Tuesday, October 10, 2017, 13:10, Aaron Schmidt, , , , , , , , Gas bottles
|
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon Bottle Serial #11231. Leak rate calibrated @ 1.59e-07 atm*CC/sec (02/09/2016)
In use: |
Tuesday, October 10, 2017, 14:56, Aaron Schmidt, , , , , , , In progress, FEBIAD Anode bias configuration
|
Unable to hold Anode voltage after power supply change out.
Tuesday, October 10, 2017, 14:55: The Test Stand has been configured for Anode bias and the electrical connections have been wired according to ISK4523D
REV 6. |
Monday, October 16, 2017, 11:46, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber Test EE
|
Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05: Turbo pumps started.
Monday, October 16, 2017, 12:10; Ion gauge on. |
Tuesday, October 24, 2017, 11:38, Anders Mjos, , , , , , , , FEBIAD coil magnetic field measurment
|
with Fernando
Tuesday, October 24, 2017: Testing setup with triple coil
Wednesday, October 25, 2017: Field mapping at 70 A and current/field measurements on triple coil. |
Monday, October 30, 2017, 08:54, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 shut down due to high noise
|
The turbo pump will need replacement. |
Wednesday, November 15, 2017, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP6 replacement
|
Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55: Turbo (TP2) off. Ion gauge off.
Wednesday, November 15, 2017, 10:55: Venting |
Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS
|
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open |
Monday, December 04, 2017, 08:29, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage
|
Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B. |
Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas
|
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing. |
Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down
|
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off. |
Thursday, December 21, 2017, 15:12, Anders Mjos, , , , , , , , Powered down devices
|
Powered down vacuum gauge and turbo pump controllers |
Tuesday, January 02, 2018, 09:18, Anders Mjos, , , , , , , Problems/Solutions, Starting system
|
Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started |
Monday, January 22, 2018, 09:04, Aaron Schmidt, , , , , , , Done, Power outage & Controller replacement.
|
Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted.
Turbo pumps restarted. |
Friday, January 26, 2018, 11:10, Aaron Schmidt, , , , , , , Done, Helium tank replacement
|
Friday, January 26, 2018, 11:08: New Helium tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank was not opened.
-The old tank was placed beside the Test Stand beneath/beside the power switch. |
Friday, January 26, 2018, 13:59, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 1
|
Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV. |
Monday, January 29, 2018, 10:07, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Power outage / HV test 2
|
HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS |
Tuesday, January 30, 2018, 06:51, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 3
|
Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set |
Wednesday, January 31, 2018, 09:53, Aaron Schmidt, , , , , (Blank), 42752-3, Done, Wire moved.
|
Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire
was adjusted to sit higher. and away from the EZL |
Wednesday, January 31, 2018, 12:58, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, HV test 4
|
Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2 |
Monday, February 05, 2018, 09:17, Aaron Schmidt, , , , , , , Problems/Solutions, Epics loss
|
Monday, February 05, 2018, 09:10: the epics program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
Monday, February 05, 2018, 09:16: Restart Turbo pumps on chamber & beamline. |
|