Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 34 of 49  Not logged in ELOG logo
Entry  Monday, March 17, 2014, 19:10, Anders Mjos, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1 / 39956-9 (base / lid), In progress, Conditioning Ta#42_Test_Stand.docxOMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp
NOTE:
TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current
to the tube.
Entry  Wednesday, March 12, 2014, 10:20, Rick Maharaj, , , , , , , Done, replace heatshield waterline loop 
A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
Entry  Tuesday, March 11, 2014, 09:03, Anders Mjos, , , , , , , Problems/Solutions, Leak on water line for Heat Shield 
Tuesday, March 11, 2014, 09:03: Venting to investigate
Entry  Friday, March 07, 2014, 11:38, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 stopped over night 
See fault report 7240

Tuesday, March 11, 2014, 09:04: Stopping TMS:TP6. Vacuum at 9.7E-6 T.

Wednesday, March 12, 2014, 10:22: Venting TMS section for TP2 replacement.
Entry  Wednesday, February 12, 2014, 09:01, Anders Mjos, , , , , , , In progress, Testing Cleaning sample 
Wednesday, February 12, 2014, 08:55: Stopped turbos 
Wednesday, February 12, 2014, 11:28: Venting
Installed one sample. No cleaning. Connection tabs wiped with alcohol to prevent making the source tray dirty.
Entry  Wednesday, February 05, 2014, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Emittance Rig installation Spacers_Installed.jpgEmittance_Rig_Inside.jpgEmittance_Rig_Outside.jpg
Wednesday, February 05, 2014, 11:27 : Stopped turbos

    2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers
not used).
    Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
    Replaced two
Entry  Wednesday, January 29, 2014, 14:42, Anders Mjos, , , , , , , Problems/Solutions, Valved off water to TSG and TMS:MB1 
CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.
    Reply  Thursday, January 30, 2014, 15:38, Anders Mjos, , , , , , , Problems/Solutions, Starting turbos after CuLCW shut off 


    
        
            Anders Mjos wrote:
        
        
            
            CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are
Entry  Friday, January 24, 2014, 10:49, Anders Mjos, , , , , , , Problems/Solutions, Venting the optics section to investigate Emittance Rig installation 
Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T 
Friday, January 24, 2014, 12:52: Venting
Finished evaluating emittance rig installation.
Entry  Thursday, January 16, 2014, 15:00, Anders Mjos, , , , , , , Problems/Solutions, Flow and temperature meter Vortex_Flow_Meter_Config.docx
Flow and temperature meter previously installed on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10 psi out. Cyclotron off.

    
        
            Device
Entry  Tuesday, January 14, 2014, 08:58, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test 
Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: Venting 
Ta-tube installed. All bolts torqued to 130 in lbs
Entry  Thursday, January 02, 2014, 11:53, Anders Mjos, , , , , , , Problems/Solutions, The computer will not boot Windows 
The computer has been brought over to PC support for diagnostics. 
Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.

Thursday, January 16, 2014
Entry  Friday, December 20, 2013, 15:46, Anders Mjos, , , , , , , Problems/Solutions, Water switched off for the holidays 
 
Entry  Wednesday, December 18, 2013, 12:04, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test 
 Wednesday, December 18, 2013, 12:04: Turbos stopped
Wednesday, December 18, 2013, 13:19: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Entry  Thursday, December 12, 2013, 09:01, Anders Mjos, , , , , , , Problems/Solutions, Vacuum excursion over night VacuumExcursion-2013-12-12.pngVacuumExcursion-2013-12-16.png
Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. 
Entry  Wednesday, December 04, 2013, 09:22, Anders Mjos, , , , , , , In progress, Testing impedance with the new TBHT P/S 
Wednesday, December 04, 2013, 09:21 : Turbos stopped. Vacuum at  1.2E-7 Torr
Wednesday, December 04, 2013, 12:35: Venting
Copper bars installed w/ 130 in lbs torque
Entry  Monday, December 02, 2013, 15:21, Anders Mjos, , , , , , , Problems/Solutions, Xantrex 10V 600A installed and in Cathode Negative mode 
By Ray Dube. 
Entry  Monday, December 02, 2013, 08:36, Anders Mjos, , , , , , , Problems/Solutions, Sources archiver started 
 
Entry  Wednesday, November 27, 2013, 08:27, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout 
Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.
IOC rebooted this morning. Archivers restarted.
Entry  Tuesday, November 05, 2013, 15:50, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated Vacuum.png
Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.
Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.
    Reply  Wednesday, November 20, 2013, 08:57, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Tuesday, November 12, 2013, 12:38, Anders Mjos, , , , , , , Problems/Solutions, Vacuumed desk, on and around the beam line 
 
ELOG V2.9.2-2455