, 2016, 16:18: Turbos started -AM

Friday, September 02, 2016, 16:28: Turbos at speed. Vacuum at 2.0E-5 T.


Tuesday, September 06, 2016, 08:13: RGA on.

Tuesday, September 06, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.62E-7T

Tuesday, September 06, 2016, 08:19: Power/sources on.

Tuesday, September 06, 2016, 08:30: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Tuesday, September 06, 2016, 08:34: IV4 open. Auto ramping TGHT / TBHT to 580 / 250 A @ 2A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.78
 TBHT  28.3 2.96
 COIL + EE 28.0 4.89
 TGHT  29.6 5.50

 Tuesday, September 06, 2016, 13:56: Auto ramping TBHT to 270A @ 2A per min

Tuesday, September 06, 2016, 14:05: Turbo pump TP1A found off. Restarted.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 38.4 0.07
 TBHT  28.5 2.98
 COIL + EE 28.0 4.92
 TGHT  30.0 5.54

 Tuesday, September 06, 2016, 20:49: Ramping down TGHT / TBHT at 2 / 1 A/min


Wednesday, September 07, 2016, 08:46: Sources off. RGA error out. RGA off

Wednesday, September 07, 2016, 08:53: IV4 closed. Ion gauge off.

Wednesday, September 07, 2016, 08:54: Turbo pumps off.

Wednesday, September 07, 2016, 09:06: Power off. Water lines purged.

Wednesday, September 07, 2016, 09:54: Venting.

  538   Wednesday, September 07, 2016, 15:50 Aaron Schmidt      Problems/SolutionsTSG:RP1 running uneven

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

  539   Wednesday, September 07, 2016, 15:51 Aaron Schmidt       Flexible waterlines test.

Wednesday, September 07, 2016, 15:35: Roughing


Thursday, September 08, 2016, 08:33: Turbo pumps started.

Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.

Thursday, September 08, 2016, 08:47: RGA on.

Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T

DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.

Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.78
 TBHT  28.6 2.96
 COIL + EE 28.2 4.89
 TGHT  28.4 5.49

 


  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.6 3.68
 TBHT  28.6 3.02
 COIL + EE 28.2 4.91
 TGHT  28.2 5.51

Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T

Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.7 3.71
 TBHT  28.8 3.06
 COIL + EE 28.2 4.94
 TGHT  28.4 5.56

 


Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  29.0 3.09
 COIL + EE 28.2 4.95
 TGHT  28.4 5.48

Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.72
 TBHT  29.1 3.06
 COIL + EE 28.2 4.87
 TGHT  28.4 5.51

 


Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.68
 TBHT  28.7 3.07
 COIL + EE 28.0 4.91
 TGHT  28.2 5.51

Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.

Tuesday, September 13, 2016, 08:24: Waterlines purged.


Wednesday, September 14, 2016, 11:33: Venting -AM

  543   Friday, September 30, 2016, 11:11 Aaron SchmidtSiC#35HP-FEBIADITWTM239530-941120-8DoneConditioning SiC#35

Friday, September 30, 2016, 10:00: Roughing.

Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.

Friday, September 30, 2016, 11:49: Roughing continued.

Friday, September 30, 2016, 12:37: Turbos started -AM


Monday, October 03, 2016, 09:00: RGA on.

Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.

Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.

Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2

Monday, October 03, 2016, 09:47: Anode on @ 200 V

Monday, October 03, 2016, 09:49: Coil on @ 50A

Monday, October 03, 2016, 09:50: IV4 opened.

Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Monday, October 03, 2016, 10:12

 Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP 27.0 3.99
 TBHT 27.5 3.21
 COIL + EE 26.8 5.26
 TGHT  26.9 5.78

Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.

Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.

Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.


Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted

  Temp
[C]
 Flow
[lpm]
 HS + MSP 35.3 3.99
 TBHT 29.9 3.14
 COIL + EE 28.8 5.07
 TGHT  30.8 5.72

Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.

Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.


Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.

  Temp
[C]
 Flow
[lpm]
 HS + MSP 35.4 3.95
 TBHT 29.4 3.09
 COIL + EE 28.8 5.05
 TGHT 30.8 5.70

 


Friday, October 07, 2016, 08:12: Source off - AM


Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM

Tuesday, October 11, 2016, 13:38: Venting -AM

  544   Friday, September 30, 2016, 11:14 Aaron Schmidt      Problems/SolutionsTSG:RP1 Replacement
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2. Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested.