458
|
Tuesday, August 04, 2015, 13:37 |
Anders Mjos | | | | | | | Problems/Solutions | Equipment for outgassing measurements removed | |
|
459
|
Monday, August 10, 2015, 18:01 |
Anders Mjos | | LP-SIS | | | | | In progress | Testing new center block target | Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint |
|
460
|
Saturday, August 29, 2015, 14:33 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted IOC after power outage | Saturday, August 29, 2015, 15:50:
Turbos started |
|
461
|
Wednesday, September 09, 2015, 08:54 |
Anders Mjos | | | | | | | In progress | Venting | Wednesday, September 09, 2015, 08:53:
Turbos stopped
Friday, September 11, 2015: |
|
462
|
Friday, September 11, 2015, 11:43 |
Anders Mjos | Ta#46 | HP-SIS | ITE | TM4 | | | Done | Ta#46 conditioning | EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing |
|
463
|
Monday, September 14, 2015, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | RP2 increased pressure | e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33: |
|
464
|
Thursday, September 17, 2015, 14:05 |
Anders Mjos | Test Target | LP-SIS | | | | | In progress | New centre block test |
|
|
465
|
Friday, September 18, 2015, 11:35 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP6 nor working | found in fault state this morning. Edi
consulted and fault report submitted. |
|
466
|
Wednesday, September 30, 2015, 16:28 |
Anders Mjos | Test Target wrapped with heat shields | LP-SIS | | | | | In progress | New centre block test |
|
|
467
|
Friday, October 02, 2015, 08:35 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beam line for TP exchange | Friday, October 02, 2015, 08:35:
Turbo stopped |
|
468
|
Wednesday, October 07, 2015, 11:16 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09
Turbos started |
|
469
|
Tuesday, October 13, 2015, 07:47 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Target was pumped down on Friday.
Tuesday, October 13, 2015,
07:47: Opened water for HS. No response on |
|
470
|
Tuesday, October 13, 2015, 16:04 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 timed out | Contacted Graham W. (controls) to have
a look. It turned out to be a limit switch
problem. Removed and reinstalled limit switch |
|
471
|
Tuesday, October 13, 2015, 17:23 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07:
Started turbos. |
|
472
|
Wednesday, October 14, 2015, 16:13 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:RP2 replaced | by vacuum group. The pump was making
more noise than usual. |
|
473
|
Thursday, October 15, 2015, 11:19 |
Anders Mjos | | | | | | | Problems/Solutions | Right side TGHT connector block removed | The keensert has been worn out and will
be replaced.
The keensert was re-tapped and the |
|
474
|
Friday, October 16, 2015, 12:26 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06:
Started turbos. |
|
475
|
Monday, October 19, 2015, 09:45 |
Anders Mjos | | | | | | | Problems/Solutions | IG1 filament dead | Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: |
|
476
|
Monday, October 19, 2015, 15:39 |
Anders Mjos | | | | | | | Problems/Solutions | Exhaust came off the new RP2 |
|
|
477
|
Monday, November 02, 2015, 12:47 |
Anders Mjos | | | | | | | Problems/Solutions | Removed Swagelok T from rioght TGHT water lines | Mico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46: |
|
|